My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.4 SR 04-05-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
04-05-2021
>
8.4 SR 04-05-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2021 8:59:58 AM
Creation date
4/2/2021 10:01:26 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/5/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• • <br />aquatiox. <br />by landscape structures <br />Proposal for Installation Services <br />Project Name: Elk River — Splash Pad Installation <br />Proposal Submitted To: Chad Simich <br />Flagship Recreation <br />chad(afla2shipplay.com <br />Date of Proposal: March 4, 2021 <br />6500 Carlson Drive <br />Eden Prairie, MN 55346-1729 <br />Phone: 952-445-5135 <br />Fax: 952-345-6444 <br />www.fountaindesigns.com <br />WORK INCLUDED IN ESTIMATE: <br />• State Health Department submission and review fee's. <br />• Provide full time onsite project supervision for project construction and coordination. <br />• On site temporary power, water, waste and trash removal services. <br />• Site drainage as needed to prevent wash -outs, damage to installation work. <br />• Stripping of site vegetation and top soil. These materials to be stock piled on site. <br />• Installation and compaction of granular fill under splash pad. <br />• Bulk excavation, placement and backfilling for underground water reservoir. <br />• Bulk excavation and backfilling of plumbing trenches. <br />• Installation of all splash pad embed fixtures and route plumbing to equipment systems. <br />• Installation of splash pad recirculation systems as outlined in Aquatix proposal. <br />• Installation of prefabricated mechanical enclosure. <br />• Construction of 3,573 sq.ft. concrete area for splash pad and perimeter apron. Concrete apron to be 1,044 <br />sq.ft., 4" thick, wire mesh reinforced, 3500 psi concrete. Splash pad to be 2,529 sq.ft. 6" thick, 1/2" rebar <br />spaced 8" O.C. both ways, 3,500 psi concrete. Both Splash pad and apron to include expansion joint and <br />saw -cut joints as needed. <br />• Electrical power hookup to systems control panel and power distribution to pre -wired equipment skids, <br />water tank, activation bollard(s), waste valve boxes and any other system components. <br />• Grounding requirements for splash pad reinforcement, embeds and systems. <br />• Final hookup of water supply line to system mechanical float valve at water tank. <br />• Final hookup of waste piping from equipment systems and components. <br />• Final clean up of splash pad, equipment room and underground water reservoir prior to system startup. <br />• Splash pad system startup and balancing. <br />• Splash pad final site inspections as required by City and State Health Departments scheduling and <br />overview. <br />• Splash pad system operation instructions to owner's personnel. (Recommend owner to video tape this <br />training) <br />TOTAL PRICING: <br />Aquatix Installation Services Costs: $ 187,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.