My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.0 ERMUSR 07-08-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2009
>
07-08-2009 SPECIAL
>
3.0 ERMUSR 07-08-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2021 3:53:54 PM
Creation date
10/4/2021 3:25:02 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/8/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Expenditures and Amortization <br /> Phase 2: Construction* (Assumes 30 MW F.RMU Share) <br /> Project construction cost : $ 100 million <br /> Includes both plant and transmission . <br /> Includes the $3 . 4M development cost <br /> from Phase 1 . <br /> Interest During Construction <br /> • Interest on the $ 100M to 2016 in-service $23 million <br /> • To be included in bonding . <br /> Total capital cost <br /> To be recovered in rates during Phase 3 : $ 123 million <br /> * Assumes CMMPA does bond financing for all ERMU costs 17 <br /> and interest, at 5.5 /o interest rate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.