My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.4 SR 04-05-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
04-05-2021
>
8.4 SR 04-05-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2021 8:59:58 AM
Creation date
4/2/2021 10:01:26 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/5/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A Sourcervell cooperative will also be utilized with Landscape Structures Inc. as the manufacturer and installation of <br />the splash pad. SRF will work with New Look Contracting to coordinate the electrical and mechanical system <br />improvements along with the entire construction areas to make sure the entire park grounds are prepared and <br />coordinated. <br />The toilet and park shelter buildings for the Orono Park project were designed and bid as pre-engineered <br />structures. The design team recommended this approach as it has been a successful delivery process for park <br />structures with other cities as well as the City of Elk River. The shelter facility matches the design features of the <br />shelters at Lion John Weicht Park and Woodland Trails Regional Park. The process for both the Orono and YAC <br />buildings saved the city $150,000 in costs over traditional field construction through a general contractor. <br />The prox card access will provide the public and city maintenance staff a prox card technology system so that staff <br />can program the building remotely to lock and unlock the Orono Toilet building. This will result in a substantial <br />labor savings by not requiring maintenance staff to do this daily. <br />The Parks and Recreation Commission recommended to update all the shelters at Orono Park. The shelter <br />proposed for this replacement is a basic design located in the Orono Park Master Plan and supported by the Parks <br />and Recreation Commission as ideal for summer camps and programming. <br />Staff estimates the cost to furnish the park with picnic tables, grills and benches is $60,000. Furnishings were not <br />calculated in the original Active Elk River costs. We expect to include this in the parks budget for 2022. <br />Financial Impact <br />See attached cost summary sheet <br />Mission/Policy/Goal <br />Opportunity to live, work, and play <br />Attachments <br />■ SRF Letter and Bid Tabulations <br />■ Contract Agreement with New Look Contracting <br />■ Minnesota Wisconsin Playgrounds Orono Park Toilet/Shelter Installation Price Proposals <br />■ Concept Design <br />■ Spohn Ranch Skate Park Construction Price Proposal <br />■ Landscape Structures, Inc. Splash Pad Price Proposal <br />■ Prox Card Technology Price Proposals from Helix Solutions and Pro Tech Design <br />■ Minnesota Wisconsin Playgrounds Orono Park Shelter Price Proposal <br />N:APublic Bodies\Agenda Packets\04-05-2021\Fugal\8.4 sr Active ER Orono Park.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.