Laserfiche WebLink
nadee Creek <br />07-7900 <br />7D <br />00#1 PR#2R Caulk Patching <br />$ - <br />$ - <br />$ 190.00 <br />$ 190.00 <br />$ 190.00 <br />$ 190.00 <br />nadee Creek <br />07-7900 <br />7D <br />00#2 RFI#12 <br />$ - <br />$ - <br />$ 1,480.00 <br />$ 1,480.00 <br />$ 1,480.00 <br />$ 1,480.00 <br />:entral Door <br />08-8200 <br />8A <br />Hardware Material <br />$ 36,623.00 <br />$ - <br />$ - <br />$ 36,623.00 <br />$ 25,706.61 <br />$ 10,916.39 <br />$ 36,623.00 <br />:entral Door <br />08-8200 <br />8A <br />HM Door Material <br />$ 11,098.00 <br />$ - <br />$ - <br />$ 11,098.00 <br />$ 7,109.02 <br />$ 3,988.98 <br />$ 11,098.00 <br />:entral Door <br />08-8200 <br />8A <br />HM Frame Material <br />$ 22,122.00 <br />$ - <br />$ - <br />$ 22,122.00 <br />$ 22,122.00 <br />$ 22,122.00 <br />:entral Door <br />08-8200 <br />8A <br />Specialty Material <br />$ 3,541.00 <br />$ - <br />$ - <br />$ 3,541.00 <br />$ 3,541.00 <br />$ 3,541.00 <br />:entral Door <br />08-8200 <br />8A <br />WD Door Material <br />$ 12,861.00 <br />$ - <br />$ - <br />$ 12,861.00 <br />$ 12,861.00 <br />$ 12,861.00 <br />:entral Door <br />08-8200 <br />8A <br />00#1 <br />$ - <br />$ - <br />$ 1,294.50 <br />$ 1,294.50 <br />$ 1,294.50 <br />$ 1,294.50 <br />:entral Door <br />08-8200 <br />8A <br />00#2 RFI#109 <br />$ - <br />$ - <br />$ 513.58 <br />$ 513.58 <br />$ 513.58 <br />$ 513.58 <br />Ford Doors <br />08-8361 <br />8B <br />OH Doors -Material <br />$ 50,475.00 <br />$ - <br />$ - <br />$ 50,475.00 <br />$ 50,475.00 <br />$ 50,475.00 <br />Ford Doors <br />08-8361 <br />8B <br />OH Doors -Labor <br />$ 12,800.00 <br />$ - <br />$ - <br />$ 12,800.00 <br />$ 12,800.00 <br />$ 12,800.00 <br />Ford Doors <br />08-8361 <br />8B <br />High Speed Doors -Material <br />$ 56,525.00 <br />$ - <br />$ - <br />$ 56,525.00 <br />$ 56,525.00 <br />$ 56,525.00 <br />Ford Doors <br />08-8361 <br />8B <br />High Speed Doors -Labor <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />Ford Doors <br />08-8361 <br />8B <br />00#1 High Speed Door VE Option #1 <br />$ - <br />$ - <br />$ (6,100.00) <br />$ (6,100.00) <br />$ (6,100.00) <br />$ (6,100.00 <br />Ford Doors <br />08-8361 <br />8B <br />00#2 Powder Coat Color for High Speed Doors <br />$ - <br />$ - <br />$ 2,310.00 <br />$ 2,310.00 <br />$ 2,310.00 <br />$ 2,310.00 <br />Ford Doors <br />08-8361 <br />8B <br />00#3 Credit Ground Loop at 173A <br />$ - <br />$ - <br />$ (150.70) <br />$ (150.70) <br />$ - <br />$ (150.70) <br />$ (150.70 <br />Ford Doors <br />08-8361 <br />8B <br />00#4 Creditfor single phase OH Door Operator <br />$ - <br />$ - <br />$ (1,992.00) <br />$ (1,992.00) <br />$ - <br />$ (1,992.00) <br />$ (1,992.00 <br />Ford Doors <br />08-8361 <br />8B <br />00#5 RFI#140 Ext access control <br />$ - <br />$ - <br />$ 1,047.00 <br />$ 1,047.00 <br />$ - <br />$ 1,047.00 <br />$ 1,047.00 <br />:land Glass <br />08-8800 <br />8C <br />Aluminum, Glass and Glazing-PD Material <br />$ 7,462.00 <br />$ - <br />$ - <br />$ 7,462.00 <br />$ 7,405.00 <br />$ 57.00 <br />$ 7,462.00 <br />:land Glass <br />08-8800 <br />8C <br />Aluminum, Glass and Glazing-PD Labor/GC's <br />$ 11,810.00 <br />$ - <br />$ - <br />$ 11,810.00 <br />$ 10,920.00 <br />$ 890.00 <br />$ 11,810.00 <br />:land Glass <br />08-8800 <br />8C <br />Aluminum, Glass and Glazing -Fire Material <br />$ 31,920.00 <br />$ - <br />$ - <br />$ 31,920.00 <br />$ 22,255.00 <br />$ 7,115.00 <br />$ 29,370.00 <br />:land Glass <br />08-8800 <br />8C <br />Aluminum, Glass and Glazing -Fire Labor/GC's <br />$ 16,742.00 <br />$ - <br />$ - <br />$ 16,742.00 <br />$ 6,628.00 <br />$ 6,628.00 <br />:land Glass <br />08-8800 <br />8C <br />00#1-PR#01 <br />$ - <br />$ - <br />$ 2,595.00 <br />$ 2,595.00 <br />$ 2,595.00 <br />$ 2,595.00 <br />:land Glass <br />08-8800 <br />8C <br />00#2 RFI#117 <br />$ - <br />$ - <br />$ 1,310.00 <br />$ 1,310.00 <br />$ 1,310.00 <br />$ 1,310.00 <br />ty Drywall <br />09-9250 <br />9A <br />Mobilization <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />ty Drywall <br />09-9250 <br />9A <br />Metal Framing <br />Material <br />$ 12,000.00 <br />$ - <br />$ - <br />$ 12,000.00 <br />$ 9,600.00 <br />$ 9,600.00 <br />ty Drywall <br />09-9250 <br />9A <br />Drywall <br />Material <br />$ 20,000.00 <br />$ - <br />$ - <br />$ 20,000.00 <br />$ 16,000.00 <br />$ 16,000.00 <br />ty Drywall <br />09-9250 <br />9A <br />Taping <br />Material <br />$ 4,000.00 <br />$ - <br />$ - <br />$ 4,000.00 <br />$ 3,200.00 <br />$ 3,200.00 <br />ty Drywall <br />09-9250 <br />9A <br />EIFS <br />Material <br />$ 8,000.00 <br />$ - <br />$ - <br />$ 8,000.00 <br />$ 8,000.00 <br />$ 8,000.00 <br />ty Drywall <br />09-9250 <br />9A <br />Metal Framing <br />Labor <br />$ 45,000.00 <br />$ - <br />$ - <br />$ 45,000.00 <br />$ 36,000.00 <br />$ 36,000.00 <br />ty Drywall <br />09-9250 <br />9A <br />Drywall <br />Labor <br />$ 60,000.00 <br />$ - <br />$ - <br />$ 60,000.00 <br />$ 48,000.00 <br />$ 48,000.00 <br />ty Drywall <br />09-9250 <br />9A <br />Taping <br />Labor <br />$ 20,000.00 <br />$ - <br />$ - <br />$ 20,000.00 <br />$ 16,000.00 <br />$ 16,000.00 <br />ty Drywall <br />09-9250 <br />9A <br />EIFS <br />Labor <br />$ 15,000.00 <br />$ - <br />$ - <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />ty Drywall <br />09-9250 <br />9A <br />Allowance <br />$ 7,000.00 <br />$ - <br />$ - <br />$ 7,000.00 <br />$ 3,750.00 <br />$ 3,750.00 <br />ty Drywall <br />09-9250 <br />9A <br />00#1 Remove Air Barrier at EIFS from Scope <br />$ - <br />$ - <br />$ 2,533.30 <br />$ 2,533.30 <br />$ 2,533.30 <br />$ 2,533.30 <br />ty Drywall <br />09-9250 <br />9A <br />00#2 Demo and Patch RI PD Upper Level <br />$ - <br />$ - <br />$ 2,775.00 <br />$ 2,775.00 <br />$ 2,775.00 <br />$ 2,775.00 <br />ty Drywall <br />09-9250 <br />9A <br />00#3 RFI#36 <br />$ - <br />$ - <br />$ 1,637.00 <br />$ 1,637.00 <br />$ 1,637.00 <br />$ 1,637.00 <br />ty Drywall <br />09-9250 <br />9A <br />00#4 PR#17 <br />$ - <br />$ - <br />$ 3,959.00 <br />$ 3,959.00 <br />$ 3,959.00 <br />$ 3,959.00 <br />ty Drywall <br />09-9250 <br />9A <br />00#5 Allowance usage (remaining $3395) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />ty Drywall <br />09-9250 <br />9A <br />00#6 Allowance usage (remaining $1855) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />ty Drywall <br />09-9250 <br />9A <br />00#7 RFI#132 <br />$ - <br />$ - <br />$ 2,221.00 <br />$ 2,221.00 <br />$ 2,221.00 <br />$ 2,221.00 <br />ty Drywall <br />09-9250 <br />9A <br />00#8 RFI#108 <br />$ - <br />$ - <br />$ 650.00 <br />$ 650.00 <br />$ 650.00 <br />$ 650.00 <br />ty Drywall <br />09-9250 <br />9A <br />00#9 Allowance Usage (remaining $900) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />Mate Tile <br />09-9300 <br />9B <br />Tile Labor <br />$ 19,311.00 <br />$ - <br />$ - <br />$ 19,311.00 <br />$ - <br />$ - <br />;tate Tile <br />09-9300 <br />9B <br />Tile Materials <br />$ 17,693.00 <br />$ - <br />$ - <br />$ 17,693.00 <br />$ 17,693.00 <br />$ 17,693.00 <br />Mate Tile <br />09-9300 <br />9B <br />Bond <br />$ 800.00 <br />$ - <br />$ - <br />$ 800.00 <br />$ 800.00 <br />$ 800.00 <br />Mate Tile <br />09-9300 <br />9B <br />Area B - Upper (212, 220, 221) <br />Labor <br />$ 8,307.00 <br />$ - <br />$ - <br />$ 8,307.00 <br />$ 6,400.00 <br />$ 6,400.00 <br />Mate Tile <br />09-9300 <br />9B <br />Area B - Lower (150) <br />Material <br />$ 300.00 <br />$ - <br />$ - <br />$ 300.00 <br />$ - <br />$ - <br />;tate Tile <br />09-9300 <br />9B <br />00#1 ASI 211TL 8-11 Change <br />$ - <br />$ - <br />$ 7,472.00 <br />$ 7,472.00 <br />$ - <br />$ - <br />;tate Tile <br />09-9300 <br />9B <br />00#2 Wall Tile Repair (B/C Klein) <br />$ - <br />$ - <br />$ 150.00 <br />$ 150.00 <br />$ - <br />$ - <br />itate Tile <br />09-9300 <br />9B <br />00#3 Tile in Duty Bay 176 <br />$ - <br />$ - <br />$ 495.00 <br />$ 495.00 <br />$ - <br />$ - <br />City Acoustics <br />09-9510 <br />9C <br />ACT-PoliceM <br />$ 19,700.00 <br />$ - <br />$ - <br />$ 19,700.00 <br />$ 19,700.00 <br />$ 19,700.00 <br />City Acoustics <br />09-9510 <br />9C <br />ACT-PoliceL <br />$ 9,000.00 <br />$ - <br />$ - <br />$ 9,000.00 <br />$ 9,000.00 <br />$ 9,000.00 <br />City Acoustics <br />09-9510 <br />9C <br />ACT-FireM <br />$ 3,600.00 <br />$ - <br />$ - <br />$ 3,600.00 <br />$ - <br />$ - <br />City Acoustics <br />09-9510 <br />9C <br />ACT-FireL <br />$ 2,400.00 <br />$ - <br />$ - <br />$ 2,400.00 <br />$ - <br />$ - <br />City Acoustics <br />09-9510 <br />9C <br />00#1 Change ACT-1 & 2 <br />$ - <br />$ - <br />$ 6,829.00 <br />$ 6,829.00 <br />$ 6,829.00 <br />$ 6,829.00 <br />$ 2,550.00 <br />$ 10,114.00 <br />S - <br />$ 2,400.00 <br />$ 4,000.00 <br />$ 800.00 <br />$ 9,000.00 <br />$ 12,000.00 <br />$ 4,000.00 <br />$ 3,250.00 <br />$ 19,311.00 <br />$ 1,907.00 <br />$ 300.00 <br />$ 7,472.00 <br />$ 150.00 <br />$ 495.00 <br />$ 3,600.00 <br />$ 2,400.00 <br />9.50 <br />74.00 <br />1,831.15 <br />554.90 <br />1,106.10 <br />177.05 <br />643.05 <br />64.73 <br />25.68 <br />2,523.75 <br />640.00 <br />2,826.25 <br />250.00 <br />(305.00 <br />115.50 <br />(7.54 <br />(99.60 <br />52.35 <br />373.10 <br />590.50 <br />1,468.50 <br />331.40 <br />129.75 <br />65.50 <br />250.00 <br />480.00 <br />800.00 <br />160.00 <br />400.00 <br />1,800.00 <br />2,400.00 <br />800.00 <br />750.00 <br />187.50 <br />126.67 <br />138.75 <br />81.85 <br />197.95 <br />$ 111.05 <br />$ 32.50 <br />$ 884.65 <br />$ 40.00 <br />$ 320.00 <br />$ 985.00 <br />$ 450.00 <br />$ 341.45 <br />