My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1j ERMUSR 09-14-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2021
>
09-14-2021
>
6.1j ERMUSR 09-14-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2021 11:48:35 AM
Creation date
9/13/2021 11:48:35 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITIES COMMISSION MEETING <br />TO: FROM: <br />ERMU Commission Dave Ninow – Water Superintendent <br />MEETING DATE: AGENDA ITEM NUMBER: <br />September 14, 2021 6.1j <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br /> Delivered 12 new water meters. <br /> Sealed the water meter, installed encoder receiver transmitter, and took curb stop ties <br />from 11 water services. <br /> Completed 15 BACTI/Total Chlorine Residual Samples <br />o All confirmed negative for Coliform Bacteria. <br />o Bacteriological/Disinfectant Residual Monthly Report submitted to the <br />Minnesota Department of Health (MDH). <br /> Completed 22 routine fluoride samples <br />o All samples met MDH standards. <br />o Submitted MDH Fluoride Report <br /> Completed two Total Trihalomethanes and Haloacetic Acids samples for the MDH. <br /> We have received the executedgrant of easements that we were seeking for the <br />Watermain Relocation Improvements project; this will allow us to drop the alternate <br />from our bid, saving $66,455. <br />Work is scheduled to start mid-Septemberfor relocating water main in preparationfor <br />the highway 169 project. <br />There has been positive response to ourbackflow prevention program. We have <br />performed tests onclose to twodozen residential irrigation backflow prevention <br />devices. <br /> Sprint/T-Mobile has started work on upgrading cell antenna equipment on Gary Street <br />Water Tower. <br /> We have replaced numerous large commercial water meters this year. The meters are <br />reaching the end of their life cycle and are failing to transmit readings. <br />The water operators have been locating and exercising watermainvalves and <br />performing fire hydrant repair and maintenance. <br /> <br />ATTACHMENTS: <br />August2021 Pumping by Well <br />______________________________________________________________________________ <br />Page 1 of 1 <br />101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.