My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. PCSR 05-25-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2021
>
05-25-2021
>
8.1. PCSR 05-25-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2021 3:49:32 PM
Creation date
5/21/2021 10:42:33 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
5/25/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MMPA <br /> MMPA Project Narrative <br /> Wnnewa Munlopl Power Agency <br /> operation, there are no specific emissions or nuisances (noise, <br /> smell, etc.) emitted from the use. <br /> The number of employees may vary by development type. For <br /> Number of the example of a datacenter, the number of onsite employees <br /> Employees will generally peak during normal business hours, with a <br /> reduced number of employees onsite during the overnight <br /> shift. <br /> Number of There are currently no parking stalls on site, and all parking and <br /> parking stalls, loading bays would be constructed with the proposed <br /> existing, and development. Parking and loading areas would be constructed <br /> additional to meet the City's parking requirements. <br /> Any screening or security fencing will be determined with the <br /> specific facility use. Datacenters, for example, do not include <br /> Proposed outdoor storage that would warrant any screening. Onsite <br /> Screening backup generators are a common element of datacenter <br /> developments which are typically screened from view using <br /> similar exterior building materials. <br /> Building materials for datacenter developments include high <br /> quality materials and design. Specific materials would be <br /> determined with the specific project, but building materials <br /> Building may include brick, stucco, concrete, steel, and glass. In <br /> Materials particular, the datacenter industry is considerate of <br /> sustainability throughout many elements of the practice, <br /> including the use of sustainable building materials throughout <br /> the development process. <br /> Signage <br /> Monument signs, if any, would comply with city requirements. <br /> Anticipated signage may be limited to the building facade. <br /> Outdoor No outdoor storage is anticipated with datacenter <br /> Storage development. Outdoor storage for other industrial uses would <br /> comply with city requirements. <br /> Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.