Laserfiche WebLink
(06)NSPS Design Plan,May 2012and Title V Air Permit,November 29, 2012as <br />updated/revised as it applies to the Landfill Property described on Exhibit A. <br />(07) “Leachate Recirculation Permit Application”, July 2009, revised March 2012 <br />as it applies to the Landfill Property described on Exhibit A. <br />(08)Closure, Postclosure and Contingency Action Plan for the MSW Area”, <br />February2004, revised March 2012as updated/revised,as it applies to the <br />Landfill Property described on Exhibit A. <br />(09)“Stormwater Pollution Prevention Plan”, May 2010or as updated/revised. <br />(10) “Construction Quality Assurance Program”, February 2004, , revised March <br />2012as it applies tothe Landfill Property described onExhibit A. <br />(11) “Sampling and Analysis Plan”, March 2017, revised March 30, 2018oras <br />updated/modified. <br />(12)“2020Annual Report”, January 2021or as updated annually. <br />(13)“2020Water Quality Report”, January2021or as updated annually. <br />(14)“Long-Term Development Plan”, March 1997, and as revised on <br />April 15, 1997 to include a maximum final elevation of 1120 feet MSL. <br />(15)“Industrial Solid Waste Management Plan”, April 2008, Revised June 2014, <br />as it applies to the Landfill Property described on Exhibit A. <br />(16) “Landscaping Plans”, September 24, 2012 as prepared by Stantec <br />(17) “Section 329300, Trees, Shrubs, Perennials -Technical Specifications” 2012 <br />as prepared by Stantec. <br />(18) “Supplemental Site-Wide Hydrogeologic Evaluation Report”, June 2015. <br />(19) "Groundwater Corrective Action Alternatives Screening Report" August <br />2020 <br />(20) "Groundwater Corrective Action Work Plan"March2021 <br />3 <br /> <br />