Laserfiche WebLink
UTILITIES COMMISSION MEETING <br />TO:FROM: <br />ERMU Commission Chris Kerzman –Engineering Manager <br />MEETING DATE: AGENDA ITEM NUMBER: <br />November 9, 2021 5.6 <br />SUBJECT: <br />Field Services Facility Expansion ProjectUpdate <br />ACTION REQUESTED: <br />None <br />BACKGROUND: <br />Construction continues on the Field Services Facility. <br />DISCUSSION: <br />Steel installation has been going very well andthe majority of the joists and decking have been <br />installed. There are now a couple weeks of detailing to be completed. There has been a lot of <br />earthwork and grading happening to prepare for laying the first course of asphalt during the <br />week of November 8. The concrete contractors have installed the retaining walls for stairway <br />entries, stoop foundations, and block wall for overhead doors. <br /> <br />Work over the next month will include curb installation and paving through the middle of the <br />site, followed by outdoor electrical installation. Inside the building, the plumbing contractor will <br />be working on underground piping installation to prepare for the floor pour, while the steel <br />contractor finishes up detailing and the precast panel wall contractor finishes up caulking and <br />detailing. The roofing contractor is optimistic that they have an option for insulation. We are <br />working through those details with Kodet Architectural Group, LTD and RJM Construction. <br />______________________________________________________________________________ <br />Page 1 of 1 <br />97 <br />