My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4 SR 04-19-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
04-19-2021
>
4.4 SR 04-19-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2021 10:38:38 AM
Creation date
4/16/2021 8:54:15 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Elk River Design Standards <br />An integral stem nut design in those sizes is not allowed. <br />E. All body to body bolting material shall be Type 304 SS, develop the physical strength <br />characteristics of ASTM A307 and shall have the dimensional requirements of AWWA C- <br />515 and ANSI 18.2.1. All body to bonnet bolting shall be of the same size and length. <br />All bolts shall have square or hexagonal heads. Metric bolts, socket head cap screws, or <br />recessed alien -head type bolts filled with hot -melt type wax will not be allowed. <br />F. Designs employing two-piece independent thrust collars will not be allowed. All stem <br />diameters and the prescribed number of turns to open shall be as detailed in the <br />applicable portions of Table 4 of AWWA C-515. The stem o-rings above the thrust <br />collar shall be replaceable with the valve fully open and while subjected to full working <br />pressure. 0-rings set in a cartridge type design will not be allowed. Valve shall be <br />equipped with thrust washers above and below the thrust collar to reduce the operating <br />torque of the valve. <br />G. All internal and external surfaces of the valve shall be coated prior to assembly, with <br />epoxy. All valve body gaskets shall be of a pressure energized o-ring design. <br />H. All valves 14" and larger shall be equipped with lifting lugs or eyebolts for lifting. All <br />valves 16" and larger shall be equipped with bevel gearing for horizontal or spur gearing <br />for vertical installation to reduce operating torque. Valves equipped with bevel gears shall <br />be equipped with flushing ports on each wedge guide channel. Where allowable, valves <br />should be installed in the vertical position. Valves employing the use of an external and/or <br />integral by-pass for torque reduction are not allowed. <br />I. Valves shall be manufactured by a company domiciled in the United States, as well as have a <br />history in manufacturing Resilient Wedge Gate Valves greater than 25 years. All Resilient <br />Wedge Gate Valves shall be American Flow Control Series 2500 or Engineer pre - <br />approved equal. <br />J. Valve boxes shall be 51/4" diameter shaft suitable for T-6" of cover over the top of the <br />watermain. Boxes shall be cast iron screw type two-piece boxes with the word <br />"WATER" on the lid. Valve boxes shall be Tyler 6850 with 51/4" Drop Lid, or equal. <br />K. All valve boxes shall be installed upon the valve with the use of a Gate Valve Adaptor as <br />manufactured by Adaptor Inc. or approved equal. The adaptor shall be considered <br />incidental to the valve box installation. <br />10. Trace Wire <br />A. Open Trench - Trace wire shall be #12 AWG Copper Clad Steel, High Strength with <br />minimum 450lb. break load, with minimum 30 mil HDPE insulation thickness. <br />B. Directional Drilling/Boring - Trace wire shall be #12 AWG Copper Clad Steel, Extra <br />High Strength with minimum 1,150 lb. break load, with minimum 30 mil HDPE <br />insulation thickness. <br />C. Trace wire — Pipe Bursting/Slip Lining - Trace wire shall be 7 x 7 Stranded Copper Clad <br />Steel, Extreme Strength with 4,700 lb. break load, with minimum 50 ml HDPE insulation <br />thickness. <br />Construction <br />Wet Tap with Valve <br />The tapping sleeve and resilient seated gate valve assembly shall be installed on the watermain <br />pipe after thoroughly cleaning the pipe to be tapped. The sleeve shall be assembled on the pipe <br />and the bolts tightened per the manufacturer's specifications. <br />Shell cutters shall be the maximum size allowed for the tap being made. Size on size taps shall <br />utilize an inch undersized shell cutter. <br />Electrical conductivity straps shall be provided to bypass the tapping sleeve assembly. <br />© City of Elk River, Minnesota — All rights reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.