Laserfiche WebLink
Housing and Redevelopment Minutes Page 2 <br /> August 2,2021 <br /> ----------------------------- <br /> 6. Public Hearings <br /> There were no public hearings. <br /> 7.1 HRA Housing Rehabilitation Loan Program Update <br /> Ms. Eddy presented the staff report. <br /> 7.2 Main and Gates Update <br /> Ms. Eddy presented the staff report. It <br /> Moved by Commissioner Chuba seconded by Commissioner Wagner to approve the <br /> report submitted by American Engineering Testing, Inc. of the Preliminary Report <br /> of Geotechnical Exploration for the Main and Gates Redevelopment which includes <br /> the preliminary subsurface exploration results (soil borings) as outlined in the staff <br /> report. <br /> Motion carried 4-0. <br /> Ms. Eddy presented a handout regarding the downtown hanging baskets and a recent <br /> request for proposals by the HRA for installation and maintenance of downtown baskets. <br /> She stated the handout was a quote from Yardworx Outdoor Services proposing a 3-year <br /> contract for growing,installation, and maintenance of the downtown hanging baskets. She <br /> stated staff is requesting approval of the proposed quote as outlined in the handout. She <br /> stated it does align with the proposed 2022 budget as $25,000 is proposed annually. <br /> Commissioner Chuba asked about the status of the HRA to purchase larger pots with the <br /> larger water reservoir. <br /> Al <br /> Ms. Eddy stated the water reservoir pots were already budgeted for in 2021 and once the <br /> agreement is signed with Yardwofx,the pots will be delivered to them in the fall for storage <br /> and planting. <br /> Commissioner Swenson asked about the 3-year contract length. <br /> Ms. Eddy explained in May when Suzanne Fischer presented this item,it was the consensus <br /> of the HRA to propose a 3-year term in the RFP so the HRA would not have to revisit the <br /> topic annually. <br /> Commissioner Wagner stated she likes the 3-year contract proposal as it provides stability <br /> for this program,the plantings and care will remain consistent, and it will show great results. <br /> Commissioner Chuba asked about the entire process. <br />