My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.0 ERMUSR 07-08-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2009
>
07-08-2009 SPECIAL
>
3.0 ERMUSR 07-08-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2021 3:53:54 PM
Creation date
10/4/2021 3:25:02 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/8/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RW Beck Studyfor E U .......... <br /> * re-, . <br /> Natural Gas Price Volatility <br /> .,.- - , , <br /> , , <br /> Levelized Power Supply Cost for 2019-2028 ' . <br /> Base Low Gas/ High Gas/ <br /> Case No CO2 Base CO2 <br /> Case 1 - GRE $/MWh $115.43 - $145.13 $81.99 - $101.32 $116.80 - $154.93 <br /> t Case 2A - BSII + Gas (Muni) $/MWh $121.23 $90.64 $123.47 i { <br /> Case 2B - BSII + Gas (Merchant) $/MWh $146.07 - - <br /> Case 3A - Gas (Muni) $/MWh $129.42 $109.77 $149.13 <br /> Case 3B - Gas (Merchant) $/MWh $164.59 - - <br /> Case 4 - BSII + Mkt $/MWh $124.67 $93.75 $127.39 <br /> Plans with large amounts of natural gas in them (Case 1A (GRE) and Case 3) <br /> have higher potential price volatility than plans with Big Stone II. <br /> *RW Beck study for ERMU 6/15/09, updated 6/30/09 to include High Gas scenario 12 <br /> for Case 3A, 6/30/09. I , <br />
The URL can be used to link to this page
Your browser does not support the video tag.