Laserfiche WebLink
in Electric <br />16-1600 <br />26A <br />PD- Security Rough-In's <br />Material <br />$ 1,184.00 <br />$ - <br />$ - <br />$ 1,184.00 <br />$ 396.00 <br />in Electric <br />16-1600 <br />26A <br />PD- Security Rough-In's <br />Labor <br />$ 3,376.00 <br />$ - <br />$ - <br />$ 3,376.00 <br />$ 844.00 <br />in Electric <br />16-1600 <br />26A <br />PD-Fire Alarm Rough-In's <br />Material <br />$ 368.00 <br />$ - <br />$ - <br />$ 368.00 <br />$ 276.00 <br />$ 92.00 <br />in Electric <br />16-1600 <br />26A <br />PD-Fire Alarm Rough-In's <br />Labor <br />$ 1,786.00 <br />$ - <br />$ - <br />$ 1,786.00 <br />$ 1,339.00 <br />$ 447.00 <br />in Electric <br />16-1600 <br />26A <br />PD-DATA Rough-In's <br />Material <br />$ 678.00 <br />$ - <br />$ - <br />$ 678.00 <br />$ 339.00 <br />$ 305.00 <br />in Electric <br />16-1600 <br />26A <br />PD-DATA Rough-In's <br />Labor <br />$ 1,752.00 <br />$ - <br />$ - <br />$ 1,752.00 <br />$ 877.00 <br />$ 788.00 <br />in Electric <br />16-1600 <br />26A <br />CO#1 ASI#6 <br />$ - <br />$ - <br />$ 773.00 <br />$ 773.00 <br />$ 773.00 <br />in Electric <br />16-1600 <br />26A <br />CO#2 Rough -in for future PD heat <br />$ - <br />$ - <br />$ 2,612.00 <br />$ 2,612.00 <br />$ 2,612.00 <br />in Electric <br />16-1600 <br />26A <br />CO#3 COR#27 PD Cabinet Lighting <br />$ - <br />$ - <br />$ 965.00 <br />$ 965.00 <br />$ 965.00 <br />in Electric <br />16-1600 <br />26A <br />CO#4 PR#04R <br />$ - <br />$ - <br />$ 2,267.00 <br />$ 2,267.00 <br />$ 453.00 <br />$ 297.00 <br />in Electric <br />16-1600 <br />26A <br />CO#5 PR#06R <br />$ - <br />$ - <br />$ (1,050.00) <br />$ (1,050.00) <br />$ - <br />$ (1,050.00) <br />in Electric <br />16-1600 <br />26A <br />CO#6 PR#11 <br />$ - <br />$ - <br />$ 713.00 <br />$ 713.00 <br />$ 713.00 <br />in Electric <br />16-1600 <br />26A <br />CO#7 COR#32 Light Demo PD Level 2 <br />$ - <br />$ - <br />$ 380.00 <br />$ 380.00 <br />$ 380.00 <br />in Electric <br />16-1600 <br />26A <br />COBS PR#12 <br />$ - <br />$ - <br />$ 2,282.00 <br />$ 2,282.00 <br />$ 2,053.00 <br />$ 229.00 <br />in Electric <br />16-1600 <br />26A <br />CO#9 Backcharge for Wall Tile (Non-OC $-150) <br />$ - <br />$ - <br />$ (150.00) <br />$ (150.00) <br />$ (150.00) <br />in Electric <br />16-1600 <br />26A <br />CO#10 ASI#12 <br />$ - <br />$ - <br />$ 1,992.00 <br />$ 1,992.00 <br />$ 996.00 <br />$ 996.00 <br />in Electric <br />16-1600 <br />26A <br />CO#11 PR#15 <br />$ - <br />$ - <br />$ 178.00 <br />$ 178.00 <br />$ 36.00 <br />in Electric <br />16-1600 <br />26A <br />CO#12 RFI#100 <br />$ - <br />$ - <br />$ 527.00 <br />$ 527.00 <br />$ 527.00 <br />in Electric <br />16-1600 <br />26A <br />CO#13 PR#22 <br />$ - <br />$ - <br />$ 3,483.00 <br />$ 3,483.00 <br />$ - <br />$ 2,134.00 <br />in Electric <br />16-1600 <br />26A <br />CO#14 PR#18 <br />$ - <br />$ - <br />$ 961.00 <br />$ 961.00 <br />$ <br />in Electric <br />16-1600 <br />26A <br />CO#15 ASI#14R <br />$ - <br />$ - <br />$ 1,702.00 <br />$ 1,702.00 <br />$ - <br />$ 1,702.00 <br />in Electric <br />16-1600 <br />26A <br />CO#16 PR#21 <br />$ - <br />$ - <br />$ 122.00 <br />$ 122.00 <br />$ - <br />w Look <br />31-1000 <br />31A <br />Mobilization <br />$ 27,400.00 <br />$ - <br />$ - <br />$ 27,400.00 <br />$ 27,400.00 <br />w Look <br />31-1000 <br />31A <br />Locates, Permits, Surveys <br />$ 17,380.00 <br />$ - <br />$ - <br />$ 17,380.00 <br />$ 17,380.00 <br />w Look <br />31-1000 <br />31A <br />Erosion Control <br />$ 4,840.00 <br />$ - <br />$ - <br />$ 4,840.00 <br />$ 4,840.00 <br />w Look <br />31-1000 <br />31A <br />EC Materials <br />$ 4,000.00 <br />$ - <br />$ - <br />$ 4,000.00 <br />$ 4,000.00 <br />w Look <br />31-1000 <br />31A <br />Removals <br />$ 15,750.00 <br />$ - <br />$ - <br />$ 15,750.00 <br />$ 15,750.00 <br />w Look <br />31-1000 <br />31A <br />Temp Agg Base <br />$ 6,350.00 <br />$ - <br />$ - <br />$ 6,350.00 <br />$ 6,350.00 <br />w Look <br />31-1000 <br />31A <br />Grading <br />$ 15,980.00 <br />$ - <br />$ - <br />$ 15,980.00 <br />$ 15,980.00 <br />w Look <br />31-1000 <br />31A <br />Sand Import <br />$ 2,332.00 <br />$ - <br />$ - <br />$ 2,332.00 <br />$ 2,332.00 <br />w Look <br />31-1000 <br />31A <br />Soil Correction <br />$ 17,885.00 <br />$ - <br />$ - <br />$ 17,885.00 <br />$ 17,885.00 <br />w Look <br />31-1000 <br />31A <br />Structure Exc <br />$ 39,240.00 <br />$ - <br />$ - <br />$ 39,240.00 <br />$ 27,638.00 <br />w Look <br />31-1000 <br />31A <br />Topsoil <br />$ 14,300.00 <br />$ - <br />$ - <br />$ 14,300.00 <br />$ - <br />wLook <br />31-1000 <br />31A <br />Fine Grading <br />$ 11,943.00 <br />$ - <br />$ - <br />$ 11,943.00 <br />$ - <br />w Look <br />31-1000 <br />31A <br />CO#1 PR#2R Grade Prep <br />$ - <br />$ - <br />$ 290.79 <br />$ 290.79 <br />$ 290.79 <br />w Look <br />31-1000 <br />31A <br />CO#2 PR#03 <br />$ - <br />$ - <br />$ 477.79 <br />$ 477.79 <br />$ 477.79 <br />w Look <br />31-1000 <br />31A <br />CO#3 ASI 1 <br />$ - <br />$ - <br />$ 11,031.51 <br />$ 11,031.51 <br />$ 5,516.00 <br />$ 1,103.00 <br />w Look <br />31-1000 <br />31A <br />CO#4 T&M Class 5 Entrances <br />$ - <br />$ - <br />$ 1,345.00 <br />$ 1,345.00 <br />$ 1,345.00 <br />w Look <br />31-1000 <br />31A <br />CO#5 Wellfield Excavation <br />$ - <br />$ - <br />$ 1,082.79 <br />$ 1,082.79 <br />$ - <br />$ 1,082.79 <br />w Look <br />31-1000 <br />31A <br />CO#6 Frost Removal <br />$ - <br />$ - <br />$ 1,552.00 <br />$ 1,552.00 <br />$ - <br />ler Fence <br />32-4000 <br />32A <br />Fencing <br />$ 120,375.00 <br />$ - <br />$ (22,247.00) <br />$ 98,128.00 <br />$ - <br />tumn Ridge <br />32-3291 <br />32B <br />Landscaping <br />$ 42,980.00 <br />$ - <br />$ - <br />$ 42,980.00 <br />$ - <br />uminous Roadways <br />32-1216 <br />32C <br />Asphalt <br />$ 144,740.00 <br />$ - <br />$ - <br />$ 144,740.00 <br />$ - <br />$ 22,000.00 <br />uminous Roadways <br />32-1216 <br />32C <br />CO#1 ASI1 <br />$ - <br />$ - <br />$ 3,110.00 <br />$ 3,110.00 <br />$ - <br />Paul Utilities <br />31-3123 <br />33A <br />Water Main Labor <br />$ 20,000.00 <br />$ - <br />$ - <br />$ 20,000.00 <br />$ 6,500.00 <br />$ 13,500.00 <br />Paul Utilities <br />31-3123 <br />33A <br />Water Main Material <br />$ 10,000.00 <br />$ - <br />$ - <br />$ 10,000.00 <br />$ - <br />$ 10,000.00 <br />Paul Utilities <br />31-3123 <br />33A <br />Storm Sewer Labor <br />$ 29,000.00 <br />$ - <br />$ - <br />$ 29,000.00 <br />$ 13,000.00 <br />$ 5,000.00 <br />Paul Utilities <br />31-3123 <br />33A <br />Storm Sewer Material <br />$ 25,000.00 <br />$ - <br />$ - <br />$ 25,000.00 <br />$ 8,500.00 <br />$ 10,500.00 <br />Paul Utilities <br />31-3123 <br />33A <br />CO#1 PR#10 <br />$ - <br />$ - <br />$ 2,800.00 <br />$ 2,800.00 <br />$ - <br />$ 2,800.00 <br />Paul Utilities <br />31-3123 <br />33A <br />CO#2 PR#13 Storm Sewer <br />$ - <br />$ - <br />$ 5,560.00 <br />$ 5,560.00 <br />$ - <br />$ 5,560.00 <br />GRAND TOTALS <br />$ 6,290,219.00 <br />$ - <br />$ (0.00) <br />$ 6,290,219.00 <br />$ 3,735,290.61 <br />$ 633,529.14 $ <br />396.00 <br />844.00 <br />368.00 <br />1,786.00 <br />644.00 <br />1,665.00 <br />773.00 <br />2,612.00 <br />965.00 <br />750.00 <br />713.00 <br />380.00 <br />2,282.00 <br />(150.00 <br />1,992.00 <br />36.00 <br />527.00 <br />2,134.00 <br />1,702.00 <br />27,400.00 <br />17,380.00 <br />4,840.00 <br />4,000.00 <br />15,750.00 <br />6,350.00 <br />15,980.00 <br />2,332.00 <br />17,885.00 <br />27,638.00 <br />290.79 <br />477.79 <br />6,619.00 <br />1,345.00 <br />1,082.79 <br />$ <br />$ <br />$ 22,000.00 <br />$ 20,000.00 <br />$ 10,000.00 <br />$ 18,000.00 <br />$ 19,000.00 <br />$ 2,800.00 <br />$ 5,560.00 <br />$ 4,368,819.75 <br />33.45% $ 788.00 <br />25.00% $ 2,532.00 <br />100.00% $ - <br />100.00% $ - <br />94.99% $ 34.00 <br />95.03% $ 87.00 <br />100.00% $ - <br />100.00% $ <br />100.00% $ <br />33.08% $ 1,517.00 <br />100.00% $ - <br />100.00% $ <br />100.00% $ <br />100.00% $ <br />100.00% $ <br />100.00% $ <br />20.22% $ 142.00 <br />100.0N $ <br />61.27% $ 1,349.00 <br />0.00% $ 961.00 <br />100.00% $ - <br />0.00% $ 122.00 <br />62 <br />76 <br />69 <br />v - v <br />$ 11,602.00 $ <br />$ 14,300.00 $ <br />$ 11,943.00 $ <br />$ 4,412.51 $ <br />$ 1,552.00 $ <br />$ 98,128.00 $ <br />$ 42,980.00 $ <br />$ 122,740.00 $ <br />$ 3,110.00 $ <br />$ 11,000.00 $ <br />$ 6,000.00 $ <br />$ 1,921,399.25 $ <br />19.80 <br />42.20 <br />18.40 <br />89.30 <br />32.20 <br />83.25 <br />38.65 <br />130.60 <br />48.25 <br />37.50 <br />35.65 <br />19.00 <br />114.10 <br />(7.50 <br />99.60 <br />1.80 <br />26.35 <br />106.70 <br />85.10 <br />1,370.00 <br />869.00 <br />242.00 <br />200.00 <br />787.50 <br />317.50 <br />799.00 <br />116.60 <br />894.25 <br />1,381.90 <br />14.54 <br />23.89 <br />330.95 <br />67.25 <br />54.14 <br />1,100.00 <br />1,000.00 <br />500.00 <br />900.00 <br />950.00 <br />140.00 <br />278.00 <br />218,440.99 <br />