My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. PCSR 05-25-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2021
>
05-25-2021
>
5.2. PCSR 05-25-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2021 8:50:35 AM
Creation date
5/21/2021 8:43:00 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
5/25/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of <br /> River <br /> 13065 Orono Parkway <br /> Elk River,MN 55330 <br /> April 7,2021 <br /> Steve Rohlf VIA EMAIL: srohl kcornerstoneauto.com <br /> 17094 Vance St NW e srlogan(ae,cfatith.com <br /> Elk River,MN 55330 <br /> RE: Preliminary Plat Application Complete <br /> Dear Mr. Rohlf, <br /> Thank you for your applications for a Preliminary Plat to subdivide property located at 13275 207`h <br /> Avenue. I will be reviewing your application and preparing the staff report for the Planning <br /> Commission and City Council. <br /> On April 26,2021,the city received your application for the above use. Per state statute 15.99, the <br /> city is required to make a decision within 60 days of receipt of the completed application. <br /> Subdivision 3 of that section requires the city to notify an applicant within 15 business days if <br /> information is missing,delaying the start of the 60-day review period. A city may extend the 60-day <br /> review period up to 120 days to complete the review. <br /> With the receipt of the required materials on April 26,2021,your applications have been deemed <br /> complete, and the 60-day review period starts. These application has been assigned Case Number P <br /> 21-04 and is scheduled to be reviewed by the Planning Commission on May 25,2021,at 6:30 p.m. at <br /> the Elk River City Hall, 13065 Orono Parkway. With a Planning Commission recommendation on <br /> that date,the City Council will review your application on June 7,2021. <br /> Staff conducted a thorough site plan review on April 3,2021,and has the following comments: <br /> City Comments <br /> ■ Ensure all curves are designed to 30 MPH other than south curve. Show design speed for <br /> southern curve. <br /> ■ Stormwater management needs to meet NPDES and city stormwater ordinance. <br /> ■ Must use concrete flex mats at all storm pipe outlets instead of rip-rap. <br /> ■ Install storm sewer rather than swales at all locations. <br /> ■ Show culvert locations/elevations for driveways. <br /> ■ Add driveway slopes to development plans. <br /> ■ Provide D&Us wide enough to provide access for maintenance of stormwater BMPs. <br /> ■ Ensure permission is granted from adjacent property owner for grading inside their property. <br /> ■ The northern connection will be north of the current cul-de-sac fan area. Remove the extra <br /> pavement and construct as a typical through street. <br /> P O r E H E O 9 Y <br /> Phone: 763.635.1000 INWURE] <br /> www.ElkRiverMN.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.