|
n Electric
<br />16-1600
<br />26A
<br />FD -MAU
<br />Labor
<br />$ 797.00
<br />$ -
<br />$ -
<br />$ 797.00
<br />$ 399.00
<br />$ 398.00
<br />$ 797.00
<br />100.00%
<br />$ -
<br />$ 39.8'
<br />n Electric
<br />16-1600
<br />26A
<br />FD - CU
<br />Material
<br />$ 764.00
<br />$ -
<br />$ -
<br />$ 764.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 764.00
<br />$ -
<br />nElectric
<br />16-1600
<br />26A
<br />FD -CU
<br />Labor
<br />$ 1,074.00
<br />$ -
<br />$ -
<br />$ 1,074.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 1,074.00
<br />$ -
<br />nElectric
<br />16-1600
<br />26A
<br />FD -AHU
<br />Material
<br />$ 174.00
<br />$ -
<br />$ -
<br />$ 174.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 174.00
<br />$ -
<br />nElectric
<br />16-1600
<br />26A
<br />FD -AHU
<br />Labor
<br />$ 618.00
<br />$ -
<br />$ -
<br />$ 618.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 618.00
<br />$ -
<br />n Electric
<br />16-1600
<br />26A
<br />FD - Steam Generator
<br />Material
<br />$ 669.00
<br />$ -
<br />$ -
<br />$ 669.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 669.00
<br />$ -
<br />nElectric
<br />16-1600
<br />26A
<br />FD - Steam Generator
<br />Labor
<br />$ 1,108.00
<br />$ -
<br />$ -
<br />$ 1,108.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 1,108.00
<br />$ -
<br />n Electric
<br />16-1600
<br />26A
<br />FD - Pressure Washers
<br />Material
<br />$ 244.00
<br />$ -
<br />$ -
<br />$ 244.00
<br />$ 24.00
<br />$ 24.00
<br />9.84%
<br />$ 220.00
<br />$ 1.21
<br />n Electric
<br />16-1600
<br />26A
<br />FD- Pressure Washers
<br />Labor
<br />$ 688.00
<br />$ -
<br />$ -
<br />$ 688.00
<br />$ 68.00
<br />$ 68.00
<br />9.88%
<br />$ 620.00
<br />$ 3.41
<br />n Electric
<br />16-1600
<br />26A
<br />FD -Audio Visual Rough-In's
<br />Material
<br />$ 640.00
<br />$ -
<br />$ -
<br />$ 640.00
<br />$ 64.00
<br />$ 96.00
<br />$ 160.00
<br />25.00%
<br />$ 480.00
<br />$ 8.01
<br />n Electric
<br />16-1600
<br />26A
<br />FD -Audio Visual Rough-In's
<br />Labor
<br />$ 1,237.00
<br />$ -
<br />$ -
<br />$ 1,237.00
<br />$ 124.00
<br />$ 186.00
<br />$ 310.00
<br />25.06%
<br />$ 927.00
<br />$ 15.51
<br />n Electric
<br />16-1600
<br />26A
<br />FD - Security Rough In's
<br />Material
<br />$ 664.00
<br />$ -
<br />$ -
<br />$ 664.00
<br />$ 265.00
<br />$ 265.00
<br />39.91%
<br />$ 399.00
<br />$ 13.2'
<br />n Electric
<br />16-1600
<br />26A
<br />FD - Security Rough In's
<br />Labor
<br />$ 1,900.00
<br />$ -
<br />$ -
<br />$ 1,900.00
<br />$ 760.00
<br />$ 760.00
<br />40.00%
<br />$ 1,140.00
<br />$ 38.01
<br />n Electric
<br />16-1600
<br />26A
<br />FD- Fire Alarm Rough In's
<br />Material
<br />$ 205.00
<br />$ -
<br />$ -
<br />$ 205.00
<br />$ 42.00
<br />$ 42.00
<br />20.49%
<br />$ 163.00
<br />$ 2.11
<br />n Electric
<br />16-1600
<br />26A
<br />FD - Fire Alarm Rough In's
<br />Labor
<br />$ 1,003.00
<br />$ -
<br />$ -
<br />$ 1,003.00
<br />$ 200.00
<br />$ 200.00
<br />19.94%
<br />$ 803.00
<br />$ 10.01
<br />n Electric
<br />16-1600
<br />26A
<br />FD - DATA Rough-In's
<br />Material
<br />$ 377.00
<br />$ -
<br />$ -
<br />$ 377.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 377.00
<br />$ -
<br />n Electric
<br />16-1600
<br />26A
<br />FD - DATA Rough-In's
<br />Labor
<br />$ 988.00
<br />$ -
<br />$ -
<br />$ 988.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 988.00
<br />$ -
<br />nElectric
<br />16-1600
<br />26A
<br />PD- Demolition
<br />$ 3,916.00
<br />$ -
<br />$ -
<br />$ 3,916.00
<br />$ 1,958.00
<br />$ 1,958.00
<br />50.00%
<br />$ 1,958.00
<br />$ 97.91
<br />n Electric
<br />16-1600
<br />26A
<br />PD-Temporary Power/Lights
<br />$ 2,053.00
<br />$ -
<br />$ -
<br />$ 2,053.00
<br />$ 1,026.00
<br />$ 513.00
<br />$ 1,539.00
<br />74.96%
<br />$ 514.00
<br />$ 76.9'
<br />n Electric
<br />16-1600
<br />26A
<br />PD- Site Underground
<br />Material
<br />$ 1,743.00
<br />$ -
<br />$ -
<br />$ 1,743.00
<br />$ 87.00
<br />$ 174.00
<br />$ 261.00
<br />14.97%
<br />$ 1,482.00
<br />$ 13.0!
<br />n Electric
<br />16-1600
<br />26A
<br />PD- Site Underground
<br />Labor
<br />$ 4,718.00
<br />$ -
<br />$ -
<br />$ 4,718.00
<br />$ 236.00
<br />$ 472.00
<br />$ 708.00
<br />15.01%
<br />$ 4,010.00
<br />$ 35.41
<br />n Electric
<br />16-1600
<br />26A
<br />PD - Site Pole Base
<br />Material
<br />$ 2,464.00
<br />$ -
<br />$ -
<br />$ 2,464.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 2,464.00
<br />$ -
<br />n Electric
<br />16-1600
<br />26A
<br />PD - Site Pole Base
<br />Labor
<br />$ 2,177.00
<br />$ -
<br />$ -
<br />$ 2,177.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 2,177.00
<br />$ -
<br />n Electric
<br />16-1600
<br />26A
<br />PD - Site Set Parking Lot Poles
<br />$ 1,261.00
<br />$ -
<br />$ -
<br />$ 1,261.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 1,261.00
<br />$ -
<br />nElectric
<br />16-1600
<br />26A
<br />PD- Switchgear/Panels Install
<br />Material
<br />$ 1,514.00
<br />$ -
<br />$ -
<br />$ 1,514.00
<br />$ 303.00
<br />$ 757.00
<br />$ 1,060.00
<br />70.01%
<br />$ 454.00
<br />$ 53.01
<br />n Electric
<br />16-1600
<br />26A
<br />PD- Switchgear/Panels Install
<br />Labor
<br />$ 2,330.00
<br />$ -
<br />$ -
<br />$ 2,330.00
<br />$ 466.00
<br />$ 1,165.00
<br />$ 1,631.00
<br />70.00%
<br />$ 699.00
<br />$ 81.5'
<br />n Electric
<br />16-1600
<br />26A
<br />PD - Light Fixture Install
<br />Material
<br />$ 5,897.00
<br />$ -
<br />$ -
<br />$ 5,897.00
<br />$ 1,180.00
<br />$ 1,769.00
<br />$ 2,949.00
<br />50.01%
<br />$ 2,948.00
<br />$ 147.4!
<br />n Electric
<br />16-1600
<br />26A
<br />PD - Light Fixture Install
<br />Labor
<br />$ 18,365.00
<br />$ -
<br />$ -
<br />$ 18,365.00
<br />$ 3,673.00
<br />$ 5,510.00
<br />$ 9,183.00
<br />50.00%
<br />$ 9,182.00
<br />$ 459.1!
<br />n Electric
<br />16-1600
<br />26A
<br />PD - Light Fixture Control Install
<br />Material
<br />$ 2,664.00
<br />$ -
<br />$ -
<br />$ 2,664.00
<br />$ 533.00
<br />$ 799.00
<br />$ 1,332.00
<br />50.00%
<br />$ 1,332.00
<br />$ 66.61
<br />n Electric
<br />16-1600
<br />26A
<br />PD- Light Fixture Control Install
<br />Labor
<br />$ 6,322.00
<br />$ -
<br />$ -
<br />$ 6,322.00
<br />$ 1,265.00
<br />$ 1,897.00
<br />$ 3,162.00
<br />50.02%
<br />$ 3,160.00
<br />$ 158.11
<br />n Electric
<br />16-1600
<br />26A
<br />PD- Precast Rough-In's
<br />Material
<br />$ 584.00
<br />$ -
<br />$ -
<br />$ 584.00
<br />$ 584.00
<br />$ 584.00
<br />100.00'/
<br />$ -
<br />$ 29.21
<br />n Electric
<br />16-1600
<br />26A
<br />PD- Precast Rough-In's
<br />Labor
<br />$ 4,135.00
<br />$ -
<br />$ -
<br />$ 4,135.00
<br />$ 4,135.00
<br />$ 4,135.00
<br />100.00%
<br />$ -
<br />$ 206.7!
<br />n Electric
<br />16-1600
<br />26A
<br />PD- Power/Devices/Receptacles
<br />Material
<br />$ 8,409.00
<br />$ -
<br />$ -
<br />$ 8,409.00
<br />$ 2,523.00
<br />$ 841.00
<br />$ 3,364.00
<br />40.00%
<br />$ 5,045.00
<br />$ 168.21
<br />n Electric
<br />16-1600
<br />26A
<br />PD- Power/Devices/Receptacles
<br />Labor
<br />$ 17,640.00
<br />$ -
<br />$ -
<br />$ 17,640.00
<br />$ 5,292.00
<br />$ 1,764.00
<br />$ 7,056.00
<br />40.00%
<br />$ 10,584.00
<br />$ 352.81
<br />n Electric
<br />16-1600
<br />26A
<br />PD-Unit Heaters
<br />Material
<br />$ 200.00
<br />$ -
<br />$ -
<br />$ 200.00
<br />$ -
<br />$ 60.00
<br />$ 60.00
<br />30.00%
<br />$ 140.00
<br />$ 3.01
<br />n Electric
<br />16-1600
<br />26A
<br />PD-Unit Heaters
<br />Labor
<br />$ 477.00
<br />$ -
<br />$ -
<br />$ 477.00
<br />$ -
<br />$ 143.00
<br />$ 143.00
<br />29.98%
<br />$ 334.00
<br />$ 7.1!
<br />n Electric
<br />16-1600
<br />26A
<br />PD - Exhaust Fans
<br />Material
<br />$ 482.00
<br />$ -
<br />$ -
<br />$ 482.00
<br />$ 96.00
<br />$ 96.00
<br />$ 192.00
<br />39.83%
<br />$ 290.00
<br />$ 9.61
<br />n Electric
<br />16-1600
<br />26A
<br />PD- Exhaust Fans
<br />Labor
<br />$ 1,132.00
<br />$ -
<br />$ -
<br />$ 1,132.00
<br />$ 226.00
<br />$ 226.00
<br />$ 452.00
<br />39.93%
<br />$ 680.00
<br />$ 22.61
<br />n Electric
<br />16-1600
<br />26A
<br />PD- Boilers
<br />Material
<br />$ 196.00
<br />$ -
<br />$ -
<br />$ 196.00
<br />$ -
<br />$ 59.00
<br />$ 59.00
<br />30.10%
<br />$ 137.00
<br />$ 2.9!
<br />n Electric
<br />16-1600
<br />26A
<br />PD- Boilers
<br />Labor
<br />$ 339.00
<br />$ -
<br />$ -
<br />$ 339.00
<br />$ -
<br />$ 102.00
<br />$ 102.00
<br />30.09%
<br />$ 237.00
<br />$ 5.11
<br />n Electric
<br />16-1600
<br />26A
<br />PD - Pumps
<br />Material
<br />$ 883.00
<br />$ -
<br />$ -
<br />$ 883.00
<br />$ 706.00
<br />$ 706.00
<br />79.95%
<br />$ 177.00
<br />$ 35.31
<br />n Electric
<br />16-1600
<br />26A
<br />PD-Pumps
<br />Labor
<br />$ 2,583.00
<br />$ -
<br />$ -
<br />$ 2,583.00
<br />$ 2,066.00
<br />$ 2,066.00
<br />79.98%
<br />$ 517.00
<br />$ 103.31
<br />n Electric
<br />16-1600
<br />26A
<br />PD-MAU
<br />Material
<br />$ 219.00
<br />$ -
<br />$ -
<br />$ 219.00
<br />$ -
<br />$ 164.00
<br />$ 164.00
<br />74.89%
<br />$ 55.00
<br />$ 8.21
<br />n Electric
<br />16-1600
<br />26A
<br />PD - MAU
<br />Labor
<br />$ 979.00
<br />$ -
<br />$ -
<br />$ 979.00
<br />$ -
<br />$ 734.00
<br />$ 734.00
<br />74.97%
<br />$ 245.00
<br />$ 36.71
<br />n Electric
<br />16-1600
<br />26A
<br />PD - RTU-1
<br />Material
<br />$ 492.00
<br />$ -
<br />$ -
<br />$ 492.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 492.00
<br />$ -
<br />nElectric
<br />16-1600
<br />26A
<br />PD-RTU-1
<br />Labor
<br />$ 530.00
<br />$ -
<br />$ -
<br />$ 530.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 530.00
<br />$ -
<br />nElectric
<br />16-1600
<br />26A
<br />PD- Audio Visual Rough-In's
<br />Material
<br />$ 1,146.00
<br />$ -
<br />$ -
<br />$ 1,146.00
<br />$ 229.00
<br />$ 229.00
<br />$ 458.00
<br />39.97%
<br />$ 688.00
<br />$ 22.91
<br />n Electric
<br />16-1600
<br />26A
<br />PD -Audio Visual Rough-in's
<br />Labor
<br />$ 2,197.00
<br />$ -
<br />$ -
<br />$ 2,197.00
<br />$ 439.00
<br />$ 439.00
<br />$ 878.00
<br />39.96%
<br />$ 1,319.00
<br />$ 43.91
<br />n Electric
<br />16-1600
<br />26A
<br />PD- Security Rough-in's
<br />Material
<br />$ 1,184.00
<br />$ -
<br />$ -
<br />$ 1,184.00
<br />$ -
<br />$ 396.00
<br />$ 396.00
<br />33.45%
<br />$ 788.00
<br />$ 19.81
<br />n Electric
<br />16-1600
<br />26A
<br />PD- Security Rough-In's
<br />Labor
<br />$ 3,376.00
<br />$ -
<br />$ -
<br />$ 3,376.00
<br />$ -
<br />$ 844.00
<br />$ 844.00
<br />25.00%
<br />$ 2,532.00
<br />$ 42.21
<br />n Electric
<br />16-1600
<br />26A
<br />PD - Fire Alarm Rough-In's
<br />Material
<br />$ 368.00
<br />$ -
<br />$ -
<br />$ 368.00
<br />$ 74.00
<br />$ 202.00
<br />$ 276.00
<br />75.00%
<br />$ 92.00
<br />$ 13.81
<br />n Electric
<br />16-1600
<br />26A
<br />PD - Fire Alarm Rough-In's
<br />Labor
<br />$ 1,786.00
<br />$ -
<br />$ -
<br />$ 1,786.00
<br />$ 357.00
<br />$ 982.00
<br />$ 1,339.00
<br />74.97%
<br />$ 447.00
<br />$ 66.9!
<br />n Electric
<br />16-1600
<br />26A
<br />PD-DATA Rough-In's
<br />Material
<br />$ 678.00
<br />$ -
<br />$ -
<br />$ 678.00
<br />$ 136.00
<br />$ 203.00
<br />$ 339.00
<br />50.00%
<br />$ 339.00
<br />$ 16.9'
<br />n Electric
<br />16-1600
<br />26A
<br />PD-DATA Rough-In's
<br />Labor
<br />$ 1,752.00
<br />$ -
<br />$ -
<br />$ 1,752.00
<br />$ 351.00
<br />$ 526.00
<br />$ 877.00
<br />50.06%
<br />$ 875.00
<br />$ 43.8!
<br />n Electric
<br />16-1600
<br />26A
<br />CO#1ASI#6
<br />$ -
<br />$ -
<br />$ 773.00
<br />$ 773.00
<br />$ 484.00
<br />$ 289.00
<br />$ 773.00
<br />100.00%
<br />$ -
<br />$ 38.6!
<br />n Electric
<br />16-1600
<br />26A
<br />CO#2 Rough -in for future PD heat
<br />$ -
<br />$ -
<br />$ 2,612.00
<br />$ 2,612.00
<br />$ 2,612.00
<br />$ 2,612.00
<br />100.00%
<br />$ -
<br />$ 130.61
<br />n Electric
<br />16-1600
<br />26A
<br />CO#3 COR#27 PD Cabinet Lighting
<br />$ -
<br />$ -
<br />$ 965.00
<br />$ 965.00
<br />$ 965.00
<br />$ 965.00
<br />100.00%
<br />$ -
<br />$ 48.2!
<br />n Electric
<br />16-1600
<br />26A
<br />CO#4 PR#04R
<br />$ -
<br />$ -
<br />$ 2,267.00
<br />$ 2,267.00
<br />$ -
<br />$ 453.00
<br />$ 453.00
<br />19.98%
<br />$ 1,814.00
<br />$ 22.6'
<br />n Electric
<br />16-1600
<br />26A
<br />CO#5 PR#06R
<br />$ -
<br />$ -
<br />$ (1,050.00)
<br />$ (1,050.00)
<br />$ -
<br />$ -
<br />0.00%
<br />$ (1,050.00)
<br />$ -
<br />n Electric
<br />16-1600
<br />26A
<br />CO#6 PR#11
<br />$ -
<br />$ -
<br />$ 713.00
<br />$ 713.00
<br />$ 713.00
<br />$ 713.00
<br />100.00'/
<br />$ -
<br />$ 35.6!
<br />n Electric
<br />16-1600
<br />26A
<br />CO#7 COR#32 Light Demo PD Level 2
<br />$ -
<br />$ -
<br />$ 380.00
<br />$ 380.00
<br />$ 380.00
<br />$ 380.00
<br />100.00%
<br />$ -
<br />$ 19.01
<br />n Electric
<br />16-1600
<br />26A
<br />CO#8 PR#12
<br />$ -
<br />$ -
<br />$ 2,282.00
<br />$ 2,282.00
<br />$ 1,825.00
<br />$ 228.00
<br />$ 2,053.00
<br />89.96%
<br />$ 229.00
<br />$ 102.6!
<br />n Electric
<br />16-1600
<br />26A
<br />CO#9 Backcharge for Wall Tile (Non-OC $-150)
<br />$ -
<br />$ -
<br />$ (150.00)
<br />$ (150.00)
<br />$ (150.00)
<br />$ (150.00)1
<br />100.00%
<br />$ -
<br />$ (7.51
<br />
|