My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.4. SR 08-15-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
08/15/2005
>
6.4. SR 08-15-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:23 AM
Creation date
8/12/2005 10:05:31 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/15/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Elk River <br />Attn: Michele McPherson <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330 <br /> <br />13880 Hwy 10 West <br />Elk River, MN 55330 <br />(763) 241-7030' 800-594-5208 <br /> <br /> <br />July 7,2005 <br /> <br />Sherburne County <br />PUBLIC WORKS DEPARTMENT <br /> <br />RE: Kingdom Estates Third Addition <br /> <br />Dear Ms. McPherson; <br /> <br />We have reviewed the proposal for Kingdom Estates Second Addition and offer the following <br />comments. Access for Olson Street to County Highway 33 has been approved and constructed; <br />however there are drainage issues in this area that are still being resolved with the City of Elk <br />River. It may be possible that those issues will need to be readdressed as part of this proposal. <br /> <br />One of the original conditions for plat approval of Kingdom Estates was that a bypass and right <br />turn lane were required on CH 33. It was later negotiated that when any additional lots are <br />created the auxiliary lanes would be required; therefore with this proposal Sherburne County will <br />require the construction of both a bypass and right turn lane constructed to County standards. <br />There is a centerline culvert under CH 33 in the bypass area that must be extended. Please see <br />enclosed detail for standards. <br /> <br />As stated in our initial review letter dated March 4, 2003 these auxiliary lanes are located in <br />areas where there is only 33' of right of way. We will require a signed slope easement <br />agreement from the affected landowners before an access permit will be granted. Because the <br />access is already constructed with the first phase we suggest the slope easement language be <br />changed to "... before preliminary plat approval is granted". It was also noted that wetland issues <br />may need to be addressed. <br /> <br />An access construction permit and signage fees $700 are required. Sherburne County will <br />install all highway signs. <br /> <br />If you have questions or concerns call me at 763-241-7013. <br /> <br />Sincerely, <br /> <br />~dJ- <br /> <br />Richard D. Corbin <br />Sherburne County Public Works <br /> <br />Cc: Rhonda F. Lewis, County Engineer <br />Terry Maurer, City of Elk River Engineer <br />Bogart, Pederson & Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.