My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-18-2005 CC MIN
ElkRiver
>
City Government
>
City Council
>
Council Minutes
>
City Council 1974 - Present
>
2000-2009
>
2005
>
07-18-2005 CC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:23 AM
Creation date
8/5/2005 3:00:53 PM
Metadata
Fields
Template:
City Government
type
CCM
date
7/18/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />City Council Minutes <br />July 18, 2005 <br /> <br />Page 11 <br /> <br />6.2. <br /> <br />Consider Public Works Building Expansion Bids <br /> <br />Street Superintendent Phil Hals stated he has received bids for the construction of a cold <br />storage building and a salt/sand storage building. He stated the bid for the cast in place <br />foundation came in $150,000 higher than estimated. He recommended rejecting all bids and <br />redesigning the cold storage building and bidding a fabric covered salt/sand building. <br /> <br />Councilmember Dietz questioned if the fabric structure building would be allowed under the <br />new fabric structure ordinance that was adopted earlier this evening. <br /> <br />Mr. Hals stated he would need to verify with the director of planning if it would be allowed. <br /> <br />MOVED BY COUNCILMEMBER FARBER AND SECONDED BY <br />COUNCILMEMBER DIETZ TO REJECT ALL BIDS FOR THE COLD <br />STORAGE BUILDING, SALT/SAND STORAGE BUILDING, AND THE CAST <br />IN PLACE FOUNDATIONS AND TO RE-ADVERTISE FOR A REDESIGNED <br />COLD STORAGE BUILDING AND A FABRIC COVERED SALT/SAND <br />STRUCTURE. MOTION CARRIED 5-0. <br /> <br />6.3. Consider 2005 Sealcoat Bids <br /> <br />Street Superintendent Phil Hals stated bids have been received for the 2005 Sealcoat <br />Improvement. He reviewed the bids. Allied Blacktop Company at $72,197.66 was the low <br />bidder. <br /> <br />MOVED BY COUNCILMEMBER FARBER AND SECONDED BY <br />COUNCILMEMBER GUMPHREY TO ADOPT RESOLUTION 05-77 <br />ACCEPTING BID AND AUTHORIZING EXECUTION OF CONTRACT IN <br />THE MATTER OF THE SEALCOATING IMPROVEMENT OF 2005. <br /> <br />MOTION CARRIED 5-0. <br /> <br />6.4. Consider 2006 Benefit Level for the Elk River Fire Relief Association <br /> <br />Finance and Administrative Services Director Lori Johnson stated the Elk River Fire Relief <br />Association is requesting an increase in the benefit level for 2006 from 4,000 to $4,175. She <br />explained that the Relief Association projects that the funding level would increase from <br />98.9% in 2004 to 99.2% in 2005 and to 101.2% in 2006 including the increase to $4,175.00. <br /> <br />MOVED BY COUNCILMEMBER GUMPHREY AND SECONDED BY <br />COUNCILMEMBER DIETZ TO INCREASE THE FIRE RELIEF FUND PER <br />YEAR OF SERVICE BENEFIT LEVEL TO $4,175 PER YEAR FOR 2006 AND <br />TO AUTHORIZE PAYMENT OF THE BUDGETED 2005 PENSION <br />CONTRIBUTION TO THE RELIEF ASSOCIATION IN THE AMOUNT OF <br />$28,100. MOTION CARRIED 5-0. <br /> <br />The Mayor and Council thanked the Relief Association and the firefighters for doing a great <br />job for the city. <br />
The URL can be used to link to this page
Your browser does not support the video tag.