My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 04-23-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2021
>
04-27-2021
>
5.1. PCSR 04-23-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 10:50:01 AM
Creation date
4/23/2021 11:35:01 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
4/26/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. mill not involve uses, activities,processes, materials, equipment and conditions of operation that mill be detrimental to any <br /> persons or property because of excessive traffic, noise, smoke,fumes,glare, odors, dust or vibrations. <br /> The existing substation and peaking station may create excessive noise or vibrations when in operation, <br /> however there are no proposed changes to their operation and the city is not aware of complaints <br /> regarding their operation. <br /> Staff does not see a need to impose specific conditions to satisfy this standard. <br /> 6. mill not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance. <br /> The use will not result in the destruction,loss or damage of a natural, scenic or historic feature of major <br /> importance. The final stages of demolition related to the ERS will include work along the Mississippi <br /> River, but those are being addressed through a separate permitting process. Natural habitats will be <br /> improved with the pollinator habitat proposed to replace the power plant. <br /> Staff does not see a need to impose specific conditions to satisfy this standard. <br /> 7. mill fully coipywitb all other requirements of this Code, ' din any applicable requirements and standards for the <br /> issuance of a license or permit to establish and operate the proposed use in the city. <br /> The use will fully comply with all other requirements of this Code,including any applicable requirements <br /> and standards for the issuance of a license or permit to establish and operate the proposed use in the city. <br /> Staff does not see a need to impose specific conditions to satisfy this standard. <br /> If denial of such a permit should occur,it shall accompany recommendations or determinations by findings or a <br /> report stating how the proposed use does not comply with the standards set forth in Section 30-654. <br /> Financial Impact <br /> None <br /> Mission/Policy/Goal <br /> ■ Meet changing needs -Agile <br /> Attachments <br /> ■ Location Map <br /> ■ Applicant's Narrative <br /> ■ Site Plans <br />
The URL can be used to link to this page
Your browser does not support the video tag.