My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 ERMUSR 10-12-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2021
>
10-12-2021
>
5.3 ERMUSR 10-12-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2021 3:11:31 PM
Creation date
10/8/2021 3:11:31 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITIES COMMISSION MEETING <br />TO:FROM: <br />ERMU Commission Chris Kerzman –Engineering Manager <br />MEETING DATE: AGENDA ITEM NUMBER: <br />October 12, 20215.3 <br />SUBJECT: <br />Field Services Facility Expansion ProjectUpdate <br />ACTION REQUESTED: <br />None <br />BACKGROUND/DISCUSSION: <br />Construction continues on the Field Services Facility. Molin Concrete Products mobilized their <br />equipment September 13 and has made great progress setting wall panels; the final panels are <br />scheduled to be set a week ahead of schedule on October 8. Molinwill now concentrate on <br />detail work, sealant, and repairing any imperfections. <br />Structural steel will be arriving the week of October 11, with roof joists and decking arriving the <br />week of October 18. During the same timeframe the earthwork contractor will be back to <br />finalize site grading, the plumber will be on site for sanitary install within the building footprint, <br />and RJM Construction will be working to get the first course of asphalt down before winter. <br />Roof insulation is still looking to be an unknown, and the roofing contractor is working to come <br />up with possible solutions. <br />The site utilities contractor has made good progress installing the drain tile around the <br />foundation and has installed a majority of the storm sewer system. RJM is working with them to <br />finalize a plan for the structure in the contaminated soils. <br />For progress updates and site work photos, please visit the ERMU Field Services Building <br />Expansion Project page on our website. <br />RJM will have a representative at the October 12 commission meeting to discuss the status of <br />the allowances and contingency budgets. <br />______________________________________________________________________________ <br />Page 1 of 1 <br />83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.