Laserfiche WebLink
Partial Pay Estimate No.: <br />WINDSOR PARK 3RD ADDITION SEWER EXTENSION <br />CITY OF ELK RIVER, MN <br />BMI PROJECT NO. R19.122405 <br />WORK COMPLETED THROUGH SEPTEMBER 30th , 2021 <br />ITEM <br />NO. <br />ITEM <br />UNIT <br />PRICE <br />AS BID <br />PREVIOUS ESTIMATE <br />COMPLETED TO <br />DATE <br />ESTIMATED <br />QUANTITY <br />ESTIMATED <br />AMOUNT <br />ESTIMATED <br />QUANTITY <br />ESTIMATED <br />AMOUNT <br />ESTIMATED <br />QUANTITY <br />ESTIMATED <br />AMOUNT <br />1 <br />MOBILIZATION <br />$35,000.00 <br />1 <br />LUMPSUM <br />$35,000.00 <br />0.9 <br />LUMPSUM <br />$31,500.00 <br />0.90 <br />LUMPSUM <br />$31,500.00 <br />2 <br />CLEARING & GRUBBING <br />$660.00 <br />10 <br />TREE <br />$6,600.00 <br />0 <br />TREE <br />$0.00 <br />0.00 <br />TREE <br />$0.00 <br />3 <br />REMOVE BITUMINOUS PAVEMENT <br />$3.00 <br />785 <br />SY <br />$2,355.00 <br />352 <br />SY <br />$1,056.00 <br />352.00 <br />SY <br />$1,056.00 <br />4 <br />REMOVE FENCE <br />$5.00 <br />50 <br />LF <br />$250.00 <br />51 <br />LF <br />$255.00 <br />51.00 <br />LF <br />$255.00 <br />5 <br />REMOVE SEWER MANHOLE <br />$1,845.00 <br />1 <br />EACH <br />$1,845.00 <br />0 <br />EACH <br />$0.00 <br />1.00 <br />EACH <br />$1,845.00 <br />6 <br />SALVAGE & INSTALL SIGN <br />$630.00 <br />2 <br />EACH <br />$1,260.00 <br />2 <br />EACH <br />$1,260.00 <br />2.00 <br />EACH <br />$1,260.00 <br />7 <br />SALVAGE & INSTALL MAILBOX <br />$185.00 <br />3 <br />EACH <br />$555.00 <br />0 <br />EACH <br />$0.00 <br />0.00 <br />EACH <br />$0.00 <br />8 <br />DEWATERING <br />$67,500.00 <br />1 <br />LS <br />$67,500.00 <br />1 <br />LS <br />$67,500.00 <br />1.00 <br />LS <br />$67,500.00 <br />9 <br />BYPASS PUMPING <br />$11,400.00 <br />1 <br />LS <br />$11,400.00 <br />1 <br />LS <br />$11,400.00 <br />1.00 <br />LS <br />$11,400.00 <br />10 <br />GRANULAR BORROW <br />$18.00 <br />550 <br />TON <br />$9,900.00 <br />973.34 <br />TON <br />$17,520.12 <br />973.34 <br />TON <br />$17,520.12 <br />11 <br />8" TRENCHLESS GRAVITY SEWER MAIN <br />$44.00 <br />3390 <br />LF <br />$149,160.00 <br />3390 <br />LF <br />$149,160.00 <br />3,390.00 <br />LF <br />$149,160.00 <br />12 <br />6" TRENCHLESS FORCE MAIN <br />$29.00 <br />3050 <br />LF <br />$88,450.00 <br />3012 <br />LF <br />$87,348.00 <br />3,012.00 <br />LF <br />$87,348.00 <br />13 <br />CASTING ASSEMBLY <br />$435.00 <br />11 <br />EACH <br />$4,785.00 <br />10 <br />EACH <br />$4,350.00 <br />11.00 <br />EACH <br />$4,785.00 <br />14 <br />SANITARY MANHOLE <br />$1,875.00 <br />110 <br />LF <br />$206,250.00 <br />99.73 <br />LF <br />$186,993.75 <br />108.22 <br />LF <br />$202,912.50 <br />15 <br />CONSTRUCT LIFT STATION & VALVE VAULT <br />$225,035.00 <br />1 <br />LUMPSUM <br />$225,035.00 <br />1 <br />LUMPSUM <br />$225,035.00 <br />1.00 <br />LUMPSUM <br />$225,035.00 <br />16 <br />AIR RELIEF MANHOLE <br />$10,230.00 <br />3 <br />EACH <br />$30,690.00 <br />3 <br />EACH <br />$30,690.00 <br />3.00 <br />EACH <br />$30,690.00 <br />17 <br />CHECK VALVE MANHOLE <br />$23,284.00 <br />1 <br />EACH <br />$23,284.00 <br />1 <br />EACH <br />$23,284.00 <br />1.00 <br />EACH <br />$23,284.00 <br />18 <br />CONNECT TO EXISTING FORCEMAIN <br />$1,200.00 <br />2 <br />EACH <br />$2,400.00 <br />2 <br />EACH <br />$2,400.00 <br />3.00 <br />EACH <br />$3,600.00 <br />19 <br />BOLLARD <br />$220.00 <br />5 <br />EACH <br />$1,100.00 <br />5 <br />EACH <br />$1,100.00 <br />5.00 <br />EACH <br />$1,100.00 <br />20 <br />ELECTRICAL GENERATOR <br />$32,460.00 <br />1 <br />EACH <br />$32,460.00 <br />1 <br />EACH <br />$32,460.00 <br />1.00 <br />EACH <br />$32,460.00 <br />21 <br />V CHAIN LINK FENCE AND GATES <br />$56.00 <br />87 <br />LF <br />$4,872.00 <br />87 <br />LF <br />$4,872.00 <br />87.00 <br />LF <br />$4,872.00 <br />22 <br />4' CHAIN LINK FENCE <br />$28.40 <br />50 <br />LF <br />$1,420.00 <br />51 <br />LF <br />$1,448.40 <br />51.00 <br />LF <br />$1,448.40 <br />23 <br />7" CONCRETE PAVEMENT <br />$134.00 <br />131 <br />SY <br />$17,554.00 <br />96 <br />SY <br />$12,864.00 <br />107.00 <br />SY <br />$14,338.00 <br />24 <br />12" CONCRETE PAVEMENT <br />$243.00 <br />30 <br />SY <br />$7,290.00 <br />8 <br />SY <br />$1,944.00 <br />8.00 <br />SY <br />$1,944.00 <br />25 <br />BITUMINOUS PATCH - ROADWAY <br />$60.00 <br />720 <br />SY <br />$43,200.00 <br />404 <br />SY <br />$24,240.00 <br />404.00 <br />SY <br />$24,240.00 <br />26 <br />BITUMINOUS PATCH - TRAIL <br />$41.00 <br />65 <br />SY <br />$2,665.00 <br />0 <br />SY <br />$0.00 <br />0.00 <br />SY <br />$0.00 <br />27 <br />AGGREGATE SURFACING CLASS 2 <br />$33.00 <br />30 <br />CY <br />$990.00 <br />0 <br />CY <br />$0.00 <br />0.00 <br />CY <br />$0.00 <br />28 <br />TRAFFIC CONTROL <br />$4,620.00 <br />1 <br />LUMPSUM <br />$4,620.00 <br />0.9 <br />LUMPSUM <br />$4,158.00 <br />0.90 <br />LUMPSUM <br />$4,158.00 <br />29 <br />TOPSOIL BORROW <br />$18.00 <br />400 <br />CY <br />$7,200.00 <br />175 <br />CY <br />$3,150.00 <br />175.00 <br />CY <br />$3,150.00 <br />30 <br />SEEDING <br />$3,230.00 <br />0.9 <br />ACRE <br />$2,907.00 <br />0.9 <br />ACRE <br />$2,907.00 <br />0.90 <br />ACRE <br />$2,907.00 <br />31 <br />SEED MIXTURE 25-121 <br />$5.00 <br />135 <br />LB <br />$675.00 <br />100.5 <br />LB <br />$502.50 <br />100.50 <br />LB <br />$502.50 <br />32 <br />FERTILIZER TYPE 3 <br />$1.00 <br />315 <br />LB <br />$315.00 <br />105 <br />LB <br />$105.00 <br />105.00 <br />LB <br />$105.00 <br />33 <br />EROSION CONTROL BLANKETS CATEGORY 3N <br />$2.20 <br />4350 <br />SY <br />$9,570.00 <br />5438 <br />SY <br />$11,963.60 <br />5,438.00 <br />SY <br />$11,963.60 <br />34 <br />SEDIMENT CONTROL LOG TYPE WOOD FIBER <br />$4.00 <br />1400 <br />LF <br />$5,600.00 <br />800 <br />LF <br />$3,200.00 <br />1,400.00 <br />LF <br />$5,600.00 <br />35 <br />STABILIZED CONSTRUCTION EXIT <br />$935.00 <br />1 <br />LUMPSUM <br />$935.00 <br />1 <br />LUMPSUM <br />$935.00 <br />1.00 <br />LUMPSUM <br />$935.00 <br />36 <br />4" SOLID LINE MULTI COMP <br />$3.00 <br />220 <br />LF <br />$660.00 <br />0 <br />LF <br />$0.00 <br />0.00 <br />LF <br />$0.00 <br />Al <br />REMOVE FENCE <br />$4.00 <br />445 <br />LF <br />$1,780.00 <br />390 <br />LF <br />$1,560.00 <br />390.00 <br />LF <br />$1,560.00 <br />A2 <br />REMOVE SAND FILTER MEDIA <br />$22.00 <br />1650 <br />CY <br />$36,300.00 <br />0 <br />CY <br />$0.00 <br />0.00 <br />CY <br />$0.00 <br />A3 <br />REMOVE UNDERGOUND TANK <br />$5,650.00 <br />3 <br />EA <br />$16,950.00 <br />0 <br />EA <br />$0.00 <br />0.00 <br />EA <br />$0.00 <br />A4 <br />COMMON BORROW <br />$12,00 <br />2400 <br />TON <br />128,800.00 <br />291.55 <br />TON <br />$3,498.60 <br />291.55 <br />TON <br />$3,498.60 <br />TOTAL AMOUNT: <br />$1,094,582.00 <br />$950,659.97 <br />$973,932.72 <br />