Laserfiche WebLink
Document G701™ – 2017 <br />Change Order <br />AIA Document G701™ – 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The “American <br />Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document <br />was produced by AIA software at 13:47:32 CT on 09/15/2021 under Order No.1547896054 which expires on 04/24/2022, is not for resale, is licensed for one- <br />time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail <br />copyright@aia.org. <br />User Notes: (3B9ADA58) <br />1 <br />PROJECT: (Name and address)CONTRACT INFORMATION:CHANGE ORDER INFORMATION: <br />20-700 Elk River Public Safety Building <br />Expansion <br />Contract For: General Construction Change Order Number: 20-700-001 <br /> Date: October 19, 2020 Date: September 15, 2021 <br />OWNER: (Name and address)ARCHITECT: (Name and address)CONTRACTOR: (Name and address) <br />City of Elk River BKV Group Terra General Contractors <br />13065 Orono Parkway NW <br />Elk River, MN 55330      <br />222 N 2nd St, #101 <br />MInneapolis, MN 55401      <br />21025 Commerce Blvd Ste 1000 <br />Rogers MN 55374      <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments <br />attributable to executed Construction Change Directives.) <br />COR #14 - PD - Additional Scope of Work for Roof Drain at Existing PD Garage $24,931.50. <br />COR #37 - PD - Perform Corrections to 2nd Level Existing Window Sill $455.00. <br />COR #46 - PD - Storm Sewer Install Added Scope $2,800.00. <br />COR #53 - PD - Existing SOG Moisture Mitigation SWAT 171 $704.00. <br />COR #60 - FD - Repair ITT Damaged Storm Pipe due to Compaction Testing $113.06. <br />COR #65 - PD - Perform Wall Corrections to 2nd Level Existing Walls $2,355.00. <br />COR #81R - FD - Use Construction Contingency to add Fire Station #2 Office Remodel Scope of Work per PR#19 <br />$62,619.63. No change to the GMP. <br />COR #100 & 101 - Transfer Building Permit costs included in Terra's GC's to the construction contingency. Permit costs were <br />paid directly by the owner ($126,756.00). No change to the GMP. <br />COR #123 - PD - Swat Bay 171 Light Upgrade $3,583.00. <br />COR #134 - City Hall - Mill & Overlay at Existing Parking Lot $39,167.86. <br />COR #137 - PD - Additional Scope of Work to Repair Existing 1st Floor Offices $4,656.00.      <br />The original Guaranteed Maximum Price was $6,290,219.00 <br />The net change by previously authorized Change Orders $0.00 <br />The Guaranteed Maximum Price prior to this Change Order was $6,290,219.00 <br />The Guaranteed Maximum Price will be increased by this Change Order in the amount of $78,765.42 <br />The new Guaranteed Maximum Price including this Change Order will be $6,368,984.42 <br />The Contract Time will be increased by One Hundred Ten (110) days. <br />The new date of Substantial Completion will be 2/1/2022 - Elk River Public Safety <br />NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract <br />Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />BKV Group Terra General Contractors City of Elk River <br />ARCHITECT (Firm name)CONTRACTOR (Firm name)OWNER (Firm name) <br /> <br />SIGNATURE SIGNATURE SIGNATURE <br /> <br />PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE <br /> <br />DATE DATE DATE