My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.4 SR 07-19-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
07-19-2021
>
8.4 SR 07-19-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 4:31:32 PM
Creation date
7/15/2021 12:10:46 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a 3- a-,4�2s o <br />"rx v llt ZWt <br />DOCUMENT 00 4100 <br />2oa•� Ili vas S>l�� � <br />BID FORM <br />46 rJRen,, <br />BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS FOR THE <br />FOLLOWING UNIT <br />PRICES AND/OR LUMP SUMS, WHICH INCLUDE SALES TAX AND OTHER APPLICABLE TAXES AND FEES. THE CITY <br />RESERVES THE RIGHT TO ADD OR ELIMINATE PARTIAL OR ENTIRE QUANTITIES OF INDIVIDUAL BID ITEMS. <br />COUNTRY CROSSINGS AND FRESNO PARKS GENERAL SITE IMPROVEMENTS <br />Item Section 1 - Removals/Mobilization Unit Est. Qty <br />No. <br />Unit Price <br />Amount <br />Description <br />in Dollars <br />In Dollars <br />Provide all necessary construction <br />1 surveying and staking to meet layout <br />LS 1 <br />and grading requirements for all work <br />SyZo.3#4 <br />1 5429.314 <br />- complete. <br />2 Mobilization LS 1 <br />gS3q.?q <br />gS39.79 <br />Remove bituminous pavement <br />3 including saw cut at edge to remain - SY 1,607 <br />7.7q <br />f 2518. 53 <br />complete. <br />4 Remove basketball hoop and footings EA 4 <br />as encountered -com late. <br />4442. yq <br />17t q At. <br />Section 2 - Removals/Mobilization Total <br />24 '24 S.IPL <br />Item Section 2 — Earthwork Description Unit Est. Qty <br />No. <br />Unit Price <br />Amount <br />In Dollars <br />In Dollars <br />"On -site earthwork as required to <br />achieve plan grades and on -site <br />earthwork balance - complete, <br />including 1) stripping and stockpiling <br />of topsoil; 2) common excavation of <br />subsoil materials to subgrade <br />1 elevations identified for paving areas LS 1 <br />(a 1 31 • 'f 4 <br />L 131.3$ <br />and play areas; 3) maintenance of <br />grades throughout construction <br />including all silt fence, bio rolls, or <br />other approved method; 4) final <br />grading to specified tolerances - <br />complete <br />Furnish and install 9° compacted <br />2 depth select topsoil borrow (planting SY 805 <br />IS.493 <br />12 So 1 • `,S <br />beds) - complete. (Fresno Park) <br />ww <br />Furnish and install silt fence -M <br />3 LF 523 <br />complete. (Both Parks) <br />Z. G <br />112q •42 <br />4 Furnish and install inlet protection - EA 2 <br />com, fete. 'Both Parks <br />2'» •oZ <br />S42 .oN <br />Install and maintain rock construction <br />5 entrance - remove upon completion EA 2 <br />of construction operations. (Both <br />Parks <br />Section 2 - Earthwork TotalBid <br />Form <br />00 4100-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.