My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.4 SR 04-05-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
04-05-2021
>
8.4 SR 04-05-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2021 8:59:58 AM
Creation date
4/2/2021 10:01:26 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/5/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minnesota / Wisconsin Playground <br />5101 Highway 55, Suite 6000 <br />Golden Valley, Minnesota 55422 <br />Ph. 800-622-5425 763-546-7787 <br />Fax 763-546-5050 tim@mnwiplay.com <br />CONSULTANT: TIM NEWGARD <br />03/29/2021 <br />Quote #100737-02-09 <br />City of Elk River- Orono Park- Sun Shelter Installation - D1054hH <br />City of Elk River <br />Attn: Michael Hecker <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />Phone: 763-635-1150 <br />mhecker@elkrivermn.gov <br />Ship to Zip 55330 <br />1 <br />INSTALL <br />Install - Install and Assembly of Orono Park - ROGS-2040 Shelter- <br />$21,630.00 <br />$21,630.00 <br />Shelter Assembly and Construction to Include: <br />Powder coated steel frame <br />SS Standing Seam Metal Roof <br />RD #1 Grade SYP T&G Roof Deck <br />Core Drill Anchors <br />1 <br />CONCRETE PAD <br />Other - Lump Sum - Concrete Pad at 4" depth with thickened edge as shown per <br />$16,830.00 <br />$16,830.00 <br />details for a 34' x 44' area. <br />1 <br />FOOTINGS <br />Other - Lump Sum - Supply and install quantity six 36" diameter x 5' depth concrete <br />$10,778.00 <br />$10,778.00 <br />footings - <br />Includes rebar as shown per footing details <br />1 <br />SAND BASE <br />Other - Lump Sum - Supply and install sand base at 4" depth for the 34' x 44' concrete <br />$2,618.00 <br />$2,618.00 <br />pad. <br />1 <br />INSTALL <br />Cedar Forest Products - Lump Sum - Option to unload shelter <br />$400.00 <br />$400.00 <br />1 <br />INSTALL <br />Cedar Forest Products - Lump Sum - Option for disposal of packaging materials <br />$440.00 <br />$440.00 <br />1 <br />FOOTING <br />Other - Lump Sum - Footing Inspection <br />$500.00 <br />$500.00 <br />INSPECTION <br />1 <br />Bond <br />Other - Performance Bond <br />$2,196.00 <br />$2,196.00 <br />1 <br />Permit <br />Other - City Permit <br />$610.00 <br />$610.00 <br />1 <br />EXCAVATE <br />Other - Lump Sum - excavate and stock pile an 8" depth of earth for a 1496 sq. ft. area <br />$1,188.00 <br />$1,188.00 <br />1 <br />DISPOSAL <br />Other - Lump Sum - Disposal of 38 cubic yards of excavated earth for the 1496 sq. ft. <br />$3,000.00 <br />$3,000.00 <br />area. <br />Sub Total <br />$60,190.00 <br />Comments <br />Owner / Customer must prepare the site and take care of any necessary demo prior to the new shelter installation. Clear <br />and open access to the <br />site must be provided. Excludes: Gutters & downspouts. Sodding, seeding or site restoration. <br />HGAC #PR11-20 <br />Terms: 30% down, 20% due upon delivery and the balance net 30 days. No retainage accepted. <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.