My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. PCSR 08-23-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2005
>
08/23/2005
>
5.6. PCSR 08-23-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2007 3:02:45 PM
Creation date
8/22/2005 10:35:38 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
8/23/2005
case
CU 05-16
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />WWW.RYANCOMPANIES.COM <br /> <br />RYAN COMPANIES US, INC. <br />50 South Tenth Street, Suite 300 <br />Minneapolis, MN 55403- <br />2012 <br /> <br />BUILDING LASTING REunONSHIPS <br /> <br />gaYAH <br /> <br />612-492-4000 tel <br />612-492-3000 fax <br /> <br />Property Ownership <br />The existing Elk Path Business Center, Second Addition, is owned by Hoyt Partners. Sherburne County <br />has purchased the property contract-for-deed. In order to sell the property to Target, the County must <br />subdivide the portion of the property that is to be sold, and transfer ownership to the County Housing <br />and Redevelopment Authority (BRA). <br /> <br />According to the terms of their ownership, the County must also adopt a Redevelopment Plan and a <br />Project Plan. Both these processes require a public hearing process and are subject to a public comment <br />period. They can, however, be processed simultaneously. <br /> <br />Once the land is platted, the HRA assumes ownership of the property, and the Redevelopment Plan and <br />Project Plans are adopted, the County can sell the property to Target. Hoyt Partners is aware of the <br />pending subdivision and land sale and has signed the application form as the owner. Target <br />Corporation will own and maintain the facility. <br /> <br />Existing Conditions <br />The proposed Target site is undeveloped rolling topography. There are no trees on site with the <br />exception of the westerly edge of a tree stand that extends approximately 30 to 40 feet into the easterly <br />site boundary. The majority of the site is presendy tilled, with the exception of a golf driving range that <br />fronts on Waco Street that measures approximately 10 acres. <br /> <br />Geotechnical investigation has shown that on-site soils are well-drained sands and gravels that will <br />support high bearing pressures, and will infiltrate stormwater. <br /> <br />Application Process <br />This application includes a Preliminary Plat and Final Plat application to accomplish the subdivision of <br />property described above; a Conditional Use Permits for: "Loading areas/overhead doors when located <br />in front yards" and "above ground storage tanks"; and Site Plan Approval. <br /> <br />Preliminary Plat <br />The proposed preliminary plat of the Elk Path Business Center Third Addition proposes to <br />subdivide the existing 76.4 acre Oudot A of the Second Addition into: <br />o 28.5 acre Lot 1, Block 1 <br />o 0.6 acre extension of 182nd Street <br />o The remaining 47.3 acres of undeveloped property will be re-platted as Oudot A, Elk Path <br />Business Park Third Addition. <br /> <br />The plat also proposes perimeter drainage & utility easements per City ordinance. Utility easements <br />are proposed over the public watermain that makes up public fire loop around the perimeter of <br />building and for the hydrant leads. <br />
The URL can be used to link to this page
Your browser does not support the video tag.