Laserfiche WebLink
City of Elk River Design Standards <br />DUCTILE IRON PIPE SADDLE REQUIREMENT <br />Special Class 52 <br />Special Class 50 <br />Pipe Size Inches <br />4 <br />6 <br />8 10 <br />12 14 16 <br />18 <br />20 <br />24 <br />Wall Thickness Inches <br />.29 <br />.31 <br />.33 .35 <br />.31 .33 .34 <br />.35 <br />.36 <br />.38 <br />Corporation Stop <br />Pipe Thickness in Inches <br />Inches <br />Required for 3 Corporation Stop Threads <br />Above Line - Without Saddle <br />3 /4 <br />.31 <br />.28 <br />.27 .26 .25 .25 .25 <br />.24 <br />.24 <br />.24 <br />1 <br />.38 <br />.34 <br />.32 .31 .30 .29 .29 <br />.28 <br />.28 <br />.27 <br />1-1/4 <br />.45 <br />.39 <br />.36 .34 .33 .32 .31 <br />.30 <br />.30 <br />.30 <br />1-1/2 <br />.44 <br />.40 .37 .35 .34 .33 <br />.32 <br />.32 <br />.31 <br />2 <br />.48 .44 .41 .39 .37 <br />.36 <br />.35 <br />.33 <br />Below Line - With Saddle <br />The flaring of copper tubing ends shall be accomplished only with the use of the proper <br />size and type of tools as designated for the purpose, and will provide accurate sizing and <br />rounding of the ends. Tubing shall be cut squarely and all edge roughness shall be removed <br />prior to flaring. All couplings shall be tightened securely, so the flared end fits snugly <br />against the bevel of the fitting without leakage. The flared joint couplings shall be made <br />up without the use of jointing compounds. <br />Unless otherwise indicated, tap service lines shall be installed on a straight line at right <br />angles to the watermain or property line. The service line shall be terminated with a curb <br />stop and box at the property line. When the service lines are to be terminated beyond the <br />curb stop and box at the property line, then the service line extension shall be terminated <br />with a compression fitting and cap, suitable to pressure test against. This longer service <br />line may be required to avoid future sidewalk disruption or conflicts with utility lines within <br />the utility easement along the front of the lot line. <br />The service pipe and curb stop coupling depth shall be such as to maintain not less than <br />7.5-foot minimum cover, or in locations where conflict may occur with storm sewer, <br />service pipe shall be placed at least 3 feet below the storm sewer invert or shall be insulated. <br />The service box shall be screwed onto the curb stop coupling and be firmly supported on <br />a concrete block. Service boxes shall be installed plumb and be braced effectively to <br />remain vertical during and after completion of backfilling. The service boxes shall be <br />brought to final surface grade when the final ground surface has been established. <br />Setting Valves, Hydrants, and Fittings <br />Hydrants shall be installed plumb. The large pumper nozzle shall be oriented squarely facing the <br />street. If the hydrant installation results in the pumper nozzle not facing the street, the hydrant <br />head shall be rotated accordingly. The traffic flange of the hydrant shall be set with the bottom <br />of the flange 2 inches above finish grade. When a hydrant barrel extension is installed the traffic <br />flange shall be adjusted to remain at 2 inches above the finish grade. <br />© City of Elk River, Minnesota -All rights reserved 13 <br />