Laserfiche WebLink
TerraProjecta Numb2U7U5 <br />METerra Elk iva Fire Station to <br />CONSTRUCTION <br />City of Elk River <br />CONTINUATION SHEET AIA DOCUMENT G703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 5 <br />Contractor's signed certification is attached. APPLICATION DATE: 6/30/21 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 6/30/21 <br />Use Column I on Contracts where variable retainage for line items may apply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORKCOMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION / <br />SCHEDULED <br />FROM PREVIOUS <br />THIS PERIOD <br />PRESENTLY <br />COMPLETED <br />(G +C) <br />TO FINISH <br />(IF VARIABLE <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Niemela Design and Construction <br />09-9250 <br />9A <br />FRP- Material <br />$ 606.00 <br />$ - <br />$ - <br />$ 606.00 <br />$ - <br />$ - <br />0.00% <br />$ 606.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Framing- Labor <br />$ 33,795.00 <br />$ - <br />$ - <br />$ 33,795.00 <br />$ - <br />$ - <br />0.00% <br />$ 33,795.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Insulation - Labor <br />$ 6,500.00 <br />$ - <br />$ - <br />$ 6,500.00 <br />$ - <br />$ - <br />0.00% <br />$ 6,500.00 <br />$ - <br />NiemelaDesignandConstruction <br />09-9250 <br />9A <br />Drywall - Labor <br />$ 22,810.00 <br />$ - <br />$ - <br />$ 22,810.00 <br />$ - <br />$ - <br />0.00% <br />$ 22,810.00 <br />$ - <br />NiemelaDesignandConstruction <br />09-9250 <br />9A <br />Taping/Finishing - Labor <br />$ 23,301.00 <br />$ - <br />$ - <br />$ 23,301.00 <br />$ - <br />$ - <br />0.00% <br />$ 23,301.00 <br />$ - <br />NiemelaDesignandConstruction <br />09-9250 <br />9A <br />Sealants/Acoustical - Labor <br />$ 3,000.00 <br />$ - <br />$ - <br />$ 3,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,000.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />FRP - Labor <br />$ 630.00 <br />$ - <br />$ - <br />$ 630.00 <br />$ - <br />$ - <br />0.00% <br />$ 630.00 <br />$ - <br />NiemelaDesignandConstruction <br />09-9250 <br />9A <br />Equipment - Lift <br />$ 7,500.00 <br />$ - <br />$ - <br />$ 7,500.00 <br />$ - <br />$ - <br />0.00% <br />$ 7,500.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Mobilization <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 5,000.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Bonding <br />$ 2,915.00 <br />$ - <br />$ - <br />$ 2,915.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,915.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Allowance (Terra Directed) <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 5,000.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Allowance -Access Panels <br />$ 2,000.00 <br />$ - <br />$ - <br />$ 2,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,000.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />CO#1 PR#2R Clerestory Head Detail <br />$ - <br />$ - <br />$ 4,963.35 <br />$ 4,963.35 <br />$ - <br />$ - <br />0.00% <br />$ 4,963.35 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />CO#2 PR#3R <br />$ - <br />$ - <br />$ (357.00) <br />$ (357.00) <br />$ - <br />$ - <br />0.00% <br />$ (357.00) <br />$ - <br />Tim's Construction Group <br />09-9300 <br />9B <br />Labor <br />$ 23,450.00 <br />$ - <br />$ - <br />$ 23,450.00 <br />$ - <br />$ - <br />0.00% <br />$ 23,450.00 <br />$ - <br />Tim's Construction Group <br />09-9300 <br />9B <br />Tile Material <br />$ 26,365.00 <br />$ - <br />$ - <br />$ 26,365.00 <br />$ - <br />$ - <br />0.00% <br />$ 26,365.00 <br />$ - <br />Sonus Interiors <br />09-9510 <br />9C <br />ACT-1 Material <br />$ 9,850.00 <br />$ - <br />$ - <br />$ 9,850.00 <br />$ - <br />$ - <br />0.00% <br />$ 9,850.00 <br />$ - <br />Sonus Interiors <br />09-9510 <br />9C <br />ACT-1 Labor <br />$ 6,936.00 <br />$ - <br />$ - <br />$ 6,936.00 <br />$ - <br />$ - <br />0.00% <br />$ 6,936.00 <br />$ - <br />Sonus Interiors <br />09-9510 <br />9C <br />ACP Material <br />$ 61,659.00 <br />$ - <br />$ - <br />$ 61,659.00 <br />$ - <br />$ - <br />0.00% <br />$ 61,659.00 <br />$ - <br />Sonus Interiors <br />09-9510 <br />9C <br />ACP Labor <br />$ 9,674.00 <br />$ - <br />$ - <br />$ 9,674.00 <br />$ - <br />$ - <br />0.00% <br />$ 9,674.00 <br />$ - <br />Sonus Interiors <br />09-9510 <br />9C <br />Bond <br />$ 1,231.00 <br />$ - <br />$ - <br />$ 1,231.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,231.00 <br />$ - <br />Sonus Interiors <br />09-9510 <br />9C <br />CO#1 PR#3R <br />$ - <br />$ - <br />$ 1,130.00 <br />$ 1,130.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,130.00 <br />$ - <br />Centennial Flooring <br />09-9660 <br />9D <br />Carpet & Resilient Flooring <br />$ 19,500.00 <br />$ - <br />$ - <br />$ 19,500.00 <br />$ - <br />$ - <br />0.00% <br />$ 19,500.00 <br />$ - <br />Steinbrecher Painting <br />09-9910 <br />9F <br />Painting& Wallcovering <br />$ 76,200.00 <br />$ - <br />$ - <br />$ 76,200.00 <br />$ - <br />$ - <br />0.00% <br />$ 76,200.00 <br />$ - <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />Mechanical <br />$ 922,000.00 <br />$ - <br />$ - <br />$ 922,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 922,000.00 <br />$ - <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#1 PR#3R <br />$ - <br />$ - <br />$ 3,532.00 <br />$ 3,532.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,532.00 <br />$ - <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#2 Added expansion tankfor snow melt <br />$ - <br />$ - <br />$ 2,504.00 <br />$ 2,504.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,504.00 <br />$ - <br />Summit Fire <br />15-1533 <br />21A <br />Labor <br />$ 18,200.00 <br />$ - <br />$ - <br />$ 18,200.00 <br />$ - <br />$ - <br />0.00% <br />$ 18,200.00 <br />$ - <br />Summit Fire <br />15-1533 <br />21A <br />Material <br />$ 22,800.00 <br />$ - <br />$ - <br />$ 22,800.00 <br />$ - <br />$ - <br />0.00% <br />$ 22,800.00 <br />$ - <br />Summit Fire <br />15-1533 <br />21A <br />Design <br />$ 3,200.00 <br />$ - <br />$ - <br />$ 3,200.00 <br />$ 3,200.00 <br />$ 3,200.00 <br />100.00% <br />$ - <br />$ 160.00 <br />Summit Fire <br />15-1533 <br />21A <br />Fabrication <br />$ 2,600.00 <br />$ - <br />$ - <br />$ 2,600.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,600.00 <br />$ - <br />Summit Fire <br />15-1533 <br />21A <br />Bond <br />$ 800.00 <br />$ - <br />$ - <br />$ 800.00 <br />$ 800.00 <br />$ 800.00 <br />100.00% <br />$ - <br />$ 40.00 <br />Klein Electric <br />16-1600 <br />26A <br />Electrical -Permit <br />$ 1,325.00 <br />$ - <br />$ - <br />$ 1,325.00 <br />$ 1,325.00 <br />$ 1,325.00 <br />100.00% <br />$ - <br />$ 66.25 <br />Klein Electric <br />16-1600 <br />26A <br />Electrical -Bond <br />$ 4,347.00 <br />$ - <br />$ - <br />$ 4,347.00 <br />$ 4,347.00 <br />$ 4,347.00 <br />100.00% <br />$ - <br />$ 217.35 <br />Klein Electric <br />16-1600 <br />26A <br />Mobilization <br />$ 22,936.00 <br />$ - <br />$ - <br />$ 22,936.00 <br />$ - <br />$ 4,587.00 <br />$ 4,587.00 <br />20.00% <br />$ 18,349.00 <br />$ 229.35 <br />Klein Electric <br />16-1600 <br />26A <br />Temp Power/Job Trailer <br />$ 1,710.00 <br />$ - <br />$ - <br />$ 1,710.00 <br />$ 1,368.00 <br />$ 1,368.00 <br />60.00% <br />$ 342.00 <br />$ 66.40 <br />Klein Electric <br />16-1600 <br />26A <br />Temp Power/Site <br />$ 3,325.00 <br />$ - <br />$ - <br />$ 3,325.00 <br />$ 2,660.00 <br />$ 2,660.00 <br />60.00% <br />$ 665.00 <br />$ 133.00 <br />Klein Electric <br />16-1600 <br />26A <br />Temp Power/Building <br />$ 3,325.00 <br />$ - <br />$ - <br />$ 3,325.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,325.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Switchgear Package/Graybar Electric Co <br />$ 28,845.00 <br />$ - <br />$ - <br />$ 28,845.00 <br />$ 3,115.00 <br />$ 7,246.00 <br />$ 10,361.00 <br />35.92% <br />$ 18,484.00 <br />$ 516.05 <br />Paga3/7 <br />