My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.0 ERMUSR 07-08-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2009
>
07-08-2009 SPECIAL
>
3.0 ERMUSR 07-08-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2021 3:53:54 PM
Creation date
10/4/2021 3:25:02 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/8/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AD 0 y • <br /> m Cjtr <br /> i ient e % aseloa • Ca . achy (cont'd) <br /> Big Stone II supports the " Green PackageLI " <br /> Supersized transmission lines that will enable 800 to 1000 MW <br /> of additional wind development <br /> Will unlock about $2 Billion in private capital investment in <br /> renewables. <br /> • Supercritical pulverized coal technology, with ultra- <br /> supercritical technology being considered <br /> Will be one of the most fuel-efficient coal plants in the U .S. <br /> • Common scrubber to be added to existing Big Stone I unit as <br /> part of the Big Stone II project. <br /> Will result in decreased site emissions of SO2, particulates and <br /> mercury, while site electric output will be more than doubled. <br /> • Plant to be built "carbon-capture retrofit-ready" <br /> For when carbon capture technology becomes available. <br /> All credible forecasts of meeting future U .S. carbon reduction goals <br /> include large amounts of coal power plants with carbon capture. <br /> The Big Stone project wa.:i designed to be a part of <br /> its Owners' environmentally-responsible resource portfolios. 31 <br /> C <br />
The URL can be used to link to this page
Your browser does not support the video tag.