My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-18-2021 HPC MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Heritage Preservation Commission
>
HPC Minutes
>
2021-2030
>
2021
>
03-18-2021 HPC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2021 4:15:56 PM
Creation date
5/25/2021 4:15:56 PM
Metadata
Fields
Template:
City Government
type
HPM
date
3/18/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ventage Preservation Commission Meeting <br /> Elk River City ITall <br /> March 18,2021 <br /> Mr. Carlton stated as long as there is a schedule and planned ahead of time, there <br /> would be no problems using staff. He stated they can finalize a budget amount at the <br /> May commission meeting. <br /> Mr. Carlton provided an update on the water tower restoration project. He spoke to <br /> the contractor,who was going to consider moving the city's project to the start of <br /> his schedule and may be able to begin work in late April or early May. <br /> Mr. Carlton led the commission through a brainstorming session to provide <br /> feedback on the vision of the water tower site. The commission reviewed a draft <br /> layout and discussed including the following: <br /> -Information kiosks <br /> -U-shaped flow with stops for information either by category or historical order <br /> -Benches <br /> -Pergola along a concrete walkway <br /> -Lower shrubbery and flowers to prevent visual barriers with taller, larger items. <br /> -Mural with scene of the downtown on fire (representing the need for the water <br /> tower) <br /> -Create an atmosphere of a meeting place <br /> Mr. Carlton suggested a minimalist approach to begin with — sidewalk, benches, add <br /> kiosks,low investment and maintenance. <br /> Commissioner Mauren, Commissioner Mortensen, and Commissioner Cole asked to <br /> be involved in helping with the RFP for the site design. <br /> Commissioner Griffiths provided an update on the academic journal project,noting <br /> he looked into accessing some research services specifically Newspapers.com to see <br /> if the city could access their items to use on the city's website and is waiting to hear <br /> back to see if the city has the rights to use them. He is also waiting to get back into <br /> the Sherburne History Center to access their records. <br /> 7. Adjournment <br /> There being no further business, Chair Lindberg adjourned the meeting of the Elk <br /> River Heritage Preservation Commission at 6:50 p.m. <br />
The URL can be used to link to this page
Your browser does not support the video tag.