Laserfiche WebLink
<br />Pinewood Estates Second Addition/P 05-13 <br />August 15,2005 <br /> <br />Page 8 <br /> <br />17. PARK DEDICATION CREDIT FOR THE INTERNAL TRAIL CORRIDOR. <br />CASH, AT THE RATE APPLICABLE AT THE TIME OF FINAL PLAT <br />APPROVAL, SHALL BE PAID TO COMPLETE THE PARK DEDICATION <br />REQUIREMENTS. <br /> <br />18. LOT 6,7 AND 8, BLOCK 1 SHALL BE ELIMINATED. LOT 22, BLOCK 3 <br />SHALL BE ELIMINATED. <br /> <br />19. AN INTERNAL TRIAL SHLL BE PROVIDED FROM STREET A TO THE <br />WEST BOUNDARY OF THE PLAT, A TRAIL SHALL BE PROVIDED <br />ALONG COUNTY ROAD 30 ALONG WITH A CONNECTION TO <br />STREET B, AND A TRAIL OR SIDEWALK SHALL BE PROVIDED ALONG <br />WACO STREET <br /> <br />20. THE RIGHT-OF-WAY FOR STREET B SHALL BE EXTENDED SO THAT <br />IT ABUTS COUNTY ROAD 30. <br /> <br />21. ALL LOTS ABUTTING EXISTING LOTS IN PINEWOOD SHALL BE A <br />MINIMUM OF 20,000 SQUARE FEET IN SIZE. <br /> <br />S:\PLANNING\Case Files\2005\P 05-13 Pinewood Estates 2nd\P05-13CC8-15.doc <br />