My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4 SR 04-19-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
04-19-2021
>
4.4 SR 04-19-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2021 10:38:38 AM
Creation date
4/16/2021 8:54:15 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Elk River Design Standards <br />A. Flushing: <br />After the applicable retention period, heavily chlorinated water shall not remain in <br />prolonged contact with the pipe. Chlorinated water shall be flushed from the main until <br />chlorine concentration is no higher than generally in the system for domestic use. <br />The environment to which the chlorinated water is to be discharged shall be inspected. <br />The Contractor shall be responsible to ensure that the receiving area is not damaged by <br />the chlorinated water and shall use a reducing agent for neutralization when necessary. <br />B. Bacteriological Tests: <br />After final flushing and before the watermain is placed in service, samples of water shall <br />be collected from the end of the main and each branch line for testing for bacteriological <br />quality in accordance with Standard Methods for the Examination of Water and <br />Wastewater, and shall show the absence of coliform organisms. Samples shall be at a rate <br />of one per every 1000 feet of pipe. One sample shall be taken a minimum of 24 hours <br />after flushing. A higher rate of sampling may be required to include all branch line. If <br />water in the pipe does not meet the Minnesota Department of Health requirements, <br />disinfection procedure shall be repeated until meeting the requirements. The pulling of <br />all samples shall be witnessed by a representative of Elk River Municipal Utilities. <br />Electrical Conductivity Tests <br />A conductivity test within one week after completion of pressure testing of the watermain on all <br />ductile iron pipe watermain will be required. <br />On watermain reconstruction projects, the Contractor shall perform the conductivity test prior <br />to service line reconnections to ensure main line isolation from house services. <br />The system (pipeline, valves, fittings and hydrants) shall be tested for electrical continuity and <br />current capacity. The electrical test shall be made after the hydrostatic pressure test and while <br />the line is at normal operating pressure. Backfilling shall have been completed. The line may be <br />tested in sections of convenient length as approved by ERMU. <br />Direct current of 350 amperes plus or minus 10%, shall be passed through the pipeline for 5 <br />minutes. Current flow through the pipe shall be measured continuously on a suitable ammeter <br />and shall remain steady without interruption or fluctuation throughout the 5-minute test period. <br />Insufficient current or intermittent current or arcing, indicated by large fluctuation of the <br />ammeter needle, shall be evidence of defective contact in the pipeline. The cause shall be <br />isolated and corrected. Thereafter, the section in which the defective test occurred shall be <br />retested as a unit and shall meet the requirements. <br />Sources of D.C. for these tests may be motor generators, arc welding machines, or other <br />approved sources. All such equipment shall be furnished by the Contractor. <br />Cables from the power source to the section of system under test should be of sufficient size to <br />carry the test current without overheating or excessive voltage drop. <br />Electrical conductivity testing shall not be performed on plastic or HDPE watermain. Tracer <br />(location) testing of all watermain shall be completed after all service installations have been <br />completed. <br />END OF SECTION 3400 <br />© City of Elk River, Minnesota — All rights reserved 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.