Laserfiche WebLink
UTILITIES COMMISSION MEETING <br />TO:FROM: <br />ERMU Commission Mike Tietz –Technical Services Superintendent <br />MEETING DATE: AGENDA ITEM NUMBER: <br />September 14, 2021 6.1i <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />• In August, the locators processed 625 locate tickets. These consisted of 8 emergency <br />tickets, 503 normal tickets, 5 non-excavation tickets, 3 boundary surveys, 70 updated <br />tickets, 20 cancellations, and 16 locate meets. This resulted in a 14.9% increase of <br />tickets from the previous month and an 1.6% increase from the prior year. <br /> <br />• Electrical technicians completed 269 service order tasks, updated the power bill, <br />attended to customer meter/power quality issues and off-peak concerns. <br /> <br />• On August 27, staff ran generators #1, #2, #3 & #4. Cooling water was significantly low <br />on #1 & #2, we will continue to monitor this. We have sent the4 fuel injectors from <br />Engine #3 in for rebuild. <br /> <br />• Mapping department continues to work on implementing mPower Integrator software. <br />Staff has also been busy using GPS to record locations of our underground facilities <br />around the power plant and around the system. <br /> <br />• The substation apparatus technician identified another disconnect switch at Station 14, <br />Bank #4 that needed immediate attention. We suspect that contaminants from Great <br />River Energy’s decommissioned power plant and the subsequent demolition of the <br />facility have been a major contributor to the problems occurring at that location. <br /> <br />• I have been focusing my time on Capital Project budgeting and the Advanced Metering <br />Infrastructure (AMI) project. I am in the process of obtaining quotes from several <br />consultants to help us with the AMI project. <br /> <br />• Chris Kerzman, Jon Wadsworth, and I met with Connexus Energy to examine their <br />substation perimeter fence security system and video surveillance system as a possible <br />future enhancement at ERMU’s substations. <br /> <br />______________________________________________________________________________ <br />Page 1 of 2 <br />99 <br />