My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. SR 08-15-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
08/15/2005
>
5.1. SR 08-15-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:23 AM
Creation date
8/12/2005 10:05:26 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/15/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />EHLERS <br /> <br />&. /\SSOCI/\-ES II\C <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />Aug 3,2005 <br /> <br />TO: <br /> <br />Heidi Steinmetz, City of Elk River <br />Lori Johnson, City of Elk River <br /> <br />FROM: <br /> <br />Sid Inman, Ehlers and Associates Inc <br /> <br />RE: <br /> <br />But For Analysis For Industrial Park Abatement. <br /> <br />You have asked us to review the abatement proposals that have been presented and comment on the need <br />for the abatement. This is what is referred to as the "But For" analysis. <br /> <br />In the past we have used two different methods of reviewing the need for various types of assistance. In <br />some cases we have compared the purposed project to a similar project and review the returns on equity <br />as the basis for the need for assistance. <br /> <br />Since these projects are somewhat unique, we felt it would be better to use the second method of <br />comparing cost of acquiring the site in the purposed locations with the cost in similar locations. The <br />cities estimates and abatement assistance amounts are in "future dollars" and are designed to bring the <br />cost of the site to zero dollars over a 12 to 14 year period. My calculations are based on the calculations <br />that the staff prepared to determine the purchase price and the assistance. <br /> <br />Attached is a summary chart that shows the impact in "future value dollars" bringing the purchase price to <br />zero dollars per square foot. <br /> <br />Another way to review the purchase price is to review it in "present value dollars" Since the buyers will <br />receive the full amount ofthe abatement over 12 to 14 years to arrive at a value in today's dollars we <br />must add a discount rate. The second portion of the chart shows the net price in present value dollars. <br />Note the range from .58 to .89 if a function of the size of the lot verses the size of the building. <br /> <br />In summary, if you assume that the major competition that the city has is still offering the land at <br />from zero to $.25 a square foot, either analysis satisfies a needs requirement and could be <br />deemed to be justifiable <br />
The URL can be used to link to this page
Your browser does not support the video tag.