My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.4 SR 04-05-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
04-05-2021
>
8.4 SR 04-05-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2021 8:59:58 AM
Creation date
4/2/2021 10:01:26 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/5/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minnesota / Wisconsin Playground <br />5101 Highway 55, Suite 6000 <br />Golden Valley, Minnesota 55422 <br />Ph. 800-622-5425 763-546-7787 <br />Fax 763-546-5050 tim@mnwiplay.com <br />CONSULTANT. TIM NEWGARD <br />03/21/2021 <br />Quote #100737-01-09 <br />City of Elk River- Orono Park- Parkaire Activity Center <br />City of Elk River <br />Ship to Zip 55330 <br />Attn: Michael Hecker <br />13065 Orono <br />Parkway <br />Elk River, MN 55330 <br />Phone: 763-635-1150 <br />mhecker@elkrivermn.gov <br />Quantity <br />Part # <br />Description F <br />■ <br />Unit Price <br />Amount <br />1 <br />PAC 4480 <br />Cedar Forest Products - Parkaire Activity Center ROGS3044-2T with PAC2550 15' x 40' <br />$197,854.00 <br />$197,854.00 <br />enclosed per drawing KLY-337 12-8-20 <br />1 <br />Option <br />Cedar Forest Products - VCP Vitreous China Plumbing Fixture Package <br />1 <br />Option <br />Cedar Forest Products - EFP Electrical Fixture Package <br />1 <br />ENG <br />Cedar Forest Products - Engineering - <br />Engineering drawings will include stamped plans for shelter above ground as well as <br />drawings for concrete footings below ground. <br />1 <br />Security <br />Other - Warning signs and caution tape- Fencing will be an additional charge. <br />1 <br />Inspection <br />Other - Inspection of Shelter <br />1 <br />Wall Tile <br />Other - Wall tile material and installation in the (4) Toilet Room as specified and full -height <br />$23,010.00 <br />$23,010.00 <br />1 <br />Cement Tile <br />Other - Provide cement tile backer board on interior face of exterior walls <br />$2,080.00 <br />$2,080.00 <br />Backer <br />1 <br />Wood <br />Other - Engineered wood siding with exterior sheathing and Tyvek as shown on exterior <br />$5,655.00 <br />$5,655.00 <br />Siding <br />elevations <br />1 <br />Painting <br />Other - Painting of building exterior & ceilings in Toilet Rooms <br />$2,145.00 <br />$2,145.00 <br />1 <br />Thin -Stone <br />Other - Thin -stone veneer and pre -cast concrete caps at the building's base, Shelter <br />$56,920.00 <br />$56,920.00 <br />Veneer <br />columns bases and the south canopy pier bases- all work included <br />1 <br />4 Urinals <br />Other - Four Urinals <br />$12,181.00 <br />$12,181.00 <br />1 <br />Stain <br />Other - Factory Stain <br />$9,906.00 <br />$9,906.00 <br />1 <br />Permit <br />Other - Shelter Permit <br />$5,425.03 <br />$5,425.03 <br />1 <br />Bond <br />Other - Performance Bond <br />$14,647.77 <br />$14,647.77 <br />1 <br />Benches <br />Other - 4 Wall Mounted Benches <br />$3,224.00 <br />$3,224.00 <br />1 <br />Ventilation <br />Other - Exhaust ventilation system <br />$1,300.00 <br />$1,300.00 <br />1 <br />Signage <br />Other - Metal curved signage band of each end of the shelter structures (2) <br />$7,074.00 <br />$7,074.00 <br />Sub Total <br />$341,421.80 <br />Total <br />i <br />Page 1 of 3 <br />up <br />
The URL can be used to link to this page
Your browser does not support the video tag.