My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-14-2008 ERMU MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Minutes
>
2000-2009
>
2008
>
10-14-2008 ERMU MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 3:44:19 PM
Creation date
9/16/2021 3:44:18 PM
Metadata
Fields
Template:
City Government
type
ERMUMIN
date
10/14/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 <br /> Regular meeting of the Elk River Municipal Utilities Commission <br /> October 14,2008 <br /> Lori Johnson informed the commission of the rate increase of 6.5%for insurance of <br /> property and vehicles for 2009. If the deductible was changed to$10,000 there would be <br /> approximately a$28,750 savings. This will be addressed at the next City Council meeting <br /> scheduled for October 20t. <br /> John Dietz moved to approve raising the insurance deductible to$10,000. Jerry Gumphrey <br /> seconded the motion. Motion carried 3-0. <br /> 5.2 Review&Consider Bid Tabulation for Plant Roof <br /> As discussed at the previous Elk River Municipal Utilities Commission meeting,the roof <br /> at the power plant is leaking and in need of repair. Staff has prepared plans,specifications, <br /> and secured quotations. Staff recommends the project be awarded to the lowest responsive <br /> bidder,McDowall Company. <br /> Jerry Gumphrey moved to award the re-roofing of the power plant to McDowall Company. <br /> John Dietz seconded the motion. Motion carried 3-0. <br /> 5.3 Review Red Flag Policy <br /> By November 1,2008,the Federal Trade Commission(FTC)"Red Flag"regulations are <br /> requiring all banks and other"creditors"to design and approve their own tailored plans for <br /> preventing their customers' information from being stolen or used illegally. Under these <br /> regulations,the term"creditor"encompasses all utilities,including municipal utilities,because <br /> they provide service ahead of payment. "Red Flag"is the term used in the regulations to refer <br /> to warning signs that a customer's personal information has been compromised. <br /> Theresa Slominski remarked that a lot of the requirements in this red flag policy are <br /> already in place. A proposed policy which was reviewed by the attorney was presented for <br /> adoption. <br /> John Dietz moved to adopt the Red Flag/Identity theft Protection Policy as of November 1, <br /> 2008,as presented. Jerry Gumphrey seconded the motion. Motion carried 3-0. <br /> 5.4 Review All Requirements Contract <br /> Since 1990,Elk River Municipal Utilities and Anoka Electric Cooperative,now <br /> Connexus Energy,has had an all requirements contract where Connexus Energy,through <br /> Great River Energy,supplies all of our power and energy needs. This agreement included a <br /> termination clause allowing either party to give a 120 month(10 year)notice to terminate this <br /> agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.