nadee Creek
<br />07-7900
<br />7D
<br />00#1 PR#2R Caulk Patching
<br />$ -
<br />$ -
<br />$ 190.00
<br />$ 190.00
<br />$ 190.00
<br />$ 190.00
<br />nadee Creek
<br />07-7900
<br />7D
<br />00#2 RFI#12
<br />$ -
<br />$ -
<br />$ 1,480.00
<br />$ 1,480.00
<br />$ 1,480.00
<br />$ 1,480.00
<br />:entral Door
<br />08-8200
<br />8A
<br />Hardware Material
<br />$ 36,623.00
<br />$ -
<br />$ -
<br />$ 36,623.00
<br />$ 25,706.61
<br />$ 10,916.39
<br />$ 36,623.00
<br />:entral Door
<br />08-8200
<br />8A
<br />HM Door Material
<br />$ 11,098.00
<br />$ -
<br />$ -
<br />$ 11,098.00
<br />$ 7,109.02
<br />$ 3,988.98
<br />$ 11,098.00
<br />:entral Door
<br />08-8200
<br />8A
<br />HM Frame Material
<br />$ 22,122.00
<br />$ -
<br />$ -
<br />$ 22,122.00
<br />$ 22,122.00
<br />$ 22,122.00
<br />:entral Door
<br />08-8200
<br />8A
<br />Specialty Material
<br />$ 3,541.00
<br />$ -
<br />$ -
<br />$ 3,541.00
<br />$ 3,541.00
<br />$ 3,541.00
<br />:entral Door
<br />08-8200
<br />8A
<br />WD Door Material
<br />$ 12,861.00
<br />$ -
<br />$ -
<br />$ 12,861.00
<br />$ 12,861.00
<br />$ 12,861.00
<br />:entral Door
<br />08-8200
<br />8A
<br />00#1
<br />$ -
<br />$ -
<br />$ 1,294.50
<br />$ 1,294.50
<br />$ 1,294.50
<br />$ 1,294.50
<br />:entral Door
<br />08-8200
<br />8A
<br />00#2 RFI#109
<br />$ -
<br />$ -
<br />$ 513.58
<br />$ 513.58
<br />$ 513.58
<br />$ 513.58
<br />Ford Doors
<br />08-8361
<br />8B
<br />OH Doors -Material
<br />$ 50,475.00
<br />$ -
<br />$ -
<br />$ 50,475.00
<br />$ 50,475.00
<br />$ 50,475.00
<br />Ford Doors
<br />08-8361
<br />8B
<br />OH Doors -Labor
<br />$ 12,800.00
<br />$ -
<br />$ -
<br />$ 12,800.00
<br />$ 12,800.00
<br />$ 12,800.00
<br />Ford Doors
<br />08-8361
<br />8B
<br />High Speed Doors -Material
<br />$ 56,525.00
<br />$ -
<br />$ -
<br />$ 56,525.00
<br />$ 56,525.00
<br />$ 56,525.00
<br />Ford Doors
<br />08-8361
<br />8B
<br />High Speed Doors -Labor
<br />$ 5,000.00
<br />$ -
<br />$ -
<br />$ 5,000.00
<br />$ 5,000.00
<br />$ 5,000.00
<br />Ford Doors
<br />08-8361
<br />8B
<br />00#1 High Speed Door VE Option #1
<br />$ -
<br />$ -
<br />$ (6,100.00)
<br />$ (6,100.00)
<br />$ (6,100.00)
<br />$ (6,100.00
<br />Ford Doors
<br />08-8361
<br />8B
<br />00#2 Powder Coat Color for High Speed Doors
<br />$ -
<br />$ -
<br />$ 2,310.00
<br />$ 2,310.00
<br />$ 2,310.00
<br />$ 2,310.00
<br />Ford Doors
<br />08-8361
<br />8B
<br />00#3 Credit Ground Loop at 173A
<br />$ -
<br />$ -
<br />$ (150.70)
<br />$ (150.70)
<br />$ -
<br />$ (150.70)
<br />$ (150.70
<br />Ford Doors
<br />08-8361
<br />8B
<br />00#4 Creditfor single phase OH Door Operator
<br />$ -
<br />$ -
<br />$ (1,992.00)
<br />$ (1,992.00)
<br />$ -
<br />$ (1,992.00)
<br />$ (1,992.00
<br />Ford Doors
<br />08-8361
<br />8B
<br />00#5 RFI#140 Ext access control
<br />$ -
<br />$ -
<br />$ 1,047.00
<br />$ 1,047.00
<br />$ -
<br />$ 1,047.00
<br />$ 1,047.00
<br />:land Glass
<br />08-8800
<br />8C
<br />Aluminum, Glass and Glazing-PD Material
<br />$ 7,462.00
<br />$ -
<br />$ -
<br />$ 7,462.00
<br />$ 7,405.00
<br />$ 57.00
<br />$ 7,462.00
<br />:land Glass
<br />08-8800
<br />8C
<br />Aluminum, Glass and Glazing-PD Labor/GC's
<br />$ 11,810.00
<br />$ -
<br />$ -
<br />$ 11,810.00
<br />$ 10,920.00
<br />$ 890.00
<br />$ 11,810.00
<br />:land Glass
<br />08-8800
<br />8C
<br />Aluminum, Glass and Glazing -Fire Material
<br />$ 31,920.00
<br />$ -
<br />$ -
<br />$ 31,920.00
<br />$ 22,255.00
<br />$ 7,115.00
<br />$ 29,370.00
<br />:land Glass
<br />08-8800
<br />8C
<br />Aluminum, Glass and Glazing -Fire Labor/GC's
<br />$ 16,742.00
<br />$ -
<br />$ -
<br />$ 16,742.00
<br />$ 6,628.00
<br />$ 6,628.00
<br />:land Glass
<br />08-8800
<br />8C
<br />00#1-PR#01
<br />$ -
<br />$ -
<br />$ 2,595.00
<br />$ 2,595.00
<br />$ 2,595.00
<br />$ 2,595.00
<br />:land Glass
<br />08-8800
<br />8C
<br />00#2 RFI#117
<br />$ -
<br />$ -
<br />$ 1,310.00
<br />$ 1,310.00
<br />$ 1,310.00
<br />$ 1,310.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />Mobilization
<br />$ 5,000.00
<br />$ -
<br />$ -
<br />$ 5,000.00
<br />$ 5,000.00
<br />$ 5,000.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />Metal Framing
<br />Material
<br />$ 12,000.00
<br />$ -
<br />$ -
<br />$ 12,000.00
<br />$ 9,600.00
<br />$ 9,600.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />Drywall
<br />Material
<br />$ 20,000.00
<br />$ -
<br />$ -
<br />$ 20,000.00
<br />$ 16,000.00
<br />$ 16,000.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />Taping
<br />Material
<br />$ 4,000.00
<br />$ -
<br />$ -
<br />$ 4,000.00
<br />$ 3,200.00
<br />$ 3,200.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />EIFS
<br />Material
<br />$ 8,000.00
<br />$ -
<br />$ -
<br />$ 8,000.00
<br />$ 8,000.00
<br />$ 8,000.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />Metal Framing
<br />Labor
<br />$ 45,000.00
<br />$ -
<br />$ -
<br />$ 45,000.00
<br />$ 36,000.00
<br />$ 36,000.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />Drywall
<br />Labor
<br />$ 60,000.00
<br />$ -
<br />$ -
<br />$ 60,000.00
<br />$ 48,000.00
<br />$ 48,000.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />Taping
<br />Labor
<br />$ 20,000.00
<br />$ -
<br />$ -
<br />$ 20,000.00
<br />$ 16,000.00
<br />$ 16,000.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />EIFS
<br />Labor
<br />$ 15,000.00
<br />$ -
<br />$ -
<br />$ 15,000.00
<br />$ 15,000.00
<br />$ 15,000.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />Allowance
<br />$ 7,000.00
<br />$ -
<br />$ -
<br />$ 7,000.00
<br />$ 3,750.00
<br />$ 3,750.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />00#1 Remove Air Barrier at EIFS from Scope
<br />$ -
<br />$ -
<br />$ 2,533.30
<br />$ 2,533.30
<br />$ 2,533.30
<br />$ 2,533.30
<br />ty Drywall
<br />09-9250
<br />9A
<br />00#2 Demo and Patch RI PD Upper Level
<br />$ -
<br />$ -
<br />$ 2,775.00
<br />$ 2,775.00
<br />$ 2,775.00
<br />$ 2,775.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />00#3 RFI#36
<br />$ -
<br />$ -
<br />$ 1,637.00
<br />$ 1,637.00
<br />$ 1,637.00
<br />$ 1,637.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />00#4 PR#17
<br />$ -
<br />$ -
<br />$ 3,959.00
<br />$ 3,959.00
<br />$ 3,959.00
<br />$ 3,959.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />00#5 Allowance usage (remaining $3395)
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />ty Drywall
<br />09-9250
<br />9A
<br />00#6 Allowance usage (remaining $1855)
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />ty Drywall
<br />09-9250
<br />9A
<br />00#7 RFI#132
<br />$ -
<br />$ -
<br />$ 2,221.00
<br />$ 2,221.00
<br />$ 2,221.00
<br />$ 2,221.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />00#8 RFI#108
<br />$ -
<br />$ -
<br />$ 650.00
<br />$ 650.00
<br />$ 650.00
<br />$ 650.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />00#9 Allowance Usage (remaining $900)
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />Mate Tile
<br />09-9300
<br />9B
<br />Tile Labor
<br />$ 19,311.00
<br />$ -
<br />$ -
<br />$ 19,311.00
<br />$ -
<br />$ -
<br />;tate Tile
<br />09-9300
<br />9B
<br />Tile Materials
<br />$ 17,693.00
<br />$ -
<br />$ -
<br />$ 17,693.00
<br />$ 17,693.00
<br />$ 17,693.00
<br />Mate Tile
<br />09-9300
<br />9B
<br />Bond
<br />$ 800.00
<br />$ -
<br />$ -
<br />$ 800.00
<br />$ 800.00
<br />$ 800.00
<br />Mate Tile
<br />09-9300
<br />9B
<br />Area B - Upper (212, 220, 221)
<br />Labor
<br />$ 8,307.00
<br />$ -
<br />$ -
<br />$ 8,307.00
<br />$ 6,400.00
<br />$ 6,400.00
<br />Mate Tile
<br />09-9300
<br />9B
<br />Area B - Lower (150)
<br />Material
<br />$ 300.00
<br />$ -
<br />$ -
<br />$ 300.00
<br />$ -
<br />$ -
<br />;tate Tile
<br />09-9300
<br />9B
<br />00#1 ASI 211TL 8-11 Change
<br />$ -
<br />$ -
<br />$ 7,472.00
<br />$ 7,472.00
<br />$ -
<br />$ -
<br />;tate Tile
<br />09-9300
<br />9B
<br />00#2 Wall Tile Repair (B/C Klein)
<br />$ -
<br />$ -
<br />$ 150.00
<br />$ 150.00
<br />$ -
<br />$ -
<br />itate Tile
<br />09-9300
<br />9B
<br />00#3 Tile in Duty Bay 176
<br />$ -
<br />$ -
<br />$ 495.00
<br />$ 495.00
<br />$ -
<br />$ -
<br />City Acoustics
<br />09-9510
<br />9C
<br />ACT-PoliceM
<br />$ 19,700.00
<br />$ -
<br />$ -
<br />$ 19,700.00
<br />$ 19,700.00
<br />$ 19,700.00
<br />City Acoustics
<br />09-9510
<br />9C
<br />ACT-PoliceL
<br />$ 9,000.00
<br />$ -
<br />$ -
<br />$ 9,000.00
<br />$ 9,000.00
<br />$ 9,000.00
<br />City Acoustics
<br />09-9510
<br />9C
<br />ACT-FireM
<br />$ 3,600.00
<br />$ -
<br />$ -
<br />$ 3,600.00
<br />$ -
<br />$ -
<br />City Acoustics
<br />09-9510
<br />9C
<br />ACT-FireL
<br />$ 2,400.00
<br />$ -
<br />$ -
<br />$ 2,400.00
<br />$ -
<br />$ -
<br />City Acoustics
<br />09-9510
<br />9C
<br />00#1 Change ACT-1 & 2
<br />$ -
<br />$ -
<br />$ 6,829.00
<br />$ 6,829.00
<br />$ 6,829.00
<br />$ 6,829.00
<br />$ 2,550.00
<br />$ 10,114.00
<br />S -
<br />$ 2,400.00
<br />$ 4,000.00
<br />$ 800.00
<br />$ 9,000.00
<br />$ 12,000.00
<br />$ 4,000.00
<br />$ 3,250.00
<br />$ 19,311.00
<br />$ 1,907.00
<br />$ 300.00
<br />$ 7,472.00
<br />$ 150.00
<br />$ 495.00
<br />$ 3,600.00
<br />$ 2,400.00
<br />9.50
<br />74.00
<br />1,831.15
<br />554.90
<br />1,106.10
<br />177.05
<br />643.05
<br />64.73
<br />25.68
<br />2,523.75
<br />640.00
<br />2,826.25
<br />250.00
<br />(305.00
<br />115.50
<br />(7.54
<br />(99.60
<br />52.35
<br />373.10
<br />590.50
<br />1,468.50
<br />331.40
<br />129.75
<br />65.50
<br />250.00
<br />480.00
<br />800.00
<br />160.00
<br />400.00
<br />1,800.00
<br />2,400.00
<br />800.00
<br />750.00
<br />187.50
<br />126.67
<br />138.75
<br />81.85
<br />197.95
<br />$ 111.05
<br />$ 32.50
<br />$ 884.65
<br />$ 40.00
<br />$ 320.00
<br />$ 985.00
<br />$ 450.00
<br />$ 341.45
<br />
|