Laserfiche WebLink
Document G701™ – 2017 <br />Change Order <br />AIA Document G701™ – 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The “American <br />Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document <br />was produced by AIA software at 11:01:19 ET on 05/06/2021 under Order No.9712742774 which expires on 08/13/2021, is not for resale, is licensed for one-time <br />use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. <br />User Notes: (3B9ADA4B) <br />1 <br />PROJECT: (Name and address)CONTRACT INFORMATION:CHANGE ORDER INFORMATION: <br />108820 Elk River Municipal Utilities - <br />Field Services Building <br />Contract For: Construction Manager at <br />Risk <br />Change Order Number: 001 <br />Elk River Date: January 12, 2021 Date: May 6, 2021 <br />OWNER: (Name and address)ARCHITECT: (Name and address)CONTRACTOR: (Name and address) <br />Elk River Municipal Utilities Kodet Architectural Group Ltd RJM Construction <br />1705 Main St. <br />Elk River, MN 55330      <br />15 Groveland Terrace <br />Minneapolis, MN 55403      <br />830 Boone Avenue North <br />Golden Valley, MN 55427      <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments <br />attributable to executed Construction Change Directives.) <br />Owner accepts Alternate #4 (Individual VAV at Offices). The contract is to be increased by $25,759.00.      <br />The original Guaranteed Maximum Price was $12,180,926.00 <br />The net change by previously authorized Change Orders $0.00 <br />The Guaranteed Maximum Price prior to this Change Order was $12,180,926.00 <br />The Guaranteed Maximum Price will be increased by this Change Order in the amount of $25,759.00 <br />The new Guaranteed Maximum Price including this Change Order will be $12,206,685.00 <br />The Contract Time will be unchanged by Zero (0) days. <br />The new date of Substantial Completion will be 8/12/22 <br />NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract <br />Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />Kodet Architectural Group Ltd RJM Construction Elk River Municipal Utilities <br />ARCHITECT (Firm name)CONTRACTOR (Firm name)OWNER (Firm name) <br />SIGNATURE SIGNATURE SIGNATURE <br />Edward Daniel Kodet III, AIA Chris Kerzman <br />PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE <br />DATE DATE DATE <br />5/6/2021 <br />273