My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.0 ERMUSR 12-12-2006
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2006
>
12-12-2006
>
3.0 ERMUSR 12-12-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2021 3:04:52 PM
Creation date
8/5/2021 3:04:51 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/12/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br /> Regular meeting of the Elk River Municipal Utilities Commission <br /> November 14,2006 <br /> The$143,000 difference from item 5.2 would allocate half($70,000)in rate reduction for <br /> these customers. Staff will complete the changes and present it at the December meeting for <br /> approval. <br /> 5.5 Review&Consider Data Center Service Agreement <br /> The Electric Service Agreement for the United Health Group Data Center was reviewed. <br /> Staff recommends approving this agreement so Elk River Municipal Utilities can move <br /> forward with our phase of the project,which includes engineering for the new electric feeder, <br /> engineering for the additional substation,and material procurement. United Health Group will <br /> sign the agreement on November 21,2006. <br /> Motion by John Dietz to allow Jerry Takle and Bryan Adams execute the contract with United <br /> Health Group once the agreements are signed on November 21 S`. James Tralle seconded the <br /> motion. Motion carried 3-0. <br /> 6.1 Review & Consider Bid Tabulation for 69kv Transformer <br /> On October 26,2006,bids were received for a new 69kv transformer. This transformer <br /> will be incorporated into the new Waco Substation that will serve among other entities,the <br /> new United Health Group Data Center. Staff recommends award be given to the lowest <br /> responsive bidder,Virginia Transformer Corp. <br /> Motion by James Tralle to award the 69kv transformer to Virginia Transformer,the lowest <br /> responsive bidder at the price not to exceed. John Dietz seconded the motion. Motion carried <br /> 3-0. <br /> 6.2 Review& Consider Bid Tabulation for Twin Lakes Watermain <br /> At the August 22,2006,Elk River Municipal Utilities Commission meeting, <br /> authorization was given to prepare plan specifications and secure bids for two watermain <br /> projects along Twin Lakes Road. <br /> The first is from Trott Brook South to 175th Avenue booster station which will loop the <br /> watermain for the Johnson Street water tower. Bids were received on October 31,2006. <br /> The second project was to construct a watermain from Water Treatment Plant#7 to County <br /> Road 12. This project would reduce system pressures so both Wells#7 and#8 could be <br /> operated together. Part way through the engineering phase,it became obvious this would be <br /> an expensive project and well above our initial estimates. This project will eventually be <br /> required,but in the short term we can adjust some control valves at Water Treatment Plant#7 <br /> to reduce pressure when the pumps start at Wells#7 and#8. When we construct the Well in <br /> Twin Lakes Estates,this watermain will be constructed. Bid tabulations were reviewed for the <br /> Trott Brook South to 175th Avenue watermain project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.