My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
91-023 ORD
ElkRiver
>
City Government
>
City Council
>
Council Ordinances
>
1990 - 1999
>
1991
>
91-023 ORD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2007 2:37:14 PM
Creation date
8/9/2005 4:11:03 PM
Metadata
Fields
Template:
City Government
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />occurring either during or after construction. <br />This shall be accomplished by limiting the <br />amount and length of time of bare ground <br />exposure. Temporary ground covers, sediment <br />entrapment facilities, vegetated buffer strips, <br />or other appropriate techniques shall be used to <br />minimize erosion impacts on surface water <br />features. Erosion control plans approved by the <br />soil and water conservation district may be <br />required if project size and site physical <br />characteristics warrant. <br /> <br />(2) Be designed and constructed to effectively <br />manage reasonably expected quantities and <br />qualities of stormwater runoff. Impervious <br />surface coverage within any tier shall not <br />exceed 25 percent of the tier area, except 35 <br />percent impervious surface coverage may be <br />allowed in the first tier of general development <br />lakes with an approved stormwater management <br />plan and consistency with part 904.08(3). <br /> <br />. <br /> <br />. <br /> <br />9.183 <br />
The URL can be used to link to this page
Your browser does not support the video tag.