Laserfiche WebLink
Terra Project Number 20.700 <br />Te <br />rra El k River Publ is Safety Bui Idi ng Expanson <br />� � <br />CCN ST..0 TICN <br />City of Elk River <br />CONTINUATION SHEET A/ADOCUMENT G703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 9 <br />Contractor's signed certification is attached. APPLICATION DATE: 6/30/21 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 6/30/21 <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION / <br />SCHEDULED <br />FROM PREVIOUS <br />THIS PERIOD <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />TO FINISH <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />COST <br />TRANSFER <br />(D +E) <br />(NOT IN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Preconstruction <br />01-0002 <br />Preconstruction <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />$ - <br />$ 10,000.00 <br />100.00% <br />$ - <br />$ 500.00 <br />Bonds <br />01-0110 <br />Bonds & Insurance <br />$ 79,528.00 <br />$ 79,528.00 <br />$ 79,528.00 <br />$ 79,528.00 <br />100.00% <br />$ - <br />$ 3,976.40 <br />Permits <br />01-0120 <br />Building Permit/SAC/WAC/SWPPP <br />$ 127,156.00 <br />$ 127,156.00 <br />$ 400.00 <br />$ 400.00 <br />0.31% <br />$ 126,756.00 <br />$ 20.00 <br />CM General Requirements <br />CM General Requirements <br />$ 789,795.50 <br />$ 5,507.50 <br />$ 795,303.00 <br />$ 535,476.02 <br />$ 61,309.93 <br />$ 596,785.95 <br />75.04% <br />$ 198,517.05 <br />$ 29,839.30 <br />CM Contingency <br />01-0150 <br />CM Contingency <br />$ 238,379.00 <br />$ (192,461.72) <br />$ 45,917.28 <br />$ - <br />$ - <br />0.00% <br />$ 45,917.28 <br />$ - <br />CM Fee <br />CM Fee <br />$ 92,372.00 <br />$ 92,372.00 <br />$ 64,156.66 <br />$ 4,414.00 <br />$ 68,570.66 <br />74.23% <br />$ 23,801.34 <br />$ 3,428.53 <br />Envirobate <br />02-2070 <br />2A <br />Selective Demolition <br />$ 132,619.00 <br />$ - <br />$ 132,619.00 <br />$ 112,826.16 <br />$ 112,826.16 <br />85.08% <br />$ 19,792.84 <br />$ 5,641.31 <br />Envirobate <br />02-2070 <br />2A <br />COtf1 PRtf2R Add demo <br />$ - <br />$ 2,856.00 <br />$ 2,856.00 <br />$ 2,856.00 <br />$ 2,856.00 <br />100.00% <br />$ - <br />$ 142.80 <br />Envirobate <br />02-2070 <br />2A <br />COtf2 RFItf5 <br />$ - <br />$ 910.00 <br />$ 910.00 <br />$ 910.00 <br />$ 910.00 <br />100.00% <br />$ - <br />$ 45.50 <br />Envirobate <br />02-2070 <br />2A <br />COtf3 RFItf17 <br />$ - <br />$ 1,164.00 <br />$ 1,164.00 <br />$ 1,164.00 <br />$ 1,164.00 <br />100.00% <br />$ - <br />$ 58.20 <br />Envirobate <br />02-2070 <br />2A <br />COtf4 RFItf21 <br />$ - <br />$ (1,212.00) <br />$ (1,212.00) <br />$ (1,212.00) <br />$ (1,212.00) <br />100.00% <br />$ - <br />$ (60.60) <br />Envirobate <br />02-2070 <br />2A <br />COtf5 RFItf36 <br />$ - <br />$ 1,919.00 <br />$ 1,919.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,919.00 <br />$ - <br />Envirobate <br />02-2070 <br />2A <br />COtf6 RFItf78 Added Brick Demo <br />$ - <br />$ 8,677.00 <br />$ 8,677.00 <br />$ - <br />$ - <br />0.00% <br />$ 8,677.00 <br />$ - <br />Envirobate <br />02-2070 <br />2A <br />COtf7 Back Charge (Fix Damaged Air and Storm Sewer) <br />$ - <br />$ (297.26) <br />$ (297.26) <br />$ - <br />$ - <br />0.00% <br />$ (297.26) <br />$ - <br />Envirobate <br />02-2070 <br />2A <br />COtf8 Added Demo at Brick Ledge <br />$ - <br />$ 182.00 <br />$ 182.00 <br />$ - <br />$ - <br />0.00% <br />$ 182.00 <br />$ - <br />Envirobate <br />02-2070 <br />2A <br />COtf9 RFItf21 <br />$ - <br />$ (596.00) <br />$ (596.00) <br />$ - <br />$ - <br />0.00% <br />$ (596.00) <br />$ - <br />Ebert <br />03-3300 <br />3A <br />General Conditions <br />$ 22,866.00 <br />$ - <br />$ - <br />$ 22,866.00 <br />$ 19,873.81 <br />$ 1,302.00 <br />$ 21,175.81 <br />92.61% <br />$ 1,690.19 <br />$ 1,058.79 <br />Ebert <br />03-3300 <br />3A <br />Bonds & Insurance <br />$ 6,200.00 <br />$ - <br />$ - <br />$ 6,200.00 <br />$ 6,200.00 <br />$ 6,200.00 <br />100.00% <br />$ - <br />$ 310.00 <br />Ebert <br />03-3300 <br />3A <br />Rebar & Accessories <br />Material <br />$ 50,400.00 <br />$ - <br />$ - <br />$ 50,400.00 <br />$ 50,400.00 <br />$ 50,400.00 <br />100.00% <br />$ - <br />$ 2,520.00 <br />Ebert <br />03-3300 <br />3A <br />Area A Found <br />Labor <br />$ 35,550.00 <br />$ - <br />$ - <br />$ 35,550.00 <br />$ 31,614.00 <br />$ 31,614.00 <br />88.93% <br />$ 3,936.00 <br />$ 1,580.70 <br />Ebert <br />03-3300 <br />3A <br />Area A Found <br />Material <br />$ 31,521.00 <br />$ - <br />$ - <br />$ 31,521.00 <br />$ 28,033.00 <br />$ 28,033.00 <br />88.93% <br />$ 3,488.00 <br />$ 1,401.65 <br />Ebert <br />03-3300 <br />3A <br />Area ASOG <br />Labor <br />$ 27,900.00 <br />$ - <br />$ - <br />$ 27,900.00 <br />$ 19,390.50 <br />$ 19,390.50 <br />69.50% <br />$ 8,509.50 <br />$ 969.53 <br />Ebert <br />03-3300 <br />3A <br />Area A SOG <br />Material <br />$ 40,577.00 <br />$ - <br />$ - <br />$ 40,577.00 <br />$ 30,077.00 <br />$ 30,077.00 <br />74.12% <br />$ 10,500.00 <br />$ 1,503.85 <br />Ebert <br />03-3300 <br />3A <br />Area ATop Slabs <br />Labor <br />$ 4,800.00 <br />$ - <br />$ - <br />$ 4,800.00 <br />$ - <br />$ - <br />0.00% <br />$ 4,800.00 <br />$ - <br />Ebert <br />03-3300 <br />3A <br />Area ATop Slabs <br />Material <br />$ 3,814.00 <br />$ - <br />$ - <br />$ 3,814.00 <br />$ 1,113.00 <br />$ 1,113.00 <br />29.18% <br />$ 2,701.00 <br />$ 55.65 <br />Ebert <br />03-3300 <br />3A <br />Area C Found <br />Labor <br />$ 33,900.00 <br />$ - <br />$ - <br />$ 33,900.00 <br />$ 33,900.00 <br />$ 33,900.00 <br />100.00% <br />$ - <br />$ 1,695.00 <br />Ebert <br />03-3300 <br />3A <br />Area C Found <br />Material <br />$ 26,241.00 <br />$ - <br />$ - <br />$ 26,241.00 <br />$ 26,241.00 <br />$ 26,241.00 <br />100.00% <br />$ - <br />$ 1,312.05 <br />Ebert <br />03-3300 <br />3A <br />Area C SOG <br />Labor <br />$ 41,400.00 <br />$ - <br />$ - <br />$ 41,400.00 <br />$ 41,400.00 <br />$ 41,400.00 <br />100.00% <br />$ - <br />$ 2,070.00 <br />Ebert <br />03-3300 <br />3A <br />Area C SOG <br />Material <br />$ 71,919.00 <br />$ - <br />$ - <br />$ 71,919.00 <br />$ 71,919.00 <br />$ 71,919.00 <br />100.00% <br />$ - <br />$ 3,595.95 <br />Ebert <br />03-3300 <br />3A <br />Exterior Concrete <br />Labor <br />$ 8,700.00 <br />$ - <br />$ - <br />$ 8,700.00 <br />$ 4,050.00 <br />$ 2,250.00 <br />$ 6,300.00 <br />72.41% <br />$ 2,400.00 <br />$ 315.00 <br />Ebert <br />03-3300 <br />3A <br />Exterior Concrete <br />Material <br />$ 7,412.00 <br />$ - <br />$ - <br />$ 7,412.00 <br />$ 3,960.00 <br />$ 1,199.00 <br />$ 5,159.00 <br />69.60% <br />$ 2,253.00 <br />$ 257.95 <br />Ebert <br />03-3300 <br />32D <br />General Conditions <br />$ 5,200.00 <br />$ - <br />$ - <br />$ 5,200.00 <br />$ 3,295.20 <br />$ 1,116.00 <br />$ 4,411.20 <br />84.83% <br />$ 788.80 <br />$ 220.56 <br />Ebert <br />03-3300 <br />32D <br />Bond & Insurance <br />$ 1,181.00 <br />$ - <br />$ - <br />$ 1,181.00 <br />$ 1,181.00 <br />$ 1,181.00 <br />100.00% <br />$ - <br />$ 59.05 <br />Ebert <br />03-3300 <br />32D <br />Rebar & Accessories <br />$ 2,885.00 <br />$ - <br />$ - <br />$ 2,885.00 <br />$ 2,885.00 <br />$ 2,885.00 <br />100.00% <br />$ - <br />$ 144.25 <br />Ebert <br />03-3300 <br />32D <br />Curb &Gutter <br />$ 38,784.00 <br />$ - <br />$ - <br />$ 38,784.00 <br />$ 8,512.00 <br />$ 30,272.00 <br />$ 38,784.00 <br />100.00% <br />$ - <br />$ 1,939.20 <br />Ebert <br />03-3300 <br />32D <br />Site Concrete <br />Labor <br />$ 13,100.00 <br />$ - <br />$ - <br />$ 13,100.00 <br />$ 5,400.00 <br />$ 2,900.00 <br />$ 8,300.00 <br />63.36% <br />$ 4,800.00 <br />$ 415.00 <br />Ebert <br />03-3300 <br />32D <br />Site Concrete <br />Material <br />$ 10,219.00 <br />$ - <br />$ - <br />$ 10,219.00 <br />$ 2,410.00 <br />$ 5,102.00 <br />$ 7,512.00 <br />73.51% <br />$ 2,707.00 <br />$ 375.60 <br />Ebert <br />03-3300 <br />32D <br />Existing Walk Rep <br />Labor <br />$ 4,800.00 <br />$ - <br />$ - <br />$ 4,800.00 <br />$ - <br />$ - <br />0.00% <br />$ 4,800.00 <br />$ - <br />Ebert <br />03-3300 <br />32D <br />Existing Walk Rep <br />Material <br />$ 2,531.00 <br />$ - <br />$ - <br />$ 2,531.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,531'00 <br />$ - <br />Ebert <br />03-3300 <br />32D <br />COtf1 Eliminate Insulation at foundation <br />$ - <br />$ - <br />$ (1,143.06) <br />$ (1,143.06) <br />$ (1143.06) <br />$ (1,143.06) <br />100.0N <br />$ - <br />$ (57.15) <br />Ebert <br />03-3300 <br />32D <br />COtf2 PRtf2RThickened Footing <br />$ - <br />$ - <br />$ 2,037.71 <br />$ 2,037.71 <br />$ 2:037.71 <br />$ 2:037'71 <br />100.00% <br />$ - <br />$ 101.89 <br />Ebert <br />03-3300 <br />32D <br />COtf3 RFItf21 <br />$ - <br />$ - <br />$ 2,240.08 <br />$ 2,240.08 <br />$ 2,240.08 <br />$ 2,240.08 <br />100.00% <br />$ - <br />$ 112.00 <br />Ebert <br />03-3300 <br />32D <br />COtf4 PRtf03 <br />$ - <br />$ - <br />$ 20.09 <br />$ 20.09 <br />$ 20.09 <br />$ 20.09 <br />100.00% <br />$ - <br />$ 1.00 <br />Ebert <br />03-3300 <br />32D <br />COtf5 ASI1 <br />$ - <br />$ - <br />$ 3,585.12 <br />$ 3,585.12 <br />$ 3,362.84 <br />$ 3,362.84 <br />93.80% <br />$ 222.28 <br />$ 168.14 <br />