My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.0 ERMUSR 07-08-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2009
>
07-08-2009 SPECIAL
>
3.0 ERMUSR 07-08-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2021 3:53:54 PM
Creation date
10/4/2021 3:25:02 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/8/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> ist 11' ecovery Scenarios (cont'd) eR4 <br /> Scenario DD: Project Cancelled J 2012 <br /> Scenario D : 1 <br /> • Project completes construction through June 2012 . <br /> • Project cancelled on 7/ 1/2012 . <br /> • Project construction is about one-half completed (see chart 4). <br /> • Plant portion of project has no market (salvage) value. <br /> • Transmission portion of project has 100% market value. <br /> And represents about 16% of total project cost to-date. <br /> • ERMU must recover BSPII plant costs from utility customers. <br /> • ERMU must replace planned BSPII plant output with other <br /> resources.2 <br /> 1 . This is a very unlikely scenario. While possible, CMMPA views the probability of this <br /> Scenario occurring as low. <br /> 2. Replacement resources assumed to be Connexus incremental costs, RW Beck study <br /> Case 1 B. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.