Laserfiche WebLink
laumadee Creek 1 07-7900 1 7D JCO#2 RFI#12 I I $ - I $ - 1 $ 1,480.00 1 $ 1,480.00 1 $ - 1 $ 1,480.00 1 1 $ 1,480.00 <br />lid -Central Door <br />08-6200 <br />SA <br />Hardware Material <br />$ 36,623.00 <br />$ - <br />$ - <br />$ 36,623.00 <br />$ 25,706.61 <br />$ 25,706.61 <br />lid -Central Door <br />08-6200 <br />SA <br />HIM Door Material <br />$ 11,098.00 <br />$ - <br />$ - <br />$ 11,098.00 <br />$ 7,109.02 <br />$ 7,109.02 <br />lid -Central Door <br />08-6200 <br />SA <br />HIM Frame Material <br />$ 22,122.00 <br />$ - <br />$ - <br />$ 22,122.00 <br />$ 22,122.00 <br />$ 22,122.00 <br />lid -Central Door <br />08-6200 <br />SA <br />Specialty Material <br />$ 3,541.00 <br />$ - <br />$ - <br />$ 3,541.00 <br />$ - <br />$ 3,541.00 <br />$ 3,541.00 <br />lid -Central Door <br />08-6200 <br />SA <br />WD Door Material <br />$ 12,861.00 <br />$ - <br />$ - <br />$ 12,861.00 <br />$ 12,861.00 <br />$ 12,861.00 <br />lid -Central Door <br />08-6200 <br />SA <br />COtf1 <br />$ - <br />$ - <br />$ 1,294.50 <br />$ 1,294.50 <br />$ 1,294.50 <br />$ 1,294.50 <br />lid -Central Door <br />08-6200 <br />SA <br />CO#2 RFI#109 <br />$ - <br />$ - <br />$ 513.56 <br />$ 513.56 <br />$ 513.56 <br />$ 513.56 <br />'awford Doors <br />08-6361 <br />SB <br />OH Doors -Material <br />$ 50,475.00 <br />$ - <br />$ - <br />$ 50,475.00 <br />$ 50,475.00 <br />$ 50,475.00 <br />'awford Doors <br />08-6361 <br />SB <br />OH Doors -Labor <br />$ 12,800.00 <br />$ - <br />$ - <br />$ 12,800.00 <br />$ 12,800.00 <br />$ 12,800.00 <br />'awford Doors <br />08-6361 <br />SB <br />High Speed Doors -Material <br />$ 56,525.00 <br />$ - <br />$ - <br />$ 56,525.00 <br />$ 56,525.00 <br />$ 56,525.00 <br />'awford Doors <br />08-6361 <br />SB <br />High Speed Doors -Labor <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />'awford Doors <br />08-6361 <br />SB <br />COtf1 High Speed Door VE Option #1 <br />$ - <br />$ - <br />$ (6,100.00) <br />$ (6,100.00) <br />$ (6,100.00) <br />$ (6,100.00) <br />'awford Doors <br />08-6361 <br />SB <br />CO#2 Powder Coat Color for High Speed Doors <br />$ - <br />$ - <br />$ 2,310.00 <br />$ 2,310.00 <br />$ 2,310.00 <br />$ 2,310.00 <br />'awford Doors <br />08-6361 <br />SB <br />CO#3 Credit Ground Loop at 173A <br />$ - <br />$ - <br />$ (150.70) <br />$ (150.70) <br />$ - <br />$ - <br />'awford Doors <br />08-6361 <br />SB <br />CO#4 Credit for single phase OH Door Operator <br />$ - <br />$ - <br />$ (1,992.00) <br />$ (1,992.00) <br />$ - <br />$ - <br />eartland Glass <br />08-8800 <br />SC <br />Aluminum, Glass and Glazing-PD Material <br />$ 7,462.00 <br />$ - <br />$ - <br />$ 7,462.00 <br />$ 6,810.00 <br />$ 595.00 <br />$ 7,405.00 <br />eartland Glass <br />08-8800 <br />SC <br />Aluminum, Glass and Glazing-PD Labor/GC's <br />$ 11,810.00 <br />$ - <br />$ - <br />$ 11,810.00 <br />$ 9,685.00 <br />$ 1,235.00 <br />$ 10,920.00 <br />eartland Glass <br />08-8800 <br />SC <br />Aluminum, Glass and Glazing -Fire Material <br />$ 31,920.00 <br />$ - <br />$ - <br />$ 31,920.00 <br />$ 20,265.00 <br />$ 1,990.00 <br />$ 22,255.00 <br />eartland Glass <br />08-8800 <br />SC <br />Aluminum, Glass and Glazing -Fire Labor/GC's <br />$ 16,742.00 <br />$ - <br />$ - <br />$ 16,742.00 <br />$ 5,860.00 <br />$ 766.00 <br />$ 6,628.00 <br />eartland Glass <br />08-8800 <br />SC <br />COtf1 - PR#01 <br />$ - <br />$ - <br />$ 2,595.00 <br />$ 2,595.00 <br />$ 2,595.00 <br />$ 2,595.00 <br />eartland Glass <br />08-8800 <br />SC <br />CO#2 RFI#117 <br />$ - <br />$ - <br />$ 1,310.00 <br />$ 1,310.00 <br />$ 1,310.00 <br />$ 1,310.00 <br />uality Drywall <br />09-9250 <br />9A <br />Mobilization <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />uality Drywall <br />09-9250 <br />9A <br />Metal Framing <br />Material <br />$ 12,000.00 <br />$ - <br />$ - <br />$ 12,000.00 <br />$ 9,600.00 <br />$ 9,600.00 <br />uality Drywall <br />09-9250 <br />9A <br />Drywall <br />Material <br />$ 20,000.00 <br />$ - <br />$ - <br />$ 20,000.00 <br />$ 16,000.00 <br />$ 16,000.00 <br />uality Drywall <br />09-9250 <br />9A <br />Taping <br />Material <br />$ 4,000.00 <br />$ - <br />$ - <br />$ 4,000.00 <br />$ 3,200.00 <br />$ 3,200.00 <br />uality Drywall <br />09-9250 <br />9A <br />EIFS <br />Material <br />$ 8,000.00 <br />$ - <br />$ - <br />$ 8,000.00 <br />$ 8,000.00 <br />$ 8,000.00 <br />uality Drywall <br />09-9250 <br />9A <br />Metal Framing <br />Labor <br />$ 45,000.00 <br />$ - <br />$ - <br />$ 45,000.00 <br />$ 36,000.00 <br />$ 36,000.00 <br />uality Drywall <br />09-9250 <br />9A <br />Drywall <br />Labor <br />$ 60,000.00 <br />$ - <br />$ - <br />$ 60,000.00 <br />$ 48,000.00 <br />$ 48,000.00 <br />uality Drywall <br />09-9250 <br />9A <br />Taping <br />Labor <br />$ 20,000.00 <br />$ - <br />$ - <br />$ 20,000.00 <br />$ 16,000.00 <br />$ 16,000.00 <br />uality Drywall <br />09-9250 <br />9A <br />EIFS <br />Labor <br />$ 15,000.00 <br />$ - <br />$ - <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />uality Drywall <br />09-9250 <br />9A <br />Allowance <br />$ 7,000.00 <br />$ - <br />$ - <br />$ 7,000.00 <br />$ 1,750.00 <br />$ 2,000.00 <br />$ 3,750.00 <br />uality Drywall <br />09-9250 <br />9A <br />CO#I Remove Air Barrier at EIFS from Scope <br />$ - <br />$ - <br />$ 2,533.30 <br />$ 2,533.30 <br />$ 2,533.30 <br />$ 2,533.30 <br />uality Drywall <br />09-9250 <br />9A <br />CO#2 Demo and Patch RI PD Upper Level <br />$ - <br />$ - <br />$ 2,775.00 <br />$ 2,775.00 <br />$ 2,775.00 <br />$ 2,775.00 <br />uality Drywall <br />09-9250 <br />9A <br />CO#3 RFI#36 <br />$ - <br />$ - <br />$ 1,637.00 <br />$ 1,637.00 <br />$ 1,637.00 <br />$ 1,637.00 <br />uality Drywall <br />09-9250 <br />9A <br />CO#4 PR#17 <br />$ - <br />$ - <br />$ 3,959.00 <br />$ 3,959.00 <br />$ 3,959.00 <br />$ 3,959.00 <br />uality Drywall <br />09-9250 <br />9A <br />CO#5 Allowance usage (remaining $3395) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />uality Drywall <br />09-9250 <br />9A <br />CO#6 Allowance usage (remaining $1855) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />uality Drywall <br />09-9250 <br />9A <br />CO#7 RFI#132 <br />$ - <br />$ - <br />$ 2,221.00 <br />$ 2,221.00 <br />$ - <br />$ 2,221.00 <br />$ 2,221.00 <br />uality Drywall <br />09-9250 <br />9A <br />COBS RFI#106 <br />$ - <br />$ - <br />$ 650.00 <br />$ 650.00 <br />$ - <br />$ 650.00 <br />$ 650.00 <br />lid -State Tile <br />09-9300 <br />9B <br />Tile Labor <br />$ 19,311.00 <br />$ - <br />$ - <br />$ 19,311.00 <br />$ - <br />$ - <br />lid -State Tile <br />09-9300 <br />9B <br />Tile Materials <br />$ 17,693.00 <br />$ - <br />$ - <br />$ 17,693.00 <br />$ 17,693.00 <br />$ 17,693.00 <br />lid -State Tile <br />09-9300 <br />9B <br />Bond <br />$ 800.00 <br />$ - <br />$ - <br />$ 800.00 <br />$ 800.00 <br />$ 800.00 <br />lid -State Tile <br />09-9300 <br />9B <br />Area B - Upper (212, 220, 221) <br />Labor <br />$ 8,307.00 <br />$ - <br />$ - <br />$ 8,307.00 <br />$ 6,400.00 <br />$ 6,400.00 <br />lid -State Tile <br />09-9300 <br />9B <br />Area B- Lower (150) <br />Material <br />$ 300.00 <br />$ - <br />$ - <br />$ 300.00 <br />$ - <br />$ - <br />lid -State Tile <br />09-9300 <br />9B <br />COtf1 AS12RTL 8-11 Change <br />$ - <br />$ - <br />$ 7,472.00 <br />$ 7,472.00 <br />$ - <br />$ - <br />lid -State Tile <br />09-9300 <br />9B <br />CO#2 Wall Tile Repair (B/C Klein) <br />$ - <br />$ - <br />$ 150.00 <br />$ 150.00 <br />$ - <br />$ - <br />lid -State Tile <br />09-9300 <br />9B <br />CO#3 Tile in Duty Bay 176 <br />$ - <br />$ - <br />$ 495.00 <br />$ 495.00 <br />$ - <br />$ - <br />min City Acoustics <br />09-9510 <br />9C <br />ACT -Police M <br />$ 19,700.00 <br />$ - <br />$ - <br />$ 19,700.00 <br />$ 16,745.00 <br />$ 2,955.00 <br />$ 19,700.00 <br />min City Acoustics <br />09-9510 <br />9C <br />ACT -Police L <br />$ 9,000.00 <br />$ - <br />$ - <br />$ 9,000.00 <br />$ 7,650.00 <br />$ 1,350.00 <br />$ 9,000.00 <br />min City Acoustics <br />09-9510 <br />9C <br />ACT -Fire M <br />$ 3,600.00 <br />$ - <br />$ - <br />$ 3,600.00 <br />$ - <br />$ - <br />min City Acoustics <br />09-9510 <br />9C <br />ACT -Fire L <br />$ 2,400.00 <br />$ - <br />$ - <br />$ 2,400.00 <br />$ - <br />$ - <br />min City Acoustics <br />09-9510 <br />9C <br />COtf1 Change ACT-1 & 2 <br />$ - <br />$ - <br />$ 6,829.00 <br />$ 6,829.00 <br />$ 6,829.00 <br />$ 6,829.00 <br />razzini Bros. <br />09-9660 <br />9D <br />Flooring-M <br />$ 41,305.00 <br />$ - <br />$ (8,505.00) <br />$ 32,800.00 <br />$ 32,800.00 <br />$ 32,800.00 <br />razzini Bros. <br />09-9660 <br />9D <br />Flooring-L <br />$ 7,660.00 <br />$ - <br />$ - <br />$ 7,660.00 <br />$ 2,600.00 <br />$ 2,600.00 <br />razzini Bros. <br />09-9660 <br />9D <br />Flooring -Mob <br />$ 675.00 <br />$ - <br />$ - <br />$ 675.00 <br />$ 600.00 <br />$ 600.00 <br />100.00%I $ <br />70.19% $ 10,916.39 <br />64.06% $ 3,966.98 <br />100.00% $ - <br />100.00% $ <br />100.00% $ <br />100.00% $ <br />100.00% $ <br />100.00% $ <br />100.00% $ <br />100.00% $ <br />100.00% $ <br />100.00% $ <br />100.00% $ <br />0.00% $ (150.70) <br />0.00% $ (1,992.00) <br />99.24% $ 57.00 <br />92.46% $ 690.00 <br />69.72% $ 9,665.00 <br />39.59% $ 10,114.00 <br />100.00% $ - <br />100.00% 5 - <br />53 <br />#DIV/0!I <br />#DIV/0! <br />77 <br />33 <br />$ 2,400.00 <br />$ 4,000.00 <br />$ 800.00 <br />$ 9,000.00 <br />$ 12,000.00 <br />$ 4,000.00 <br />$ 3,250.00 <br />$ 19,311.00 <br />$ 1,907.00 <br />$ 300.00 <br />$ 7,472.00 <br />$ 150.00 <br />$ 495.00 <br />$ 3,600.00 <br />$ 2,400.00 <br />$ 5,060.00 <br />$ 275.00 <br />$ <br />74.00 <br />1,285.33 <br />355.45 <br />1,106.10 <br />177.05 <br />643.05 <br />64.73 <br />25.66 <br />2,523.75 <br />640.00 <br />2,826.25 <br />250.00 <br />(305.00) <br />115.50 <br />370.25 <br />546.00 <br />1,112.75 <br />331.40 <br />129.75 <br />65.50 <br />250.00 <br />460.00 <br />800.00 <br />160.00 <br />400.00 <br />1,800.00 <br />2,400.00 <br />800.00 <br />750.00 <br />167.50 <br />126.67 <br />136.75 <br />61.65 <br />197.95 <br />$ 111.05 <br />$ 32.50 <br />$ 664.65 <br />$ 40.00 <br />$ 320.00 <br />$ 965.00 <br />$ 450.00 <br />$ 341.45 <br />$ 1,640.00 <br />$ 130.00 <br />$ 30.00 <br />