My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.7.-5.10. PCSR 08-23-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2005
>
08/23/2005
>
5.7.-5.10. PCSR 08-23-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2007 3:01:24 PM
Creation date
8/22/2005 10:43:24 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
8/23/2005
case
P 05-16
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. A plaza area is provided for a central gathering area and passive recreation. This area is intended <br />to be a shared amenity for the entire development. <br />G. The construction and expansion of the Highway 10 Service Road has been requested by the City <br />of Elk River and is being proposed as part of this development. This will provide a key access <br />route for the proposed site and surrounding areas along the service road for further development. <br />H. An extension of utility services as requested by the City of Elk River is also being proposed as <br />part of this development. This will greatly enhance future growth to the west side ofthe City. <br /> <br />The overall design/development of Heritage Maples had many constraints as well. However, New <br />Century Land Development feels the overall design best fits the existing site due to the current conditions <br />while providing an attractive residential enclave. Some of the existing site constraints are as follows: <br /> <br />A. The site is currently odd shaped in a triangular fashion and is bisected by an overhead electric <br />power line. The current design reflects clustering of residential units lessened site impacts to the <br />surrounding area. <br />B. The service road also proposes difficulty on the proposed development. Additional right-of-way <br />taking has been requested for the advancement of the existing service road. The site is already <br />small in nature and proposes many environmental difficulties, such as the existing wetland/low <br />area located on the east and southeast portion of the site. Altering the current design to meet <br />current setback requirement for the proposed right-of-way taking will greatly impact overall <br />function of the proposed development. <br /> <br />Conclusion <br /> <br />As mentioned earlier, New Century Land Development is requesting the site be rezoned to a PUD <br />Development for the flexibility in the required setbacks. We feel the Heritage Maples development will <br />provide added character and enhanced residential living in the City of Elk River. <br /> <br />Weare excited and look forward to working with city staff on this development in efforts to provide a <br />high quality development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.