Laserfiche WebLink
0.705 <br />Terra Terra Project NureSt ton <br />Elk Favan#3 <br />City oStab <br />GON ST RUG410N <br />of Ok Riva <br />CONTINUATION SHEET AIA DOCUMENT G703 <br />ALA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 6 <br />Contractor's signed certification is attached. APPLICATION DATE: 7/31/21 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 7/31/21 <br />Use Column I on Contracts where variable retainage for line items may apply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />FROM PREVIOUS <br />THIS PERIOD <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />TO FINISH <br />(IF VARIABLE <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOTIN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Preconstruction <br />01-0002 <br />Preconstruction <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />$ - <br />$ 10,000.00 <br />100.009' <br />$ - <br />$ 500.00 <br />Bonds & Insurance <br />01-0100 <br />Bonds & Insurance <br />$ 76,368.00 <br />$ 76,368.00 <br />$ 60,015.00 <br />$ - <br />$ 60,015.00 <br />78.59% <br />$ 16,353.00 <br />$ 3,000.75 <br />Permit <br />01-0110 <br />Permit <br />$ 400.00 <br />$ 1,033.46 <br />$ 1,433.46 <br />$ 1,433.46 <br />$ - <br />$ 1,433.46 <br />100.009/ <br />$ - <br />$ 71.67 <br />CM General Requirements <br />01-0120 <br />CM General Requirements <br />$ 724,061.00 <br />$ - <br />$ (17,923.99) <br />$ 706,137.01 <br />$ 143,996.14 <br />$ 49,125.52 <br />$ 193,121.66 <br />27.35% <br />$ 513,015.35 <br />$ 9,656.08 <br />CM Contingency <br />01-0130 <br />CM Contingency <br />$ 233,000.00 <br />$ (23,913.94) <br />$ 209,086.06 <br />$ - <br />$ - <br />$ - <br />0.009' <br />$ 209,086.06 <br />$ - <br />CM Fee <br />01-0150 <br />CM Fee <br />$ 101,734.00 <br />$ 101,734.00 <br />$ 15,533.61 <br />$ 6,572.00 <br />$ 22,105.61 <br />21.73% <br />$ 79,628.39 <br />$ 1,105.28 <br />Thomsen Construction Services <br />03-3300 <br />3A <br />Footings/Pads <br />$ 22,000.00 <br />$ - <br />$ - <br />$ 22,000.00 <br />$ 22,000.00 <br />$ 22,000.00 <br />100.0091 <br />$ - <br />$ 1,100.00 <br />Thomsen Construction Services <br />03-3300 <br />3A <br />Footings Labor <br />$ 32,000.00 <br />$ - <br />$ - <br />$ 32,000.00 <br />$ 32,000.00 <br />$ 32,000.00 <br />100.009' <br />$ - <br />$ 1,600.00 <br />Thomsen Construction Services <br />03-3300 <br />3A <br />Walls Material <br />$ 14,000.00 <br />$ - <br />$ - <br />$ 14,000.00 <br />$ 14,000.00 <br />$ 14,000.00 <br />100.009/6 <br />$ - <br />$ 700.00 <br />Thomsen Construction Services <br />03-3300 <br />3A <br />Walls Labor <br />$ 60,000.00 <br />$ - <br />$ - <br />$ 60,000.00 <br />$ 60,000.00 <br />$ 60,000.00 <br />100.009' <br />$ - <br />$ 3,000.00 <br />Thomsen Construction Services <br />03-3300 <br />3A <br />Slab on Grade Material <br />$ 73,000.00 <br />$ - <br />$ - <br />$ 73,000.00 <br />$ - <br />$ 7,500.00 <br />$ 7,500.00 <br />10.27% <br />$ 65,500.00 <br />$ 375.00 <br />Thomsen Construction Services <br />03-33DO <br />3A <br />Slab on Grade Labor <br />$ 112,900.00 <br />$ - <br />$ - <br />$ 112,900.00 <br />$ - <br />$ 12,500.00 <br />$ 12,500.00 <br />11.07% <br />$ 100,400.00 <br />$ 625.00 <br />Thomsen Construction Services <br />03-3300 <br />3A <br />Reinforcing Material <br />$ 35,000.00 <br />$ - <br />$ - <br />$ 35,000.00 <br />$ 30,150.00 <br />$ 4,850.00 <br />$ 35,000.00 <br />100.009' <br />$ - <br />$ 1,750.00 <br />Thomsen Construction Services <br />03-3300 <br />3A <br />CO#1 PR44 Stepped Footings <br />$ - <br />$ - <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />100.009' <br />$ - <br />$ 125.00 <br />Thomsen Construction Services <br />03-33DO <br />3A <br />CO#2 B/C to Dryden <br />$ - <br />$ - <br />$ 500.00 <br />$ 500.00 <br />$ 500.00 <br />$ 500.00 <br />100.009/ <br />$ - <br />$ 25.00 <br />Thomsen Construction Services <br />03-3300 <br />3A <br />CO#3 RFI#33 Stepped footings for 8" Storm <br />$ - <br />$ - <br />$ 600.00 <br />$ 600.00 <br />$ - <br />$ 600.00 <br />$ 600.00 <br />100.009/ <br />$ - <br />$ 30.00 <br />Thomsen Construction Services <br />03-3300 <br />3A <br />CO#4 RFI#37 Extended Foundation @ 188 <br />$ - <br />$ - <br />$ 550.00 <br />$ 550.00 <br />$ - <br />$ 550.00 <br />$ 550.00 <br />100.009/ <br />$ - <br />$ 27.50 <br />Concrete Treatments <br />03-3350 <br />3B & 9E <br />Polished Concrete and Resinous Flooring <br />$ 73,189.00 <br />$ - <br />$ - <br />$ 73,189.00 <br />$ - <br />$ - <br />0.009' <br />$ 73,189.00 <br />$ - <br />Ultra Concrete <br />03-3390 <br />32D <br />Bond <br />$ 2,400.00 <br />$ - <br />$ - <br />$ 2,400.00 <br />$ - <br />$ - <br />0.009/ <br />$ 2,400.00 <br />$ - <br />Ultra Concrete <br />03-3390 <br />32D <br />Curb <br />$ 37,000.00 <br />$ - <br />$ - <br />$ 37,000.00 <br />$ - <br />$ - <br />0.009' <br />$ 37,000.00 <br />$ - <br />Ultra Concrete <br />03-3390 <br />32D <br />Bollards/Flag Pole Footings <br />$ 9,800.00 <br />$ - <br />$ - <br />$ 9,800.00 <br />$ - <br />$ - <br />0.009/. <br />$ 9,800.00 <br />$ - <br />Ultra Concrete <br />03-3390 <br />32D <br />Sidewalks/Paving <br />$ 170,800.00 <br />$ - <br />$ - <br />$ 170,800.00 <br />$ - <br />$ - <br />0.009/ <br />$ 170,800.00 <br />$ - <br />Ultra Concrete <br />03-3390 <br />32D <br />CO#1 PR#7 Water Service <br />$ - <br />$ - <br />$ (994.93) <br />$ (994.93) <br />$ - <br />$ - <br />0.009' <br />$ (994.93) <br />$ - <br />Camco Construction <br />04-4200 <br />4A <br />Masonry -Bond <br />$ 15,000.00 <br />$ - <br />$ - <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />100.009' <br />$ - <br />$ 750.00 <br />Camco Construction <br />04-4200 <br />4A <br />Masonry-Rebar <br />$ 40,000.00 <br />$ - <br />$ - <br />$ 40,000.00 <br />$ 40,000.00 <br />$ 40,000.00 <br />100.009/ <br />$ - <br />$ 2,000.00 <br />Camco Construction <br />04-4200 <br />4A <br />Masonry-Misc Masonry Materials <br />$ 115,000.00 <br />$ - <br />$ - <br />$ 115,000.00 <br />$ 75,000.00 <br />$ 15,000.00 <br />$ 90,000.00 <br />78.26% <br />$ 25,000.00 <br />$ 4,500.00 <br />Camco Construction <br />04-4200 <br />4A <br />Masonry -Insulation <br />$ 20,000.00 <br />$ - <br />$ - <br />$ 20,000.00 <br />$ 20,000.00 <br />$ 20,000.00 <br />100.009' <br />$ - <br />$ 1,000.00 <br />Camco Construction <br />04-4200 <br />4A <br />Masonry -Grout Material <br />$ 42,000.00 <br />$ - <br />$ - <br />$ 42,000.00 <br />$ 4,200.00 <br />$ 6,400.00 <br />$ 10,600.00 <br />25.249' <br />$ 31,400.00 <br />$ 530.00 <br />Camco Construction <br />04-4200 <br />4A <br />Masonry -Grout Labor <br />$ 50,000.00 <br />$ - <br />$ - <br />$ 50,000.00 <br />$ 5,000.00 <br />$ 7,200.00 <br />$ 12,200.00 <br />24.4091 <br />$ 37,800.00 <br />$ 610.00 <br />Camco Construction <br />04-4200 <br />4A <br />Masonry -Stone Material <br />$ 60,000.00 <br />$ - <br />$ - <br />$ 60,000.00 <br />$ - <br />$ - <br />0.009' <br />$ 60,000.00 <br />$ - <br />Camco Construction <br />04-4200 <br />4A <br />Masonry -Stone Labor <br />$ 42,000.00 <br />$ - <br />$ - <br />$ 42,000.00 <br />$ - <br />$ - <br />0.009/6 <br />$ 42,000.00 <br />$ - <br />Camoo Construction <br />04-4200 <br />4A <br />Masonry-Facebrick Material <br />$ 75,000.00 <br />$ - <br />$ - <br />$ 75,000.00 <br />$ - <br />$ - <br />0.009/ <br />$ 75,000.00 <br />$ - <br />Camco Construction <br />04-4200 <br />4A <br />Masonry-Facebrick Labor <br />$ 230,000.00 <br />$ - <br />$ - <br />$ 230,000.00 <br />$ - <br />$ - <br />0.009' <br />$ 230,000.00 <br />$ - <br />Camco Construction <br />04-4200 <br />4A <br />Masonry -Precast Material <br />$ 35,000.00 <br />$ - <br />$ - <br />$ 35,000.00 <br />$ - <br />$ - <br />0.009/ <br />$ 35,000.00 <br />$ - <br />Camco Construction <br />04-4200 <br />4A <br />Masonry -Precast Labor <br />$ 40,000.00 <br />$ - <br />$ - <br />$ 40,000.00 <br />$ - <br />$ - <br />0.009' <br />$ 40,000.00 <br />$ - <br />Camco Construction <br />04-4200 <br />4A <br />Masonry-CMU Material <br />$ 100,000.00 <br />$ - <br />$ - <br />$ 100,000.00 <br />$ 35,000.00 <br />$ 30,000.00 <br />$ 65,000.00 <br />65.00% <br />$ 35,000.00 <br />$ 3,250.00 <br />Camco Construction <br />04-4200 <br />4A <br />Masonry-CMU Labor <br />$ 251,000.00 <br />$ - <br />$ - <br />$ 251,000.00 <br />$ 25,000.00 <br />$ 75,000.00 <br />$ 100,000.00 <br />39.84% <br />$ 151,000.00 <br />$ 5,000.00 <br />Distinctive Iron <br />05-5120 <br />5A <br />Structural Steel Material-Startup/Shop Drawings <br />$ 38,200.00 <br />$ - <br />$ - <br />$ 38,200.00 <br />$ 38,200.00 <br />$ 38,200.00 <br />100.009/ <br />$ - <br />$ 1,910.00 <br />Distinctive Iron <br />05-5120 <br />5A <br />Structural Steel -Material <br />$ 75,000.00 <br />$ - <br />$ - <br />$ 75,000.00 <br />$ - <br />$ 75,000.00 <br />$ 75,000.00 <br />100.0091 <br />$ - <br />$ 3,750.00 <br />Distinctive Iron <br />05-5120 <br />5A <br />Steel Material-Joist/Deck <br />$ 115,553.75 <br />$ - <br />$ 87,196.25 <br />$ 202,750.00 <br />$ - <br />$ - <br />0.009' <br />$ 202,750.00 <br />$ - <br />Page 1 / 7 <br />