My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.4 SR 07-19-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
07-19-2021
>
8.4 SR 07-19-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 4:31:32 PM
Creation date
7/15/2021 12:10:46 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOCUMENT 00 4100 0� f'A <br />BID FORM 4001s ,X <br />BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS NTS FOR THE FOLLOWN 330 <br />NIT <br />PRICES AND/OR LUMP SUMS, WHICH INCLUDE SALES TAX AND OTHER APPLICABLE TAXES AND FEES. THE CITY <br />RESERVES THE RIGHT TO ADD OR ELIMINATE PARTIAL OR ENTIRE QUANT MES OF INDIVIDUAL BID ITEMS. <br />TROTT BROOK PARK TENNIS COURT IMPROVEMENTS <br />Item Section 1- Removals/Mobilization <br />No. Description Unit Est, Qty Unit Price Amount <br />Provide all necessary construction In Dollars In Dollars <br />1 surveying and staking to meet layout <br />and grading requirements for all work LS 1 <br />- corn lete. S42?.8µ 942,7.114 <br />2 Mobilization LS 1 <br />Remove bituminous pavement 14' IS .o0 14$1 .00 <br />3 including saw cut at edge to remain - SY 1,566 <br />corn lete. 2 92 <br />4 Remove chain link fence - complete. LF 303 <br />Remove tennis court net standards <br />5 and footings as encountered LS 1 <br />com fete. '708.98 log , <br />Section 1 - Removals/Mobilization Total <br />Item <br />No. Section 2 - Earthwork Description Unit Est, qty <br />*On -site earthwork as required to .."'" <br />achieve plan grades and on -site <br />earthwork balance - complete, <br />including 1) stripping and stockpiling <br />of topsoil; 2) common excavation of <br />subsoil materials to subgrade <br />1 elevations identified for paving areas LS 1 <br />and hauling of excess materials; 3) <br />maintenance of grades throughout <br />construction including all silt fence, <br />bio roils, or other approved method; <br />4) final grading to specified <br />2$3&3.442- <br />Unit Price Amount <br />49, 3r.`. 28 �' 49, 5(A z.-9 <br />2 Fumish and install silt fence - <br />complete. LF 608 �• I b <br />Install and maintain rock construction 13 13. 28 <br />3 entrance -remove upon completion EA <br />of construction o erations. 1 542.-fig <br />5�2.78 <br />Section 2 - Earthwork Total <br />Sl 22 2.34 <br />Bid Form <br />00 41004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.