Laserfiche WebLink
PRELIMINARY PLAT & CUPPRELIMINARY PLAT & CUP28 APR 202120 MAY 2021PROJECT NO.FILE NAMELANDFORMc <br />IF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOTVISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDEDREADABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACTTHE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS.PROJECTCERTIFICATION105 South Fifth AvenueSuite 513Minneapolis, MN 55401Tel: 612-252-9070Fax: 612-252-9077Web: landform.netLandform®and Site to Finish®are registered service marks of Landform Professional Services, LLC.DATEISSUE / REVISIONREVIEWCONTACT ENGINEER FOR ANY PRIOR HISTORYISSUE / REVISION HISTORYDEVELOPERMUNICIPALITYBROADWAY ON 10 ELK RIVER, MN PRELIMINARY PLAT AND CUPMay 20, 2021CHU2000BL22021 <br />BROADWAY INVESTORS II, LLC260 WENTWORTH AVE. EASTSUITE 113SAINT PAUL, MN 55118-5511 TEL: 563-570-7510L701CHU001.DWGLANDSCAPEDETAILSL7.1TREE SHALL BE PLANTED WITH ROOT FLARE EVENWITH SOIL LINE OR FIRST MAJOR BRANCHING ROOTONE (1) INCH BELOW SOIL LINE. IF ROOT FLARE IS NOT APPARENT IT MAY BECOVERED BY BURLAP OR SOIL. ADJUST PLANT AS NEEDED TO MAINTAINAPPROPRIATE DEPTH.DOUBLE STRAND 14 GA. WIRE -3' @ 120 DEGREE INTERVALS (TYP.)VARIES <br />AREA DUG FOR PLANTING2x-3x DIA. OF SOIL BALL24" MIN <br />SCARIFY BOTTOM AND SIDES OF HOLEPRIOR TO PLANTING2" X 2" X 24" WOOD STAKE SET AT ANGLEPLANTING SOIL (SEE PLANS) EDGE CONDITION VARIES (SEE PLANS)CUT TOP OF WIRE BASKET 1/3 (MIN.)FROM TOP OF BALL. CUT TWINE FROM AROUND TOP 1/3 (MIN.) OF ROOTBALL.CUT AND ROLL BACK BURLAP 1/3 (MIN.) FROM TOP OF ROOTBALL.16" POLYPROPYLENE OR POLYETHYLENE(40 MIL, 1-1/2" WIDE STRAP TYP.)FLAGGING: ONE (1) PER WIRE8' STEEL STAKE.PLACE TWO (2) INCHESFROM ROOT BALL.INSPECT FOR ENCIRCLING ROOTS TO MITIGATE FUTURE STEM GIRDLING.REJECT ANY TREES THAT ARE SEVERELY AFFECTED.TWO ALTERNATE METHODS OF TREE STAKING ARE ILLUSTRATED AND TO BEUTILIZED ONLY IF NECESSARY.MAINTAIN TREES IN A PLUMB POSITION THROUGHOUT THE GUARANTEE PERIODAS DEFINED ON PLANS AND/OR SPECIFICATIONS.NOTES:CONIFEROUS TREE PLANTINGEXISTING SUBGRADEAREA DUG/TILLEDTO PROMOTE ROOT GROWTH3-5x DIA. OF SOIL BALLEXISTING SOIL LOOSENEDFOUR (4") INCHES SHREDDED HARDWOOD MULCHSUBGRADEAREA DUG/TILLEDTO PROMOTE ROOT GROWTH3-5x DIA. OF SOIL BALLAREA DUG FOR PLANTING2-3x DIA. OF SOIL BALLSCARIFY BOTTOM AND SIDES OF HOLEPRIOR TO PLANTINGCUT TOP OF WIRE BASKET 1/3 (MIN.)FROM TOP OF ROOTBALL. CUT TWINE FROM AROUND TOP 1/3(MIN.) OF ROOTBALL. CUT AND ROLL BACK BURLAP 1/3 (MIN.)FROM TOP OF ROOTBALL.2" X 2" X 24" WOOD STAKE SET AT ANGLEEXISTING SOIL LOOSENEDPLANTING SOIL (SEE PLANS) EDGE CONDITION VARIESINSPECT FOR ENCIRCLING ROOTS TO MITIGATE FUTURE STEM GIRDLING.REJECT ANY TREES THAT ARE SEVERELY AFFECTED.TWO ALTERNATE METHODS OF TREE STAKING ARE ILLUSTRATED AND TOBE UTILIZED ONLY IF NECESSARY.MAINTAIN TREES IN A PLUMB POSITION THROUGHOUT THE GUARANTEEPERIOD. SEE SPECIFICATIONS.FLAGGING: ONE (1) FLAG PER WIREDOUBLE STRAND 14 GA. WIRE -3' @ 120 DEGREE INTERVALS (TYP.)TREE SHALL BE PLANTED WITH ROOT FLARE EVEN WITH SOIL LINE ORFIRST MAJOR BRANCHING ROOTONE (1) INCH BELOW SOIL LINE. IF ROOT FLARE IS NOT APPARENT ITMAY BE COVERED BY BURLAP OR SOIL. ADJUST PLANT AS NEEDEDTO MAINTAIN APPROPRIATE DEPTH.16" POLYPROPYLENE OR POLYETHYLENE(40 MIL, 1-1/2" WIDE STRAP TYP.)NOTES:8' STEEL STAKE.PLACE WITHINTWO (2) INCHESOF ROOT BALL.DECIDUOUS TREE PLANTINGVARIES PER SPECIES(SEE PLANS)24" MIN.FOUR (4") INCHES SHREDDED HARDWOOD MULCHTREE SHALL HAVE PROTECTIVE TREE WRAP TO FIRST BRANCH14" CARPENTER MESH. FORM A 6" DIAMETER CYLINDER FROM GRADETO FIRST BRANCH. SECURE CYLINDER WITH BLACK ZIP TIES OR 24GAUGE WIRE, AT TOP AND BOTTOM AND TWO EQUALLY SPACED INTHE MIDDLE. DO NOT TIE TO TREE. NO STAKING.AS REQUIRED3' MINWETLAND BUFFER SIGNAGENOTE:SIGNAGE SHALL MEET ALL THEREQUIREMENTS OF THE CITYOF ELK RIVERARTWORK AND VERBIAGE ON SIGNWILL FACE AWAY FROM WETLANDVERBIAGE WILL CONFORM WITH THEREQUIREMENTS OF THE CITY OF ELKRIVER AS FOLLOWS:"WETLAND BUFFER: UNDER THE CITYCODE, NO MOWING, CLEARING ORREMOVAL OF VEGETATION IN THEBUFFER AREA IS ALLOWED. CALL THECITY OF ELK RIVER FOR MOREINFORMATION."3" CHANNEL POST,ENAMEL-COATEDGREEN, OR ASREQUIREDCHANNEL POST EMBEDDED MINIMUM 3' IN GROUNDWETLANDBUFFERSIGNARTWORKHEREAS REQUIRED BOLT SIGNAGE TOPOST WITHGALVANIZED LAGBOLTS, OR ASREQUIREDNO SCALENO SCALENO SCALE321FINISHED GRADETOP OF ROOT MASS SHALL BE LEVEL WITHFINISHED GRADENO SCALESHRUB BED PLANTINGCREATE SAUCER AROUND PLANTWITH PLANTING SOILREFER TO LANDSCAPE PLAN(S) FOR GROUNDCOVEROUTSIDE PLANTING BEDBACKFILL WITH PLANTING SOIL THAT ISTHOROUGHLY TILLED AND LOOSENED. (SEEPLANS)6"SHRUBS (TYP)SCARIFY BOTTOM AND SIDESOF HOLE PRIOR TO PLANTING.FOUR (4) INCH HIGH SOIL BERM CONSTRUCTEDAROUND ENTIRE ROOT BALL. BERM SHALL BEGINAT ROOT BALL EDGE.IF ROOTS ARE PRESENT AROUND THE EDGES OFROOTBALL, UNCOIL OR CUT AS MANY ASPOSSIBLE WITHOUT DESTROYING SOIL MASS.NOTES:PLANT MATERIAL SHALL NOT BE PLACED CLOSERTHAN ONE (1') FOOT FROM EDGE OF PLANTINGBED.DIG SHRUB PLANTING PIT ASCLOSE TO 3X THE WIDESTDIMENSION OF ROOT BALLAS PLANT SPACING PERMITSSPACING VARIES(SEE PLANS)PLANTING SOIL (SEE PLANS)EXISTING SUBGRADESHRUB ROOT BALL SITS ON EXISTING ORRECOMPACTED SUBGRADE.PLACE PLANTS AS SHOWN ON PLANEDGING4" DOUBLE SHREDDED HARDWOOD MULCHSPACINGVARIES(SEEPLANS)4