<br />City of Elk River- Orono Park- Parkaire Activity Center Additions to
<br />Installation - D10441 T1
<br />Project Scope
<br />Please note, installation is based on site being ready prior to our arrival to install play equipment as well as site conditions that have been conveyed
<br />to our organization by the owner/owner's representative and/or ideal conditions existing for a timely completion of your project as quoted. Unless
<br />addressed prior to the installation quote being issued or specifically mentioned herein, any issues that arise that impede the progress/completion of
<br />your project as quoted will result in additional charges.
<br />Weather can change project scheduling in many ways. Take rain for an example. Day, or days, before rain... If weather forecasts show a high
<br />percentage chance for rain that will effect the site conditions, a postponement may be in order. Digging holes, laying certain surfacing materials,
<br />etc., are greatly affected by weather conditions and work may not begin/continue due to weather forecasts. There's the rain days themselves, which
<br />if heavy enough rainfall occurs, makes a site unworkable. Day, or days, after rain... Drying time will be needed after rain and the number of days
<br />needed will vary depending on amount of moisture received. One actual rain day may equal multiple delay days depending on work scheduled to
<br />be done.
<br />+ INCLUSIONS +
<br />+ One mobilization
<br />+ Public utility locates only
<br />+ Supply of materials as outlined on quote #_100737-01-02
<br />+ Marking and digging of footings holes to accept direct embedment supports as needed
<br />+ Unloading of Shelter
<br />+ Unpacking of shelter
<br />+ Assembly of shelter
<br />+ Concrete for footings / slab as needed
<br />+ Pouring of concrete for footings / slab
<br />+ Stone veneer on columns with footings and foundations below per revised drawings.
<br />+ Site work and digging holes for footings
<br />+ Packaging material disposal in 1 dumpster
<br />+ Construction tape/temporary bracing (as needed)
<br />+ Standard insurance offerings
<br />+ Standard warranty offerings
<br />+ Standard industry accepted labor wages
<br />+ Performance Bond
<br />+ City Permit
<br />EXCLUSIONS -
<br />Clear access path up to and into play area for installation equipment (minimum of 8-foot wide, includes but not limited to gates, walkways,
<br />driveways, etc.)
<br />Staging area for materials and installation equipment, trailers, etc.
<br />Unobstructed space for maneuvering installation equipment as well as performing work
<br />Security fencing of any type unless indicated on quote
<br />If fencing is in place (by others), ability to unlock fencing is to be provided to our office a minimum of one week prior to our start
<br />Private utility locates such as, but not limited to, irrigation, fiber optics, private lighting, etc.
<br />Accepting, unloading and storage of order(s)/shipment(s) prior to installation. Please note, orders can be packaged/shipped in large crates,
<br />pallets, etc., requiring heavy-duty equipment to unload.
<br />Sitework of any kind such as, but not limited to, grading (play area to have max slope of 1 %), site restoration, drainage, etc.
<br />Removal of existing play equipment, border, safety surfacing, etc.
<br />Backfill and compaction of backfill after removal of existing items (for footing holes as an example) that leave voids in area (marking and digging of
<br />new footing holes based on workable site)
<br />Digging in compacted sub -surfaces, rock, hard pan, tree roots, unstable soil conditions, etc.
<br />Restoration of compacted sub -surfaces for playground surfacings such as, but not limited to, poured -in -place rubber, rubber tiles, artificial turf, etc.
<br />Digging/maneuvering in sand, pea gravel, mud, etc.
<br />Offsite removal of spoils from footing holes (can be stockpiled near play area for owner/owner's representative removal or spread within play area)
<br />4