My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2. SR 07-06-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
07-06-2021
>
7.2. SR 07-06-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 4:28:26 PM
Creation date
7/2/2021 8:05:31 AM
Metadata
Fields
Template:
City Government
type
SR
date
7/6/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conclusion / Summary (cont) <br />• The new homes in the development serves the need for additional housing <br />• No City, County or State funding is requested as part of this development. <br />• The additional dwelling units and residents will directly benefit local business and will attract <br />new business opportunities to the area. <br />• The Broadway on 10 project will pay approximately $430,000 in park fees and an estimated <br />$430,000 in taxes annually. <br />• Traffic concerns raised by City Staff and residents have been addressed by a Professional <br />Traffic Engineer and conclude that traffic from the proposed development "will have no <br />noticeable impact on the quality or life for the existing neighborhood and that the current <br />and proposed peak trips fall within the "livable range". <br />• The City Planner and Engineer have reviewed the plans along with the traffic study and <br />recommend approval of the Conditional Use Permit and Preliminary Plat for the Broadway on <br />10 project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.