Laserfiche WebLink
w Look <br />31-1000 <br />31A <br />Sand Import <br />$ 2,332.00 <br />$ - <br />$ - <br />$ 2,332.00 <br />$ 2,332.00 <br />$ 2,332.00 <br />100.00"/ <br />$ - <br />$ 116.60 <br />w Look <br />31-1000 <br />31A <br />Soil Correction <br />$ 17,885.00 <br />$ - <br />$ - <br />$ 17,885.00 <br />$ 17,885.00 <br />$ 17,885.00 <br />100.00% <br />$ - <br />$ 894.25 <br />w Look <br />31-1000 <br />31A <br />Structure Exc <br />$ 39,240.00 <br />$ - <br />$ - <br />$ 39,240.00 <br />$ 27,638.00 <br />$ 11,602.00 <br />$ 39,240.00 <br />100.00% <br />$ - <br />$ 1,962.00 <br />w Look <br />31-1000 <br />31A <br />Topsoil <br />$ 14,300.00 <br />$ - <br />$ - <br />$ 14,300.00 <br />$ - <br />$ 7,150.00 <br />$ 7,150.00 <br />50.00% <br />$ 7,150.00 <br />$ 357.50 <br />w Look <br />31-1000 <br />31A <br />Fine Grading <br />$ 11,943.00 <br />$ - <br />$ - <br />$ 11,943.00 <br />$ - <br />$ 5,972.00 <br />$ 5,972.00 <br />50.00% <br />$ 5,971.00 <br />$ 298.60 <br />w Look <br />31-1000 <br />31A <br />00#1 PR#2R Grade Prep <br />$ - <br />$ - <br />$ 290.79 <br />$ 290.79 <br />$ 290.79 <br />$ 290.79 <br />100.00% <br />$ - <br />$ 14.54 <br />w Look <br />31-1000 <br />31A <br />00#2 PR#03 <br />$ - <br />$ - <br />$ 477.79 <br />$ 477.79 <br />$ 477.79 <br />$ 477.79 <br />100.00% <br />$ - <br />$ 23.89 <br />w Look <br />31-1000 <br />31A <br />00#3 ASI 1 <br />$ - <br />$ - <br />$ 11,031.51 <br />$ 11,031.51 <br />$ 6,619.00 <br />$ 4,412.51 <br />$ 11,031.51 <br />100.00% <br />$ - <br />$ 551.58 <br />w Look <br />31-1000 <br />31A <br />00#4 T&M Class 5 Entrances <br />$ - <br />$ - <br />$ 1,345.00 <br />$ 1,345.00 <br />$ 1,345.00 <br />$ 1,345.00 <br />100.00% <br />$ - <br />$ 67.25 <br />w Look <br />31-1000 <br />31A <br />00#5 Wellfield Excavation <br />$ - <br />$ - <br />$ 1,082.79 <br />$ 1,082.79 <br />$ 1,082.79 <br />$ 1,082.79 <br />100.001. <br />$ - <br />$ 54.14 <br />w Look <br />31-1000 <br />31A <br />00#6 Frost Removal <br />$ - <br />$ - <br />$ 1,552.00 <br />$ 1,552.00 <br />$ 1,552.00 <br />$ 1,552.00 <br />100.00% <br />$ - <br />$ 77.60 <br />w Look <br />31-1000 <br />31A <br />00#7 PR#20 <br />$ - <br />$ - <br />$ 3,454.65 <br />$ 3,454.65 <br />$ 3,454.65 <br />$ 3,454.65 <br />100.00% <br />$ - <br />$ 172.73 <br />w Look <br />31-1000 <br />31A <br />00#8 Gate Arm Panel <br />$ - <br />$ - <br />$ 3,861.00 <br />$ 3,861.00 <br />$ - <br />$ 3,861.00 <br />$ 3,861.00 <br />100.00% <br />$ - <br />$ 193.05 <br />ler Fence <br />32-4000 <br />32A <br />Fencing <br />$ 120,375.00 <br />$ - <br />$ (22,247.00) <br />$ 98,128.00 <br />$ - <br />$ 98,128.00 <br />$ 98,128.00 <br />100.00% <br />$ - <br />$ 4,906.40 <br />tumn Ridge <br />32-3291 <br />32B <br />Landscaping <br />$ 42,980.00 <br />$ - <br />$ - <br />$ 42,980.00 <br />$ - <br />$ - <br />0.00% <br />$ 42,980.00 <br />$ - <br />uminous Roadways <br />32-1216 <br />32C <br />Asphalt <br />$ 144,740.00 <br />$ - <br />$ - <br />$ 144,740.00 <br />$ 22,000.00 <br />$ 22,000.00 <br />15.20% <br />$ 122,740.00 <br />$ 1,100.00 <br />uminous Roadways <br />32-1216 <br />32C <br />00#1 ASI 1 <br />$ - <br />$ - <br />$ 3,110.00 <br />$ 3,110.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,110.00 <br />$ - <br />uminous Roadways <br />32-1216 <br />32C <br />00#2 PR#20 <br />$ - <br />$ - <br />$ 7,650.00 <br />$ 7,650.00 <br />$ - <br />$ - <br />0.00% <br />$ 7,650.00 <br />$ - <br />uminous Roadways <br />32-1216 <br />32C <br />00#3 Added temp Striping <br />$ - <br />$ - <br />$ 750.00 <br />$ 750.00 <br />$ - <br />$ - <br />0.00% <br />$ 750.00 <br />$ - <br />Paul Utilities <br />31-3123 <br />33A <br />Water Main Labor <br />$ 20,000.00 <br />$ - <br />$ - <br />$ 20,000.00 <br />$ 20,000.00 <br />$ 20,000.00 <br />100.000/. <br />$ - <br />$ 1,000.00 <br />Paul Utilities <br />31-3123 <br />33A <br />Water Main Material <br />$ 10,000.00 <br />$ - <br />$ - <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />100.00"/ <br />$ - <br />$ 500.00 <br />Paul Utilities <br />31-3123 <br />33A <br />Storm Sewer Labor <br />$ 29,000.00 <br />$ - <br />$ - <br />$ 29,000.00 <br />$ 18,000.00 <br />$ 11,000.00 <br />$ 29,000.00 <br />100.00"/ <br />$ - <br />$ 1,450.00 <br />Paul Utilities <br />31-3123 <br />33A <br />Storm Sewer Material <br />$ 25,000.00 <br />$ - <br />$ - <br />$ 25,000.00 <br />$ 19,000.00 <br />$ 6,000.00 <br />$ 25,000.00 <br />100.00% <br />$ - <br />$ 1,250.00 <br />Paul Utilities <br />31-3123 <br />33A <br />00#1 PR#10 <br />$ - <br />$ - <br />$ 2,800.00 <br />$ 2,800.00 <br />$ 2,800.00 <br />$ 2,800.00 <br />100.00% <br />$ - <br />$ 140.00 <br />Paul Utilities <br />31-3123 <br />33A <br />00#2 PR#13 Storm Sewer <br />$ - <br />$ - <br />$ 5,560.00 <br />$ 5,560.00 <br />$ 5,560.00 <br />$ 5,560.00 <br />100.00"/ <br />$ - <br />$ 278.00 <br />Paul Utilities <br />31-3123 <br />33A <br />00#3 Addtojet outforzen storm line <br />$ - <br />$ - <br />$ 1,650.00 <br />$ 1,650.00 <br />$ - <br />$ 1,650.00 <br />$ 1,650.00 <br />100.00% <br />$ - <br />$ 82.50 <br />Paul Utilities <br />31-3123 <br />33A <br />00#416" WM in Lieu of 8" <br />$ - <br />$ - <br />$ 3,450.00 <br />$ 3,450.00 <br />$ - <br />$ 3,450.00 <br />$ 3,450.00 <br />100.001. <br />$ - <br />$ 172.50 <br />Paul Utilities <br />31-3123 <br />33A <br />00#5 PR#25 Storm Sewer <br />$ - <br />$ - <br />$ 5,175.00 <br />$ 5,175.00 <br />$ - <br />$ 5,175.00 <br />$ 5,175.00 <br />100.00% <br />$ - <br />$ 258.75 <br />GRAND TOTALS <br />$ 6,290,219.00 <br />$ - <br />$ 0.00 <br />$ 6,290,219.00 <br />$ 4,669,396.69 <br />$ 471,950.51 <br />$ - <br />$ 5,141,347.20 <br />81.74% <br />$ 1,148,871.80 <br />$ 257,067.36 <br />