My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1j ERMUSR 08-10-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2021
>
08-10-2021- SPECIAL
>
6.1j ERMUSR 08-10-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2021 2:59:56 PM
Creation date
8/9/2021 2:59:56 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/10/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
______________________________________________________________________________ <br />Page 1 of 1 <br />UTILITIES COMMISSION MEETING <br />TO: <br />ERMU Commission <br />FROM: <br />Dave Ninow – Water Superintendent <br />MEETING DATE: <br />August 10, 2021 <br />AGENDA ITEM NUMBER: <br />6.1j <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />•Delivered 15 new water meters. <br />•Sealed the water meter, installed an encoder receiver transmitter, and took curb stop <br />ties from 14 water services. <br />•Completed 15 BACTI/Total Chlorine Residual Samples <br />o All confirmed negative for Coliform Bacteria. <br />o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH <br />•Completed 21 routine fluoride samples <br />o All samples met MDH standards. <br />o Submitted MDH Fluoride Report <br />•Submitted Discharge Monitoring Report (DMR) for the Water Treatment Plants to the <br />Minnesota Pollution Control Agency (MPCA). <br />•Submitted DMR for the Diesel Generation Plant to the MPCA. <br />•There was a water main leak reported on Simonet Drive on Friday, July 16. Burshville <br />Construction excavated and replaced the water main fitting that was leaking. Staff <br />believes this leak was likely caused by wear and tear. <br />•Staff has started testing residential backflow prevention devices. The newly created <br />appointment process is going well. <br />•Bids for water main relocation work for the Highway 169 Redefine project are due by <br />August 19. <br />•Water department staff have done numerous scheduled water main shutdowns for <br />connection of new water mains in the Elk Ridge Estates and Reserve at Woodland Hills <br />developments. <br />•The annual leak detection survey has been completed. The water operators will <br />continue to fix fire hydrants that were identified as needing repair during the flushing <br />and the leak detection survey. <br />ATTACHMENTS: <br />•July 2021 Pumping by Well <br />107
The URL can be used to link to this page
Your browser does not support the video tag.