Laserfiche WebLink
e <br /> ist 11' ecovery Scenarios (cont'd) eR4 <br /> Scenario DD: Project Cancelled J 2012 <br /> Scenario D : 1 <br /> • Project completes construction through June 2012 . <br /> • Project cancelled on 7/ 1/2012 . <br /> • Project construction is about one-half completed (see chart 4). <br /> • Plant portion of project has no market (salvage) value. <br /> • Transmission portion of project has 100% market value. <br /> And represents about 16% of total project cost to-date. <br /> • ERMU must recover BSPII plant costs from utility customers. <br /> • ERMU must replace planned BSPII plant output with other <br /> resources.2 <br /> 1 . This is a very unlikely scenario. While possible, CMMPA views the probability of this <br /> Scenario occurring as low. <br /> 2. Replacement resources assumed to be Connexus incremental costs, RW Beck study <br /> Case 1 B. <br /> 11 <br />