Laserfiche WebLink
Terra Terra Project Number2U7U5 <br />Elk River Fire Station to <br />Elk R <br />CONSTRUCTION City of Elk River <br />CONTINUATION SHEET AIA DOCUMENT G703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 4 <br />Contractor's signed certification is attached. APPLICATION DATE: 5/31/21 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 5/31/21 <br />Use Column I on Contracts where variable retainage for line items may apply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORKCOMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION / <br />SCHEDULED <br />FROM PREVIOUS <br />THIS PERIOD <br />PRESENTLY <br />COMPLETED <br />(G +C) <br />TO FINISH <br />(IF VARIABLE <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Klein Electric <br />16-1600 <br />26A <br />Heat Pumps -Coils Labor <br />$ 1,224.00 <br />$ - <br />$ - <br />$ 1,224.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,224.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Make Up Air Unit Material <br />$ 1,334.00 <br />$ - <br />$ - <br />$ 1,334.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,334.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Make Up Air Unit Labor <br />$ 1,590.00 <br />$ - <br />$ - <br />$ 1,590.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,590.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Pressure Washer Material <br />$ 467.00 <br />$ - <br />$ - <br />$ 467.00 <br />$ - <br />$ - <br />0.00% <br />$ 467.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Pressure Washer Labor <br />$ 903.00 <br />$ - <br />$ - <br />$ 903.00 <br />$ - <br />$ - <br />0.00% <br />$ 903.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Pumps Material <br />$ 979.00 <br />$ - <br />$ - <br />$ 979.00 <br />$ - <br />$ - <br />0.00% <br />$ 979.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Pumps Labor <br />$ 1,443.00 <br />$ - <br />$ - <br />$ 1,443.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,443.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Roof Top Unit Material <br />$ 966.00 <br />$ - <br />$ - <br />$ 966.00 <br />$ - <br />$ - <br />0.00% <br />$ 966.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Roof Top Unit Labor <br />$ 1,918.00 <br />$ - <br />$ - <br />$ 1,918.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,918.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Unit Heaters Material <br />$ 1,200.00 <br />$ - <br />$ - <br />$ 1,200.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,200.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Unit Heaters Labor <br />$ 2,335.00 <br />$ - <br />$ - <br />$ 2,335.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,335.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Steam Generator Material <br />$ 542.00 <br />$ - <br />$ - <br />$ 542.00 <br />$ - <br />$ - <br />0.00% <br />$ 542.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Steam Generator Labor <br />$ 532.00 <br />$ - <br />$ - <br />$ 532.00 <br />$ - <br />$ - <br />0.00% <br />$ 532.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />DIV 27 Data Rough -In Material <br />$ 2,714.00 <br />$ - <br />$ - <br />$ 2,714.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,714.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />DIV 27 Data Rough -In Labor <br />$ 3,398.00 <br />$ - <br />$ - <br />$ 3,398.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,398.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />DIV 27 AV Rough -In Material <br />$ 1,568.00 <br />$ - <br />$ - <br />$ 1,568.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,568.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />DIV 27 AV Rough -In Labor <br />$ 1,760.00 <br />$ - <br />$ - <br />$ 1,760.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,760.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />DIV 26 Fire Alarm/Twenty4Seven <br />$ 7,044.00 <br />$ - <br />$ - <br />$ 7,044.00 <br />$ - <br />$ 699.00 <br />$ 699.00 <br />9.92% <br />$ 6,345.00 <br />$ 34.95 <br />Klein Electric <br />16-1600 <br />26A <br />DIV 26 Fire Alarm Rough -In Material <br />$ 226.00 <br />$ - <br />$ - <br />$ 226.00 <br />$ - <br />$ - <br />0.00% <br />$ 226.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />DIV 26 Fire Alarm Rough -In Labor <br />$ 1,082.00 <br />$ - <br />$ - <br />$ 1,082.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,082.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />DIV 26 Security Rough -In Material <br />$ 592.00 <br />$ - <br />$ - <br />$ 592.00 <br />$ - <br />$ - <br />0.00% <br />$ 592.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />DIV 26 Security Rough -In Labor <br />$ 2,765.00 <br />$ - <br />$ - <br />$ 2,765.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,765.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />DIV 26 Site Future Cameras Material <br />$ 4,147.00 <br />$ - <br />$ - <br />$ 4,147.00 <br />$ - <br />$ - <br />0.00% <br />$ 4,147.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />DIV 26 Site Future Cameras Labor <br />$ 1,856.00 <br />$ - <br />$ - <br />$ 1,856.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,856.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />CO#1 PR#6 Generatorand Transformer <br />$ - <br />$ - <br />$ (19,350.00) <br />$ (19,350.00) <br />$ - <br />$ - <br />0.00% <br />$ (19,350.00) <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />CO#2 PR#2 Overhead Doors & Circuiting <br />$ - <br />$ - <br />$ 1,068.00 <br />$ 1,068.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,068.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />CO#3 PR#3R <br />$ - <br />$ - <br />$ (443.00) <br />$ (443.00) <br />$ - <br />$ - <br />0.00% <br />$ (443.00) <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Mobilization, Bond, SWPP Permit <br />$ 7,000.00 <br />$ - <br />$ - <br />$ 7,000.00 <br />$ 3,500.00 <br />$ 3,500.00 <br />50.00% <br />$ 3,500.00 <br />$ 175.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Bituminous Saw -Cutting Labor <br />$ 2,105.00 <br />$ - <br />$ - <br />$ 2,105.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,105.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Bituminous Removal Labor <br />$ 3,640.00 <br />$ - <br />$ - <br />$ 3,640.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,640.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Concrete Saw -Cutting Labor <br />$ 160.00 <br />$ - <br />$ - <br />$ 160.00 <br />$ - <br />$ - <br />0.00% <br />$ 160.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Concrete Removal Labor <br />$ 3,236.00 <br />$ - <br />$ - <br />$ 3,236.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,236.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Tree Protection Labor <br />$ 75.00 <br />$ - <br />$ - <br />$ 75.00 <br />$ 75.00 <br />$ 75.00 <br />100.00% <br />$ - <br />$ 3.75 <br />Dryden Excavating <br />31-1000 <br />31A <br />Clearing&Grubbing Labor <br />$ 2,100.00 <br />$ - <br />$ - <br />$ 2,100.00 <br />$ 2,100.00 <br />$ 2,100.00 <br />100.00% <br />$ - <br />$ 105.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Topsoil Stripping & Emb. Labor <br />$ 1,386.00 <br />$ - <br />$ - <br />$ 1,386.00 <br />$ 1,386.00 <br />$ 1,386.00 <br />100.00% <br />$ - <br />$ 69.30 <br />Dryden Excavating <br />31-1000 <br />31A <br />Export Excess Topsoil Labor <br />$ 14,055.00 <br />$ - <br />$ - <br />$ 14,055.00 <br />$ 14,055.00 <br />$ 14,055.00 <br />100.00% <br />$ - <br />$ 702.75 <br />Dryden Excavating <br />31-1000 <br />31A <br />Site Grading Labor <br />$ 56,076.01 <br />$ - <br />$ - <br />$ 56,076.01 <br />$ 11,215.20 <br />$ 21,034.80 <br />$ 32,250.00 <br />57.51% <br />$ 23,826.01 <br />$ 1,612.50 <br />Dryden Excavating <br />31-1000 <br />31A <br />Site Grading Material <br />$ 14,040.00 <br />$ - <br />$ - <br />$ 14,040.00 <br />$ - <br />$ - <br />0.00% <br />$ 14,040.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Exc. & Back -fill Foundations <br />$ 25,378.00 <br />$ - <br />$ - <br />$ 25,378.00 <br />$ - <br />$ 7,613.40 <br />$ 7,613.40 <br />30.00% <br />$ 17,764.60 <br />$ 360.67 <br />Dryden Excavating <br />31-1000 <br />31A <br />Building Sand Cushion Labor <br />$ 3,298.00 <br />$ - <br />$ - <br />$ 3,298.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,298.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Building Sand Cushion Material <br />$ 629.00 <br />$ - <br />$ - <br />$ 629.00 <br />$ - <br />$ - <br />0.00% <br />$ 629.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Class 5 Labor <br />$ 9,014.00 <br />$ - <br />$ - <br />$ 9,014.00 <br />$ - <br />$ - <br />0.00% <br />$ 9,014.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Class 5 Material <br />$ 7,854.00 <br />$ - <br />$ - <br />$ 7,854.00 <br />$ - <br />$ - <br />0.00% <br />$ 7,854.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Subgrade Prep Labor <br />$ 8,595.00 <br />$ - <br />$ - <br />$ 8,595.00 <br />$ 1,719.00 <br />$ 2,578.50 <br />$ 4,297.50 <br />50.00% <br />$ 4,297.50 <br />$ 214.66 <br />Dryden Excavating <br />31-1000 <br />31A <br />Dewatering Labor <br />$ 2,625.00 <br />$ - <br />$ - <br />$ 2,625.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,625.00 <br />$ - <br />Page 5 / 6 <br />