My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.5 SR 04-05-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
04-05-2021
>
8.5 SR 04-05-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2021 9:00:23 AM
Creation date
4/2/2021 10:29:15 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/5/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minnesota / Wisconsin Playground 03/12/2021 <br />5101 Highway 55, Suite 6000 Quote #100916-01-11 <br />Golden Valley, Minnesota 55422 <br />Ph. 800-622-5425 1 763-546-7787 <br />Fax 763-546-5050 1 tim@mnwiplay.com <br />CONSULTANT: TIM NEWGARD <br />City of Elk River- Youth Athletic Complex <br />Comments <br />Terms- <br />30% down, 20% due upon delivery of materials and the balance net 30 days. <br />Price Includes: <br />• 8' eave height, 3:12 roof pitch, designed for a standard 30 PSF live load & 90 MPH wind speed <br />• Kiln dried cedar, double T&G, nominal 4" x 8" exterior walls <br />• Powder coated steel columns <br />• Zinc plated fasteners, powder coated steel plates <br />• Roof decking shall consist of 2" x 6" nominal #1 SYP single T&G with a V-joint <br />• 2" x 8" cedar fascia <br />• Metal exterior doors, hardware included <br />• Interior walls are 2" x 4" site built construction with FRP panels in restroom area <br />• 1" x 4" S4S cedar trim & prebuilt, louvered red cedar vents <br />Excludes: Clear coat or stain and gutters & downspouts. Sodding, seeding or site restoration. <br />HGAC #PR11-20 <br />This quotation is subject to current Minnesota/Wisconsin Playground (MWP) policies as well as the following terms and conditions. Our quotation is <br />based on shipment of all items at one time to a single destination, unless noted, and changes are subject to price adjustment. Purchases in excess <br />of $1,000.00 to be supported by your written purchase order made out to Minnesota/Wisconsin Playground. <br />Each quote is handled on a per order/project basis. Unless a long-term agreement is in place between purchaser and MWP, terms and conditions <br />of this quotation shall be as outlined herein with no other requirements applicable. <br />Indemnification; Owner/Owner's Representative will indemnify and hold Minnesota Playground, Inc., dba, Minnesota Wisconsin Playground (MWP), <br />harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of Owner/Owner's Representative's <br />negligence or noncompliance with any of its commitments under this document. MWP will indemnify and hold Owner/Owner's Representative <br />harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of MWP's negligence or noncompliance <br />with any of its commitments under this document. <br />Pricing: f.o.b. factory, firm for 15 days from date of quotation. A tax-exempt certificate is needed at time of order entry for all orders whether from <br />tax -supported government agencies or not. Sales tax, if applicable, will be added at time of invoice unless a tax exempt certificate is provided at <br />time of order entry. <br />Unless already on file, please include a tax exempt certificate upon order entry whether a tax supported government agency or other. <br />Cedar Forest Products Shipment: order shall ship within (OPTION A for WOOD - eight to ten weeks) (OPTION B for METAL - ten to twelve <br />weeks after MWP's receipt and acceptance of your purchase order, color selections, preparation/creation of "stamped" drawings, if required, <br />approved submittals and receipt of deposit/full payment, if required. Receipt of anything other than what is stated herein will not constitute an order <br />and therefore no materials will be placed into production nor installation, if required, will be scheduled. <br />Freight charges: Prepaid & added <br />Wet Site Conditions: installation areas located near wetlands, where a high water table exists or in any environment that produces excessive <br />moisture will require additional planning prior to installation of your project. Unless excessively wet conditions have been conveyed prior to <br />installation quote and accounted for in some manner, your installation will not proceed. Ideal dry conditions need to be present to begin, and <br />complete, your project as quoted. <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.