Laserfiche WebLink
TerraProjecta Numb2U7U5 <br />METerra Elk iva Fire Station to <br />CONSTRUCTION <br />City of Elk River <br />CONTINUATION SHEET AIA DOCUMENT G703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 5 <br />Contractor's signed certification is attached. APPLICATION DATE: 6/30/21 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 6/30/21 <br />Use Column I on Contracts where variable retainage for line items may apply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORKCOMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION / <br />SCHEDULED <br />FROM PREVIOUS <br />THIS PERIOD <br />PRESENTLY <br />COMPLETED <br />(G +C) <br />TO FINISH <br />(IF VARIABLE <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Dryden Excavating <br />31-1000 <br />31A <br />Mobilization, Bond, SWPP Permit <br />$ 7,000.00 <br />$ - <br />$ - <br />$ 7,000.00 <br />$ 3,500.00 <br />$ 1,750.00 <br />$ 5,250.00 <br />75.00% <br />$ 1,750.00 <br />$ 262.50 <br />Dryden Excavating <br />31-1000 <br />31A <br />Bituminous Saw -Cutting Labor <br />$ 2,105.00 <br />$ - <br />$ - <br />$ 2,105.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,105.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Bituminous Removal Labor <br />$ 3,640.00 <br />$ - <br />$ - <br />$ 3,640.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,640.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Concrete Saw -Cutting Labor <br />$ 160.00 <br />$ - <br />$ - <br />$ 160.00 <br />$ - <br />$ - <br />0.00% <br />$ 160.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Concrete Removal Labor <br />$ 3,236.00 <br />$ - <br />$ - <br />$ 3,236.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,236.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Tree Protection Labor <br />$ 75.00 <br />$ - <br />$ - <br />$ 75.00 <br />$ 75.00 <br />$ 75.00 <br />100.00% <br />$ - <br />$ 3.75 <br />Dryden Excavating <br />31-1000 <br />31A <br />Clearing&Grubbing Labor <br />$ 2,100.00 <br />$ - <br />$ - <br />$ 2,100.00 <br />$ 2,100.00 <br />$ 2,100.00 <br />100.00% <br />$ - <br />$ 105.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Topsoil Stripping & Emb. Labor <br />$ 1,386.00 <br />$ - <br />$ - <br />$ 1,386.00 <br />$ 1,386.00 <br />$ 1,386.00 <br />100.00% <br />$ - <br />$ 69.30 <br />Dryden Excavating <br />31-1000 <br />31A <br />Export Excess Topsoil Labor <br />$ 14,055.00 <br />$ - <br />$ - <br />$ 14,055.00 <br />$ 14,055.00 <br />$ 14,055.00 <br />100.00% <br />$ - <br />$ 702.75 <br />Dryden Excavating <br />31-1000 <br />31A <br />Site Grading Labor <br />$ 56,076.01 <br />$ - <br />$ - <br />$ 56,076.01 <br />$ 32,250.00 <br />$ 3,489.00 <br />$ 35,739.00 <br />63.73% <br />$ 20,337.01 <br />$ 1,786.95 <br />Dryden Excavating <br />31-1000 <br />31A <br />Site Grading Material <br />$ 14,040.00 <br />$ - <br />$ - <br />$ 14,040.00 <br />$ - <br />$ 14,040.00 <br />$ 14,040.00 <br />100.00% <br />$ - <br />$ 702.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Exc. & Back -fill Foundations <br />$ 25:378.00 <br />$ - <br />$ - <br />$ 25:378.00 <br />$ 7,613.40 <br />$ 17,764.60 <br />$ 25,378.00 <br />100.00% <br />$ - <br />$ 1,268.90 <br />Dryden Excavating <br />31-1000 <br />31A <br />Building Sand Cushion Labor <br />$ 3,298.00 <br />$ - <br />$ - <br />$ 3,298.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,298.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Building Sand Cushion Material <br />$ 629.00 <br />$ - <br />$ - <br />$ 629.00 <br />$ - <br />$ - <br />0.00% <br />$ 629.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Class 5 Labor <br />$ 9,014.00 <br />$ - <br />$ - <br />$ 9,014.00 <br />$ - <br />$ - <br />0.00% <br />$ 9,014.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Class 5 Material <br />$ 7,854.00 <br />$ - <br />$ - <br />$ 7,854.00 <br />$ - <br />$ - <br />0.00% <br />$ 7,854.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Subgrade Prep Labor <br />$ 8,595.00 <br />$ - <br />$ - <br />$ 8,595.00 <br />$ 4,297.50 <br />$ 4,297.50 <br />50.00% <br />$ 4,297.50 <br />$ 214.66 <br />Dryden Excavating <br />31-1000 <br />31A <br />Dewatering Labor <br />$ 2,625.00 <br />$ - <br />$ - <br />$ 2,625.00 <br />$ - <br />$ 2,625.00 <br />$ 2,625.00 <br />100.00% <br />$ - <br />$ 131.25 <br />Dryden Excavating <br />31-1000 <br />31A <br />SWPP Permit <br />$ 525.00 <br />$ - <br />$ - <br />$ 525.00 <br />$ - <br />$ 525.00 <br />$ 525.00 <br />100.00% <br />$ - <br />$ 26.25 <br />Dryden Excavating <br />31-1000 <br />31A <br />Silt Fence Labor <br />$ 2,240.00 <br />$ - <br />$ - <br />$ 2,240.00 <br />$ 2,240.00 <br />$ 2,240.00 <br />100.00% <br />$ - <br />$ 112.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Silt Fence Material <br />$ 700.00 <br />$ - <br />$ - <br />$ 700.00 <br />$ 700.00 <br />$ 700.00 <br />100.00% <br />$ - <br />$ 35.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Inlet Protection Labor <br />$ 2,502.00 <br />$ - <br />$ - <br />$ 2,502.00 <br />$ 1,501.20 <br />$ 1,501.20 <br />60.00% <br />$ 1,000.80 <br />$ 75.06 <br />Dryden Excavating <br />31-1000 <br />31A <br />Construction Entrance Labor <br />$ 2,000.00 <br />$ - <br />$ - <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 2,000.00 <br />100.00% <br />$ - <br />$ 100.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Construction Entrance Materials <br />$ 100.00 <br />$ - <br />$ - <br />$ 100.00 <br />$ 100.00 <br />$ 100.00 <br />100.00% <br />$ - <br />$ 5.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Hydro Seed <br />$ 1,166.00 <br />$ - <br />$ - <br />$ 1,166.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,166.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Flex Mat Labor <br />$ 700.00 <br />$ - <br />$ - <br />$ 700.00 <br />$ - <br />$ - <br />0.00% <br />$ 700.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Flex Mat Material <br />$ 3,266.00 <br />$ - <br />$ - <br />$ 3,266.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,266.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />33A <br />Mobilization, Bond, Permits <br />$ 20504.16 <br />$ - <br />$ - <br />$ 20504.16 <br />$ 10,252.08 <br />$ 5,126.04 <br />$ 15,378.12 <br />75.00% <br />$ 5,126.04 <br />$ 766.91 <br />Dryden Excavating <br />31-1000 <br />33A <br />Water Utilities Labor <br />$ 25:719.19 <br />$ - <br />$ - <br />$ 25:719.19 <br />$ 21,617.92 <br />$ 3,901.27 <br />$ 25,719.19 <br />100.00% <br />$ - <br />$ 1,285.96 <br />Dryden Excavating <br />31-1000 <br />33A <br />Water Utilities Material <br />$ 52,306.23 <br />$ - <br />$ - <br />$ 52,306.23 <br />$ 52,306.23 <br />$ 52,306.23 <br />100.00% <br />$ - <br />$ 2,615.31 <br />Dryden Excavating <br />31-1000 <br />33A <br />Wet Tap Labor <br />$ 239.22 <br />$ - <br />$ - <br />$ 239.22 <br />$ 239.22 <br />$ 239.22 <br />100.00% <br />$ - <br />$ 11.96 <br />Dryden Excavating <br />31-1000 <br />33A <br />Wet Tap Material <br />$ 2,500.00 <br />$ - <br />$ - <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />100.00% <br />$ - <br />$ 125.00 <br />Dryden Excavating <br />31-1000 <br />33A <br />Sanitary Piping Labor <br />$ 9,667.77 <br />$ - <br />$ - <br />$ 9,667.77 <br />$ 9,622.35 <br />$ 9,622.35 <br />99.53% <br />$ 45.42 <br />$ 461.12 <br />Dryden Excavating <br />31-1000 <br />33A <br />Sanitary Piping Material <br />$ 9,622.35 <br />$ - <br />$ - <br />$ 9,622.35 <br />$ 9,425.00 <br />$ 9,425.00 <br />97.95% <br />$ 197.35 <br />$ 471.25 <br />Dryden Excavating <br />31-1000 <br />33A <br />Sanitary Manholes Labor <br />$ 1,808.00 <br />$ - <br />$ - <br />$ 1,808.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,808.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />33A <br />Sanitary Manholes Material <br />$ 9,425.00 <br />$ - <br />$ - <br />$ 9,425.00 <br />$ 6,091.59 <br />$ 6,091.59 <br />64.63% <br />$ 3,333.41 <br />$ 304.56 <br />Dryden Excavating <br />31-1000 <br />33A <br />Manhole Castings Labor <br />$ 691.20 <br />$ - <br />$ - <br />$ 691.20 <br />$ - <br />$ - <br />0.00% <br />$ 691.20 <br />$ - <br />Dryden Excavating <br />31-1000 <br />33A <br />Manhole Castings Material <br />$ 1,140.00 <br />$ - <br />$ - <br />$ 1,140.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,140.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />33A <br />Storm - PVC Piping Labor <br />$ 8,024.15 <br />$ - <br />$ - <br />$ 8,024.15 <br />$ 7,073.34 <br />$ 7,073.34 <br />66.15% <br />$ 950.61 <br />$ 353.67 <br />Dryden Excavating <br />31-1000 <br />33A <br />Storm - PVC Piping Material <br />$ 10,992.34 <br />$ - <br />$ - <br />$ 10,992.34 <br />$ 10,992.34 <br />$ 10,992.34 <br />100.00% <br />$ - <br />$ 549.62 <br />Dryden Excavating <br />31-1000 <br />33A <br />Storm -Concrete Piping/Manholes Labor <br />$ 10,155.38 <br />$ - <br />$ - <br />$ 10,155.38 <br />$ 8,294.43 <br />$ 1,116.57 <br />$ 9,411.00 <br />92.67% <br />$ 744.36 <br />$ 470.55 <br />Dryden Excavating <br />31-1000 <br />33A <br />Storm -Concrete Piping/Manholes Material <br />$ 27,063.60 <br />$ - <br />$ - <br />$ 27,063.60 <br />$ 27,063.60 <br />$ 27,063.60 <br />100.00% <br />$ - <br />$ 1,353.18 <br />Dryden Excavating <br />31-1000 <br />33A <br />Storm - Castings/Grates Labor <br />$ 3,152.40 <br />$ - <br />$ - <br />$ 3,152.40 <br />$ - <br />$ - <br />0.00% <br />$ 3,152.40 <br />$ - <br />Dryden Excavating <br />31-1000 <br />33A <br />Storm - Castings/Grates Material <br />$ 52,068.00 <br />$ - <br />$ - <br />$ 52,068.00 <br />$ - <br />$ - <br />0.00% <br />$ 52,068.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#1 Additional Construction Entrances <br />$ - <br />$ - <br />$ 4,246.61 <br />$ 4,246.61 <br />$ 4,246.61 <br />$ 4,246.61 <br />100.00% <br />$ - <br />$ 212.33 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#2 PR#7 Water Service <br />$ - <br />$ - <br />$ (1,517.19) <br />$ (1,517.19) <br />$ (1,517.19) <br />$ (1,517.19) <br />100.00% <br />$ - <br />$ (75.66) <br />Page 6/7 <br />